Description
Alternative Project Delivery Methods (APDMs), namely Design Build (DB) and Construction Manager at Risk (CMAR), grew out of the need to find a more efficient project delivery approach than the traditional Design Bid Build (DBB) form of delivery. After decades of extensive APDM use, there have been many studies focused on the use of APDMs and project outcomes.
Download count: 0
Details
Contributors
- Bingham, Evan Dale (Author)
- Gibson Jr., G. Edward (Thesis advisor)
- El Asmar, Mounir (Thesis advisor)
- Bearup, Wylie (Committee member)
- Arizona State University (Publisher)
Date Created
The date the item was original created (prior to any relationship with the ASU Digital Repositories.)
2014
Subjects
Resource Type
Collections this item is in
Note
- Partial requirement for: Ph.D., Arizona State University, 2014Note typethesis
- Includes bibliographical references (p. 165-169)Note typebibliography
- Field of study: Civil engineering
Citation and reuse
Statement of Responsibility
by Evan Dale Bingham