136994-Thumbnail Image.png
Description

The purpose of this project is to determine the feasibility of a water tunnel designed to meet certain constraints. The project goals are to tailor a design for a given

The purpose of this project is to determine the feasibility of a water tunnel designed to meet certain constraints. The project goals are to tailor a design for a given location, and to produce a repeatable design sizing and shape process for specified constraints. The primary design goals include a 1 m/s flow velocity in a 30cm x 30cm test section for 300 seconds. Secondary parameters, such as system height, tank height, area contraction ratio, and roof loading limits, may change depending on preference, location, or environment.

2.05 MB application/pdf

Download restricted. Please sign in.

Download count: 0

Details

Contributors
Date Created
  • 2014-05
Resource Type
  • Text
  • Machine-readable links