Services procured by government agencies are often ridden with delay and costly change orders. Government agencies may react to these failures by implementing restrictive terms and conditions intended to ensure that the service is delivered on time and within budget. While potentially helpful (and nearly always counterproductive), this approach often

Services procured by government agencies are often ridden with delay and costly change orders. Government agencies may react to these failures by implementing restrictive terms and conditions intended to ensure that the service is delivered on time and within budget. While potentially helpful (and nearly always counterproductive), this approach often fails to recognize the cause of the procurement failure \u2014 inadequate request for proposal (RFP) draftsmanship. The RFP must provide the vendor, or service provider, with a comprehensive understanding of the client's motivations for soliciting the bid, the environment in which the materials and services will be utilized, and accurate specifications for those materials and services. In summary, the RFP must be a clean and concise roadmap of client expectations. This thesis describes, for the novice RFP drafter, a value-based approach to preparing a request for proposal.
ContributorsWheeler, Brynn Marie (Author) / Sullivan, Kenneth (Thesis director) / Savicky, John (Committee member) / Hurtado, Kristen (Committee member) / Department of Supply Chain Management (Contributor) / Department of Marketing (Contributor) / Barrett, The Honors College (Contributor)
Created2018-05
134899-Thumbnail Image.png
Description
A public North American university needed a tool to automate their Vendor of Record rotation program. The goal was to give each vendor in the program fair opportunities and to be open and honest with how vendors were selected. This tool was created in Microsoft Excel with VBA to code

A public North American university needed a tool to automate their Vendor of Record rotation program. The goal was to give each vendor in the program fair opportunities and to be open and honest with how vendors were selected. This tool was created in Microsoft Excel with VBA to code macros. The three major Excel sheets are the Masters, the FM Interface, and the Executive Interface. The Masters act as a database and house data for each project. It is a plain Excel worksheet populated with tables. The FM Interface is a macro-enabled Excel workbook. It is distributed to every Facilities Manager in the program. The FM Interface communicates with the Masters in the background. The FMs use the various inputs and buttons to go through every step of procuring a project. They start by initializing a project, and are given a generated list of vendors who are qualified. This list is automatically rotated for every project. Then they fill in an RFQ and it is automatically emailed to the required vendors. When the Facilities Manager receives every quote, they input them into the program and they are saved to the database. When the project is complete, the manager must fill out a satisfaction survey to measure safety, cost, schedule, and quality of work. This is the main method of tracking vendor performance. The last sheet, the Executive Interface, is given only to the administrator of the program. It generates various reports, such as vendor performance, FM performance, and insurance status. It also has many administrative functions including insurance updating, vendor input, and delete project/vendor. The automated tool has been used without error on over 50 projects by 11 different Facilities Managers. The university's Facilities Management team is pleased with the automated process.
ContributorsSchneider, Steven Andrew (Author) / Sullivan, Kenneth (Thesis director) / Savicky, John (Committee member) / Mechanical and Aerospace Engineering Program (Contributor) / Barrett, The Honors College (Contributor)
Created2016-12
155709-Thumbnail Image.png
Description
ABSTRACT

The current Saudi Arabian (SA) procurement system leads to many losses in money and benefits in projects. Also, the use of the traditional procurement system in SA has been identified as one of the causes for poor performance in the delivery of construction and the major risk to the SA

ABSTRACT

The current Saudi Arabian (SA) procurement system leads to many losses in money and benefits in projects. Also, the use of the traditional procurement system in SA has been identified as one of the causes for poor performance in the delivery of construction and the major risk to the SA government. A questionnaire has been developed and carefully designed based on literature review. The purpose of the survey was to identify the validity of the recent claims that the procurement system in SA is broken and to improve the current SA procurement system. The questionnaire was sent out to 1,396 participants including included 867 engineers, 256 consultants, 93 contractors, 35 owners and 132 architects and 13 academics.

All participants have been registered and licensed professionals at the SA Council for professional engineers, who work in both private and public sectors. The participants are interested in the SA procurement and contracts system with experience ranging from one to more than twenty-five years with the majority of twenty-five years of experience in common construction sectors such as; residential and commercial buildings, healthcare buildings, industrial building and heavy civil construction.

Most of the participants from both private and public sectors agreed with the survey questions subject matter regarding: zone price proposals, contractors' evaluation, risks, planning, projects' scope, owners concern and weekly risks reports (WRR). The survey results showed that the procurement system is the major risk to projects, affects construction projects negatively and is in need of improvement.

Based on the survey and literature review, a model, called Saudi government performance procurement model (SGPPM), has been developed in which the most expert contractor is chosen through four phases: submittals& education, vendors selection, illustration and execution. The resulting model is easy to implement by SA government and does not require special skills or backgrounds.
ContributorsAlofi, Ahmed Abdulrahman (Author) / Kashiwagi, Dean (Thesis advisor) / Sullivan, Kenneth (Committee member) / Kashiwagi, Jacob (Committee member) / Arizona State University (Publisher)
Created2017
155681-Thumbnail Image.png
Description
The objective of the study was to examine the impact construction document deficiencies have on heavy/civil low-bid infrastructure projects. It encompasses the expertise of 202 heavy/civil construction professionals comprised of contactors and public project owners. The study was designed to determine the frequency and timing of when a contractor discovers

The objective of the study was to examine the impact construction document deficiencies have on heavy/civil low-bid infrastructure projects. It encompasses the expertise of 202 heavy/civil construction professionals comprised of contactors and public project owners. The study was designed to determine the frequency and timing of when a contractor discovers construction document deficiencies on heavy/civil low bid projects. The information was correlated with further study data of when a contractor ultimately reports the discovered construction document deficiencies to the public project owner. This research data was compiled and analyzed to determine if contractors are withholding construction document deficiencies from public owners until after the project contract has been executed. The withholding of document deficiencies can benefit contractors by resulting in additional owner incurred costs and potential justification for project time extensions. As a result, further research was required to examine the impact construction document deficiencies have on project cost and schedule. Based on the study findings, it has led to the development of a Contractor Document Review Assessment. The Contractor Document Review Assessment is a risk mitigation device in which contractors and public project owners can identify construction document deficiencies on heavy/civil low-bid construction projects before the project contract has been executed.
ContributorsPesek, Anthony Edward (Author) / Sullivan, Kenneth (Thesis advisor) / Badger, William (Committee member) / Bingham, Evan (Committee member) / Arizona State University (Publisher)
Created2017