131351-Thumbnail Image.png
Description
The following report followed three separate construction crews at a construction site at ASU and performed labor productivity analysis to quantitatively measure the efficiency of the workers performing specific tasks. These crews were tasked with electrical wiring, concrete pouring, and

The following report followed three separate construction crews at a construction site at ASU and performed labor productivity analysis to quantitatively measure the efficiency of the workers performing specific tasks. These crews were tasked with electrical wiring, concrete pouring, and drywall sanding. Crew balance measured the down time of individual crew members compared to the overall time spent on a task, and the results of these observations were calculated, and suggested improvements given.
1.15 MB application/pdf

Download restricted. Please sign in.

Details

Title
  • Crew Balance in Construction Tasks for Productivity Analysis - A Sustainability Perspective
Contributors
Date Created
2020-05
Resource Type
  • Text
  • Machine-readable links