Matching Items (9)
Filtering by

Clear all filters

151659-Thumbnail Image.png
Description
Utilizing the Arizona State University's Performance Based Studies Research Group, and their PIPS program, a roofing materials manufacturing company can evaluate performance of representatives, products and contractors. Service life of the systems can be tracked and customer satisfaction measured it provides an objective viable tool for the consumer to choose

Utilizing the Arizona State University's Performance Based Studies Research Group, and their PIPS program, a roofing materials manufacturing company can evaluate performance of representatives, products and contractors. Service life of the systems can be tracked and customer satisfaction measured it provides an objective viable tool for the consumer to choose a quality product and contractor without the distractions of marketing, promises, or a salesman's hype. Facilities purchasing a new roof system, can benefit from the information gathered as a guide in making sound, value based decisions. Creating a historical, concise and accurate documentation of roofing systems is a benefit to all involved. The procurement process, installation and longevity of the roofing systems can be tracked and graded.
ContributorsGreenfeld, Larry (Author) / Kashiwagi, Dean T. (Thesis advisor) / Sullivan, Kenneth T. (Committee member) / Badger, William W. (Committee member) / Arizona State University (Publisher)
Created2013
150165-Thumbnail Image.png
Description
As a term and method that is rapidly gaining popularity, Building Information Modeling (BIM) is under the scrutiny of many building professionals questioning its potential benefits on their projects. A relevant and accepted calculation methodology and baseline to properly evaluate BIM's benefits have not been established, thus there are mixed

As a term and method that is rapidly gaining popularity, Building Information Modeling (BIM) is under the scrutiny of many building professionals questioning its potential benefits on their projects. A relevant and accepted calculation methodology and baseline to properly evaluate BIM's benefits have not been established, thus there are mixed perspectives and opinions of the benefits of BIM, creating a general misunderstanding of the expected outcomes. The purpose of this thesis was to develop a more complete methodology to analyze the benefits of BIM, apply recent projects to this methodology to quantify outcomes, resulting in a more a holistic framework of BIM and its impacts on project efficiency. From the literature, a framework calculation model to determine the value of BIM is developed and presented. The developed model is applied via case studies within a large industrial setting where similar projects are evaluated, some implementing BIM and some with traditional non-BIM approaches. Cost or investment metrics were considered along with benefit or return metrics. The return metrics were: requests for information, change orders, and duration improvements. The investment metrics were: design and construction costs. The methodology was tested against three separate cases and results on the returns and investments are presented. The findings indicate that in the tool installation department of semiconductor manufacturing, there is a high potential for BIM benefits to be realized. The evidence also suggests that actual returns and investments will vary with each project.
ContributorsBarlish, Kristen Caroline (Author) / Sullivan, Kenneth T. (Thesis advisor) / Kashiwagi, Dean T. (Committee member) / Badger, William W. (Committee member) / Arizona State University (Publisher)
Created2011
150566-Thumbnail Image.png
Description
Commodity contracts are often awarded on the basis of price. A price-based methodology for making such awards fails to consider the suppliers' ability to minimize the risk of non-performance in terms of cost, schedule, or customer satisfaction. Literature suggests that nearly all risk in the delivery of commodities is in

Commodity contracts are often awarded on the basis of price. A price-based methodology for making such awards fails to consider the suppliers' ability to minimize the risk of non-performance in terms of cost, schedule, or customer satisfaction. Literature suggests that nearly all risk in the delivery of commodities is in the interfacing of nodes within a supply chain. Therefore, commodity suppliers should be selected on the basis of their past performance, ability to identify and minimize risk, and capacity to preplan the delivery of services. Organizations that select commodity suppliers primarily on the basis of price may experience customer dissatisfaction, delayed services, low product quality, or some combination thereof. One area that is often considered a "commodity" is the delivery of furniture services. Arizona State University, on behalf of the Arizona Tri-University Furniture Consortium, approached the researcher and identified concerns with their current furnishing services contract. These concerns included misaligned customer expectations, minimal furniture supplier upfront involvement on large capital construction projects, and manufacturer design expertise was not being utilized during project preplanning. The Universities implemented a best value selection process and risk management structure. The system has resulted in a 9.3 / 10 customer satisfaction rating (24 percent increase over the previous system), for over 1,100 furniture projects totaling $19.3M.
ContributorsSmithwick, Jake (Author) / Sullivan, Kenneth T. (Thesis advisor) / Kashiwagi, Dean T. (Committee member) / Badger, William W. (Committee member) / Arizona State University (Publisher)
Created2012
157195-Thumbnail Image.png
Description
The Vietnam Construction Industry (VCI) has been facing risks that cause delays, budget overrun, and low customer satisfaction that required continuously research efforts to manage them. This research assesses the current conditions of the VCI in terms of performance, common risks, and success factors; and explores the potential of using

The Vietnam Construction Industry (VCI) has been facing risks that cause delays, budget overrun, and low customer satisfaction that required continuously research efforts to manage them. This research assesses the current conditions of the VCI in terms of performance, common risks, and success factors; and explores the potential of using the Best Value Approach (BVA), an innovative procurement and project management technology, to improve overall VCI performance. VCI risk factors were presented in an analysis of the data collected from a survey that include the 23 common risk factors that cause non-performance in construction projects in developing countries. The factors were consolidated from an extensive literature reviews, and inputs were solicited from 103 construction practitioners in Vietnam. The study reveals the top five risk factors as the bureaucratic administrative system, financial difficulties of owner, slow payment of completed works, poor contractor performance, financial difficulties of contractor. Factor analysis explored the correlations among the risks and yielded four outcomes – Lack of Site and Legal Information, Lack of Capable Managers, Poor Deliverables Quality, and Owner’s Financial Incapability. VCI success factors were revealed from a survey that is adopted from 23 Critical Success Factors (CSFs) related to common construction risks, found through extensive literature reviews, and inputs were solicited from 101 VCI participants. The experts ranked those CSFs with respect to impact to project success. The study reveals the top impactful CSFs such as all project parties clearly understand their responsibilities, more serious consideration during contractor selection stage, test contractors’ experience and competency through successful projects in the past. Factor analysis was conducted to explore the principal success factor groupings and yielded four outcomes – Improving Management Capability, Adequate Pre-Planning, Stakeholders’ Management, and Performance-based Procurement. An analysis from six industry experts determined how current VCI conditions, namely risk and success factors, are related to BVA. Sixteen BVA success principles were identified and ranked based on their perceived impact to project performance by an industry survey with 98 VCI practitioners. The results show high agreement rate with all sixteen BVA principles. The majority of participants agreed that BVA would improve project performance and were interested in learning more about BVA. The results encourage further BVA testing and education in the VCI.
ContributorsLe, Nguyen Tran Khoi (Author) / Chong, Oswald W.K. (Thesis advisor) / Sullivan, Kenneth T. (Committee member) / Kashiwagi, Dean T. (Committee member) / Arizona State University (Publisher)
Created2019
155422-Thumbnail Image.png
Description
The performance of the Alpha Sprayed Polyurethane Foam (SPF) roofing system is perceived as not an economical option when compared to a 20-year modified bitumen roofing system. Today, the majority of roofs are being replaced, rather than newly installed. The coating manufacturer, Neogard, implemented the Alpha roofing program to identify

The performance of the Alpha Sprayed Polyurethane Foam (SPF) roofing system is perceived as not an economical option when compared to a 20-year modified bitumen roofing system. Today, the majority of roofs are being replaced, rather than newly installed. The coating manufacturer, Neogard, implemented the Alpha roofing program to identify the best contractors in the industry and to measure their roof performance. The Alpha roof system has shown consistent high performance on over 230 million square feet of surveyed roof. The author proposes to identify if the Alpha roof system is renewable, has proven performance that competes with the traditional modified roofing system, and is a more economical option by evaluating an Alpha roof system installation and the performance of a 29-year-old Alpha roof system. The Dallas Independent School District utilized the Alpha program for William Lipscomb Elementary School in 2016. Dallas Fort Worth Urethane installed the Alpha SPF roof system with high customer satisfaction ratings. This roofing installation showed the value of the Alpha roof system by saving over 20% on costs for the installation and will save approximately 69% of costs on the recoating of the roof in 20 years. The Casa View Elementary School roof system was installed with a Neogard Permathane roof system in 1987. This roof was hail tested with ten drops from 17 feet 9 inches of 1-3/4-inch steel ball (9 out of 10 passed) and four drops from 17 feet 9 inches with a 3-inch diameter steel ball (2 out of 4 passed). The analysis of the passing and failing core samples show that the thickness of the top and base Alpha SPF coating is one of the major differences in a roof passing or failing the FM-SH hail test. Over the 40-year service life, the main difference of purchasing a 61,000 square feet Alpha SPF roof versus modified bitumen roof are savings of approximately $1,067,500. Past hail tests on Alpha SPF roof systems show its cost effectiveness with high customer satisfaction (9.8 out of 10), an over 40-year service life after a $6.00/SF recoat and savings of over $1M for DISD.
ContributorsZulanas, Charles J., IV (Author) / Kashiwagi, Dean T. (Thesis advisor) / Kashiwagi, Jacob S (Thesis advisor) / Chong, Oswald (Committee member) / Arizona State University (Publisher)
Created2017
149322-Thumbnail Image.png
Description
The U.S. Army Medical Command has been testing a leadership based structure to increase the performance of delivering construction and facility services in its system of $600M of construction and 26 major hospital facilities in the U.S. The organizational requirement was to minimize the management and oversight of contractors

The U.S. Army Medical Command has been testing a leadership based structure to increase the performance of delivering construction and facility services in its system of $600M of construction and 26 major hospital facilities in the U.S. The organizational requirement was to minimize the management and oversight of contractors and simultaneously increase project performance. The research proposes that a leadership based structure can supplement the perception, preplanning, and risk minimization capability of a contractor's project manager, thus increasing the project performance (on time, within budget, and meeting expectations) and decreasing client management requirement. The projects were delivered in a best value and low price environment. The major impact of this research was that proactive management by contractors was more effective than traditional management such as direction, control, and inspection by client's professional representatives. The results based on data collection and date analyses validated that a leadership based structure can increase the performance of an organization and reduce its management requirement.
ContributorsMalhotra, Neha (Author) / Kashiwagi, Dean T. (Thesis advisor) / Sullivan, Kenneth (Committee member) / Badger, William (Committee member) / Arizona State University (Publisher)
Created2010
135520-Thumbnail Image.png
Description
With the help of some Information Measurement Theory (IMT), Kashiwagi Solutions Model (KSM), and deductive logic background, supply chain managers can start utilizing a new way to effectively and efficiently negotiate contracts. Developed by Dr. Dean Kashiwagi, the Best Value Approach has been 98% successful with over 1,800 projects for

With the help of some Information Measurement Theory (IMT), Kashiwagi Solutions Model (KSM), and deductive logic background, supply chain managers can start utilizing a new way to effectively and efficiently negotiate contracts. Developed by Dr. Dean Kashiwagi, the Best Value Approach has been 98% successful with over 1,800 projects for the past 20 years. The process gives vendors/suppliers the power to use their expertise. In return for not having to follow the rules set by the client/buyer, the vendor must show documentation and plans of risk management, value added processes, and metrics.
ContributorsPhan, Alice (Co-author) / Holtzman, Krista (Co-author) / Kashiwagi, Dean (Thesis director) / Kashiwagi, Jacob (Committee member) / School of International Letters and Cultures (Contributor) / Department of Supply Chain Management (Contributor) / Barrett, The Honors College (Contributor)
Created2016-05
156056-Thumbnail Image.png
Description
Construction industry performance (schedule, budget, and customer satisfaction) has not improved over the last 20 years. This investigation proposes that academic/industry research using actual project data may have more impact on improving industry performance than traditional survey-based research. The authors utilize the CIB and CIB W117 platforms to proliferate the

Construction industry performance (schedule, budget, and customer satisfaction) has not improved over the last 20 years. This investigation proposes that academic/industry research using actual project data may have more impact on improving industry performance than traditional survey-based research. The authors utilize the CIB and CIB W117 platforms to proliferate the concept of academic/industry test results to increase the impact on the construction industry. The authors propose to use the existing journal and then share the journal papers on an online platform (ResearchGate.net) ensuring a faster proliferation of the key academic/industry test results into the academic research community. The mechanism of the academic/industry test results will have more of an impact on industry practices than the traditional publication systems, which concentrate on literature reviews and surveys to collect industry opinions and analyze the information to change industry practices. The proliferation of industry research results will create transparency in the construction industry and the academic research community.
ContributorsGastelum, David (Author) / Kashiwagi, Dean T. (Thesis advisor) / Chong, Oswald (Committee member) / Badger, William (Committee member) / Arizona State University (Publisher)
Created2017
153203-Thumbnail Image.png
Description
Construction Management research has not been successful in changing the practices of the construction industry. The method of receiving grants and the peer review paper system that academics rely on to achieve promotion, does not align to academic researchers becoming experts who can bring change to industry practices. Poor construction

Construction Management research has not been successful in changing the practices of the construction industry. The method of receiving grants and the peer review paper system that academics rely on to achieve promotion, does not align to academic researchers becoming experts who can bring change to industry practices. Poor construction industry performance has been documented for the past 25 years in the international construction management field. However, after 25 years of billions of dollars of research investment, the solution remains elusive. Research has shown that very few researchers have a hypothesis, run cycles of research tests in the industry, and result in changing industry practices.

The most impactful research identified in this thesis, has led to conclusions that pre-planning is critical, hiring contractors who have expertise will result in better performance, and risk is mitigated when the supply chain partners work together and expertise is utilized at the beginning of projects.

The problems with construction non-performance have persisted. Legal contract issues have become more important. Traditional research approaches have not identified the severity and the source of construction non-performance. The problem seems to be as complex as ever. The construction industry practices and the academic research community remain in silos. This research proposes that the problem may be in the traditional construction management research structure and methodology. The research

has identified a unique non-traditional research program that has documented over 1700 industry tests, which has resulted in a decrease in client management by up to 79%, contractors adding value by up to 38%, increased customer satisfaction by up to 140%, reduced change order rates as low as -0.6%, and decreased cost of services by up to 31%.

The purpose of this thesis is to document the performance of the non-traditional research program around the above identified results. The documentation of such an effort will shed more light on what is required for a sustainable, industry impacting, and academic expert based research program.
ContributorsRivera, Alfredo O (Author) / Kashiwagi, Dean T. (Thesis advisor) / Sullivan, Kenneth (Committee member) / Kashiwagi, Jacob S (Committee member) / Arizona State University (Publisher)
Created2014