Aboveground nitrogen content showed a maximum in 2011, decreasing until 2015, increasing again until 2017, and dropping in 2018; belowground nitrogen content showed the opposite temporal trend. Because foliar nitrogen content was assumed to be relatively constant over time, my data suggested that belowground nitrogen content increased between 2011 and 2015 and decreased between 2015 and 2017. Aboveground nitrogen content underwent fluctuations due to fluctuations in aboveground biomass. This occurred due to ‘thatching’, or events of widespread toppling of large macrophyte stands. The ratio of aboveground to belowground biomass can vary widely in the same CTW. My findings suggested that managing senesced aboveground plant material in CTWs may optimize the CTW’s ability to sequester nitrogen. Further research is needed to determine the best management strategies, as well as its possible implications.
BIM use for process tool installation at a semiconductor manufacturing facility serves as an ideal environment for practical observations. Direct site observations indicate a positive correlation between disruptions in the workflow attributed to an immature use of BIM, waste due to rework and high non-value added time at the labor work face. Root-cause analysis traces the origins of the said disruptions to decision-factors that are critical for the planning, management and implementation of BIM. Analysis shows that stakeholders involved in decision-making during BIM planning, management and implementation identify BIM-value based on their immediate utility for BIM-use instead of the utility for the customers of the process. This differing value-system manifests in the form of unreliable and inaccurate information at the labor work face.
Grounding the analysis in theory and observations, the author hypothesizes that stakeholders of a construction project value BIM and BIM-aspects (i.e. geometrical information, descriptive information and workflows) differently and the accuracy of geometrical information is critical for improving labor productivity when using prefabrication in retrofit construction. In conclusion, this research presents a BIM-value framework, associating stakeholders with their relative value for BIM, the decision-factors for the planning, management and implementation of BIM and the potential impact of those decisions on labor productivity.
Recent developments in computational software and public accessibility of gridded climatological data have enabled researchers to study Urban Heat Island (UHI) effects more systematically and at a higher spatial resolution. Previous studies have analyzed UHI and identified significant contributors at the regional level for cities, within the topology of urban canyons, and for different construction materials.
In UHIs, air is heated by the convective energy transfer from land surface materials and anthropogenic activities. Convection is dependent upon the temperature of the surface, temperature of the air, wind speed, and relative humidity. At the same time, air temperature is also influenced by greenhouse gases (GHG) in the atmosphere. Climatologists project a 1-5°C increase in near-surface air temperature over the next several decades, and 1-4°C specifically for Los Angeles and Maricopa during summertime due to GHG effects. With higher ambient air temperatures, we seek to understand how convection will change in cities and to what ends.
In this paper we develop a spatially explicit methodology for quantifying UHI by estimating the daily convection thermal energy transfer from land to air using publicly-available gridded climatological data, and we estimate how much additional energy will be retained due to lack of convective cooling in scenarios of higher ambient air temperature.
This research study presents a life cycle assessment comparing the potential environmental impacts of two concrete construction methods used for building construction projects: Pre-cast and Cast-in-place concrete. The objective of the study was to provide a beneficial assessment of the potential environmental impacts by quantifying global warming potential, acidification and eutrophication associated with the two construction methods. Data for the two construction methods came from numerous industry reports and relatively recent journal article publications on the subject, although a majority of the data came from the Portland Cement Association’s Annual U.S. and Canadian Labor Energy Input Survey.