Matching Items (6)
153400-Thumbnail Image.png
Description
Economic and environmental concerns necessitate the preference for retrofits over new construction in manufacturing facilities for incorporating modern technology, expanding production, becoming more energy-efficient and improving operational efficiency. Despite the technical and functional challenges in retrofits, the expectation from the project team is to; reduce costs, ensure the time to

Economic and environmental concerns necessitate the preference for retrofits over new construction in manufacturing facilities for incorporating modern technology, expanding production, becoming more energy-efficient and improving operational efficiency. Despite the technical and functional challenges in retrofits, the expectation from the project team is to; reduce costs, ensure the time to market and maintain a high standard for quality and safety. Thus, the construction supply chain faces increasing pressure to improve performance by ensuring better labor productivity, among other factors, for efficiency gain. Building Information Modeling (BIM) & off-site prefabrication are determined as effective management & production methods to meet these goals. However, there are limited studies assessing their impact on labor productivity within the constraints of a retrofit environment. This study fills the gap by exploring the impact of BIM on labor productivity (metric) in retrofits (context).

BIM use for process tool installation at a semiconductor manufacturing facility serves as an ideal environment for practical observations. Direct site observations indicate a positive correlation between disruptions in the workflow attributed to an immature use of BIM, waste due to rework and high non-value added time at the labor work face. Root-cause analysis traces the origins of the said disruptions to decision-factors that are critical for the planning, management and implementation of BIM. Analysis shows that stakeholders involved in decision-making during BIM planning, management and implementation identify BIM-value based on their immediate utility for BIM-use instead of the utility for the customers of the process. This differing value-system manifests in the form of unreliable and inaccurate information at the labor work face.

Grounding the analysis in theory and observations, the author hypothesizes that stakeholders of a construction project value BIM and BIM-aspects (i.e. geometrical information, descriptive information and workflows) differently and the accuracy of geometrical information is critical for improving labor productivity when using prefabrication in retrofit construction. In conclusion, this research presents a BIM-value framework, associating stakeholders with their relative value for BIM, the decision-factors for the planning, management and implementation of BIM and the potential impact of those decisions on labor productivity.
ContributorsGhosh, Arundhati (Author) / Chasey, Allan D (Thesis advisor) / Laroche, Dominique-Claude (Committee member) / Fowler, John (Committee member) / Arizona State University (Publisher)
Created2015
156095-Thumbnail Image.png
Description
Informal public transport is commonplace in the developing world, but the service exists in the United States as well, and is understudied. Often called "dollar vans", New York's commuter vans serve approximately 120,000 people every day (King and Goldwyn, 2014). While this is a tiny fraction of the New York

Informal public transport is commonplace in the developing world, but the service exists in the United States as well, and is understudied. Often called "dollar vans", New York's commuter vans serve approximately 120,000 people every day (King and Goldwyn, 2014). While this is a tiny fraction of the New York transit rider population, it is comparable to the total number of commuters who ride transit in smaller cities such as Minneapolis/St Paul and Phoenix. The first part of this study reports on the use of commuter vans in Eastern Queens based on a combination of surveys and a ridership tally, all conducted in summer 2016. It answers four research questions: How many people ride the vans? Who rides the commuter vans? Why do they ride commuter vans? Do commuter vans complement or compete against formal transit? Commuter van ridership in Eastern Queens was approximately 55,000 with a high percentage of female ridership. Time and cost savings were the main factors influencing commuter van ridership. Possession of a MetroCard was shown to negatively affect the frequency of commuter van ridership. The results show evidence of commuter vans playing both a competing and complementary role to MTA bus and subway transit. The second part of this study presents a SWOT analysis results of commuter vans, and the policy implications. It answers 2 research questions: What are the main strengths, weaknesses, opportunities and threats of commuter vans in Eastern Queens? and How do the current policies, rules and regulations affect commuter van operation? The SWOT analysis results show that the commuter van industry is resilient, performs a necessary service, and, with small adjustments that will help reduce operating costs and loss of profits have a chance of thriving in Eastern Queens and the rest of New York City. The study also discusses the mismatch between policy and practice offering recommendations for improvement to ensure that commuter vans continue to serve residents of New York City.
ContributorsMusili, Catherine (Author) / Salon, Deborah (Thesis advisor) / King, David (Committee member) / Kelley, Jason (Committee member) / Arizona State University (Publisher)
Created2017
Description

This research study presents a life cycle assessment comparing the potential environmental impacts of two concrete construction methods used for building construction projects: Pre-cast and Cast-in-place concrete. The objective of the study was to provide a beneficial assessment of the potential environmental impacts by quantifying global warming potential, acidification and

This research study presents a life cycle assessment comparing the potential environmental impacts of two concrete construction methods used for building construction projects: Pre-cast and Cast-in-place concrete. The objective of the study was to provide a beneficial assessment of the potential environmental impacts by quantifying global warming potential, acidification and eutrophication associated with the two construction methods. Data for the two construction methods came from numerous industry reports and relatively recent journal article publications on the subject, although a majority of the data came from the Portland Cement Association’s Annual U.S. and Canadian Labor Energy Input Survey.

Created2014-06-13
141020-Thumbnail Image.png
Description

In the spring of 2016, The City of Apache Junction partnered with the School of Geographical Sciences and Urban Planning at Arizona State University on three forward-thinking plans for development in Apache Junction. Graduate students in the Urban and Environmental Planning program worked alongside City staff, elected officials and the

In the spring of 2016, The City of Apache Junction partnered with the School of Geographical Sciences and Urban Planning at Arizona State University on three forward-thinking plans for development in Apache Junction. Graduate students in the Urban and Environmental Planning program worked alongside City staff, elected officials and the public to identify opportunities and visions for:

1. Multi-modal access and connectivity improvements for City streets and open space.
2. Downtown development.
3. A master-planned community on state land south of the U.S. 60.

The following sections of the report present Apache Junction’s unique characteristics, current resident demographics, development needs and implementation strategies for each project:

1. Community Profile
2. Trail Connectivity Master Plan
3. Downtown Visioning
4. State Land Visioning

The Trail Connectivity Master Plan optimizes existing trails and wide road shoulders to improve multi-modal connections across the city. The proposed connections emphasize access to important recreation, education and other community facilities for pedestrians, equestrians and bicycles. Trail and lane designs recommend vegetated buffers, wherever possible, to improve traveler safety and comfort. The proposals also increase residents’ interaction with open space along urban-rural trails and park linkages to preserve opportunities to engage with nature. The objectives of the report are accomplished through three goals: connectivity, safety improvements and open space preservation.

Downtown Visioning builds on a large body of conceptual design work for Apache Junction’s downtown area along Idaho Road and Apache Trail. This report identifies three goals: to establish a town center, reestablish the grid systems while maintaining a view of the Superstition Mountains, and create an identity and sense of place for the downtown.

State Land Visioning addresses a tract of land, approximately 25 square miles in area, south of the U.S. 60. The main objective is to facilitate growth and proper development in accordance with existing goals in Apache Junction’s General Plan. This is accomplished through three goals:

1. Develop a foundation for the creation of an economic corridor along US-60 through preliminary market research and land use planning.
2. Create multi-modal connections between existing development north of US-60 and future recreational space northeast of US-60.
3. Maintain a large ratio of open space to developed area that encompasses existing washes and floodplains using a master planned community framework to provide an example for future land use planning.

ContributorsBarr, Jason (Author) / Bolen, Spencer (Author) / Chen, Dian (Author) / DuBois, Bailey (Author) / Godfrey, Kevin (Author) / Han, Siyuan (Author) / Hawkes, Trevor (Author) / Hu, Shixue (Carol) (Author) / Huang, Zeliu (Author) / Kay, Ryan (Author) / Kim, Joochul (Author) / Klaas, Morgan (Author) / Li, Pai (Author) / Meisenheimer, Joey (Author) / Murray, Kelly-Desirae (Author) / Quintans, Christiane (Author) / Shi, Yichuan (Author) / Smith, Bryan (Author) / Spriegel, Melissa (Author) / Wang, Xueyan (Author) / Wu, Junru (Author)
Created2016-05
Description

Global climate models predict increases in precipitation events in the Phoenix-metropolitan area and with the proposition of more flooding new insights are needed for protecting roadways and the services they provide. Students from engineering, sustainability, and planning worked together in ASU’s Urban Infrastructure Anatomy Spring 2016 course to assess:
   

Global climate models predict increases in precipitation events in the Phoenix-metropolitan area and with the proposition of more flooding new insights are needed for protecting roadways and the services they provide. Students from engineering, sustainability, and planning worked together in ASU’s Urban Infrastructure Anatomy Spring 2016 course to assess:
       1. How historical floods changed roadway designs.
       2. Precipitation forecasts to mid-century.
       3. The vulnerability of roadways to more frequent precipitation.
       4. Adaptation strategies focusing on safe-to-fail thinking.
       5. Strategies for overcoming institutional barriers to enable transitions.
The students designed an EPA Storm Water Management Model for the City of Phoenix and forced it with future precipitation forecasts. Vulnerability indexes were created for infrastructure performance and social outcomes. A multi-criteria decision analysis framework was created to prioritize infrastructure adaptation strategies.

Description

In the spring of 2016, the City of Apache Junction partnered with the School of Geographical Sciences and Urban Planning at Arizona State University on three forward-thinking plans for development in Apache Junction. Graduate students in the Urban and Environmental Planning program worked alongside City staff, elected officials and the

In the spring of 2016, the City of Apache Junction partnered with the School of Geographical Sciences and Urban Planning at Arizona State University on three forward-thinking plans for development in Apache Junction. Graduate students in the Urban and Environmental Planning program worked alongside City staff, elected officials and the public to identify opportunities and visions for:
       1. Multi-modal access and connectivity improvements for City streets and open space.
       2. Downtown development.
       3. A master-planned community on state land south of the U.S. 60.

The following sections of the report present Apache Junction’s unique characteristics, current resident demographics, development needs and implementation strategies for each project:
       1. Community Profile
       2. Trail Connectivity Master Plan
       3. Downtown Visioning
       4. State Land Visioning

The Trail Connectivity Master Plan optimizes existing trails and wide road shoulders to improve multi-modal connections across the city. The proposed connections emphasize access to important recreation, education and other community facilities for pedestrians, equestrians and bicycles. Trail and lane designs recommend vegetated buffers, wherever possible, to improve traveler safety and comfort. The proposals also increase residents’ interaction with open space along urban-rural trails and park linkages to preserve opportunities to engage with nature. The objectives of the report are accomplished through three goals: connectivity, safety improvements and open space preservation.

Downtown Visioning builds on a large body of conceptual design work for Apache Junction’s downtown area along Idaho Road and Apache Trail. This report identifies three goals: to establish a town center, to reestablish the grid systems while maintaining a view of the Superstition Mountains, and to create an identity and sense of place for the downtown.

State Land Visioning addresses a tract of land, approximately 25 square miles in area, south of the U.S. 60. The main objective is to facilitate growth and proper development in accordance with existing goals in Apache Junction’s General Plan. This is accomplished through three goals:
       1. Develop a foundation for the creation of an economic corridor along US-60 through
           preliminary market research and land use planning.
       2. Create multi-modal connections between existing development north of US-60 and
           future recreational space northeast of US-60.
       3. Maintain a large ratio of open space to developed area that encompasses existing
           washes and floodplains using a master planned community framework to provide an
           example for future land use planning.