Description

This research develops heuristics for scheduling electric power production amid uncertainty. Reliability is becoming more difficult to manage due to growing uncertainty from renewable resources. This challenge is compounded by

This research develops heuristics for scheduling electric power production amid uncertainty. Reliability is becoming more difficult to manage due to growing uncertainty from renewable resources. This challenge is compounded by the risk of resource outages, which can occur any time and without warning. Stochastic optimization is a promising tool but remains computationally intractable for large systems.

Reuse Permissions
  • 5.91 MB application/pdf

    Download count: 0

    Details

    Contributors
    Date Created
    • 2015
    Resource Type
  • Text
  • Collections this item is in
    Note
    • Partial requirement for: Ph.D., Arizona State University, 2015
      Note type
      thesis
    • Includes bibliographical references (p. 208-223)
      Note type
      bibliography
    • Field of study: Industrial engineering

    Citation and reuse

    Statement of Responsibility

    by Joshua Daniel Lyon

    Machine-readable links