Matching Items (6)
154610-Thumbnail Image.png
Description
Despite advancements in construction and construction-related technology, capital project performance deviations, typically overruns, remain endemic within the capital projects industry. Currently, management is generally unaware of the current status of their projects, and thus monitoring and control of projects are not achieved effectively. In an ever-increasing competitive industry

Despite advancements in construction and construction-related technology, capital project performance deviations, typically overruns, remain endemic within the capital projects industry. Currently, management is generally unaware of the current status of their projects, and thus monitoring and control of projects are not achieved effectively. In an ever-increasing competitive industry landscape, the need to deliver projects within technical, budgetary, and schedule requirements becomes imperative to sustain a healthy return on investment for the project stakeholders. The fact that information lags within the capital projects industry has motivated this research to find practices and solutions that facilitate Instantaneous Project Controls (IPC).

The author hypothesized that there are specific practices that, if properly implemented, can lead to instantaneous controls of capital projects. It is also hypothesized that instantaneous project controls pose benefits to project performance. This research aims to find practices and identify benefits and barriers to achieving a real-time mode of control. To achieve these objectives, several lines of inquiry had to be pursued. A panel of 13 industry professionals and three academics collaborated on this research project. Two surveys were completed to map the current state of project control practices and to identify state-of-the-art or ideal processes. Ten case studies were conducted within and outside of the capital projects industry to identify practices for achieving real-time project controls. Also, statistical analyses were completed on retrospective data for completed capital projects in order to quantify the benefits of IPC. In conclusion, this research presents a framework for implementing IPC across the capital projects industry. The ultimate output from this research is procedures and recommendations that improve project controls processes.
ContributorsAbbaszadegan, Amin (Author) / Grau Torrent, David (Thesis advisor) / El Asmar, Mounir (Committee member) / Gibson, Jr., G. Edward (Committee member) / Arizona State University (Publisher)
Created2016
127959-Thumbnail Image.png
Description

This article assesses the combined influence of information integration and automated data analytics on project performance. To this end, retrospective data on 78 completed projects, with a total installed value of $8 billion, was collected. The data collection effort characterized, for each project, the level of internal and external information

This article assesses the combined influence of information integration and automated data analytics on project performance. To this end, retrospective data on 78 completed projects, with a total installed value of $8 billion, was collected. The data collection effort characterized, for each project, the level of internal and external information integration. Information integration was assessed as the seamlessly interoperable sharing of data produced from a work function with other functions/stakeholders so that no manual data transfer was required. Also, the level of automated data analytics, understood as the full automation of the data analysis function after input data are entered, was also characterized on a project basis. Then, non-parametric statistical techniques were used to assess the impact of such functions on cost and schedule performance. The statistical analysis was also stratified by project type, e.g. greenfield and brownfield, additions, and modifications or shutdowns. Overall, projects with a sophisticated degree of information integration and automated data analytics can control their projects with more reliable information and in a proactive manner so that informed decisions can be timely made on behalf of the project and the organization.

ContributorsAbbaszadegan, Amin (Author) / Grau, David (Author) / Ira A. Fulton Schools of Engineering (Contributor)
Created2015-10-27
Description

As the number of heat waves are expected to increase significantly into the future in the U.S. Southwest, new insight is needed into how urban infrastructure can be repositioned to protect people. In the Phoenix metro area infrastructure have largely been deployed over the past half century, during a time

As the number of heat waves are expected to increase significantly into the future in the U.S. Southwest, new insight is needed into how urban infrastructure can be repositioned to protect people. In the Phoenix metro area infrastructure have largely been deployed over the past half century, during a time when climate change was not a concern. Now, as the county struggles to protect people from heat, there is a need to reassess how existing and new infrastructure can be positioned to reduce health impacts while improving sustainability. Using a neighborhood in Mesa, Arizona as a case study, we assess how changes to transportation infrastructure, building infrastructure, and landscaping can reduce heat exposure. A number of strategies are considered including the optimal deployment of heat refuges, deploying less convective surface materials, and deploying more thermally preferable building materials. The suite of strategies could be considered by cities throughout the Phoenix metro area.

Description

This research study presents a life cycle assessment comparing the potential environmental impacts of two concrete construction methods used for building construction projects: Pre-cast and Cast-in-place concrete. The objective of the study was to provide a beneficial assessment of the potential environmental impacts by quantifying global warming potential, acidification and

This research study presents a life cycle assessment comparing the potential environmental impacts of two concrete construction methods used for building construction projects: Pre-cast and Cast-in-place concrete. The objective of the study was to provide a beneficial assessment of the potential environmental impacts by quantifying global warming potential, acidification and eutrophication associated with the two construction methods. Data for the two construction methods came from numerous industry reports and relatively recent journal article publications on the subject, although a majority of the data came from the Portland Cement Association’s Annual U.S. and Canadian Labor Energy Input Survey.

Created2014-06-13
141020-Thumbnail Image.png
Description

In the spring of 2016, The City of Apache Junction partnered with the School of Geographical Sciences and Urban Planning at Arizona State University on three forward-thinking plans for development in Apache Junction. Graduate students in the Urban and Environmental Planning program worked alongside City staff, elected officials and the

In the spring of 2016, The City of Apache Junction partnered with the School of Geographical Sciences and Urban Planning at Arizona State University on three forward-thinking plans for development in Apache Junction. Graduate students in the Urban and Environmental Planning program worked alongside City staff, elected officials and the public to identify opportunities and visions for:

1. Multi-modal access and connectivity improvements for City streets and open space.
2. Downtown development.
3. A master-planned community on state land south of the U.S. 60.

The following sections of the report present Apache Junction’s unique characteristics, current resident demographics, development needs and implementation strategies for each project:

1. Community Profile
2. Trail Connectivity Master Plan
3. Downtown Visioning
4. State Land Visioning

The Trail Connectivity Master Plan optimizes existing trails and wide road shoulders to improve multi-modal connections across the city. The proposed connections emphasize access to important recreation, education and other community facilities for pedestrians, equestrians and bicycles. Trail and lane designs recommend vegetated buffers, wherever possible, to improve traveler safety and comfort. The proposals also increase residents’ interaction with open space along urban-rural trails and park linkages to preserve opportunities to engage with nature. The objectives of the report are accomplished through three goals: connectivity, safety improvements and open space preservation.

Downtown Visioning builds on a large body of conceptual design work for Apache Junction’s downtown area along Idaho Road and Apache Trail. This report identifies three goals: to establish a town center, reestablish the grid systems while maintaining a view of the Superstition Mountains, and create an identity and sense of place for the downtown.

State Land Visioning addresses a tract of land, approximately 25 square miles in area, south of the U.S. 60. The main objective is to facilitate growth and proper development in accordance with existing goals in Apache Junction’s General Plan. This is accomplished through three goals:

1. Develop a foundation for the creation of an economic corridor along US-60 through preliminary market research and land use planning.
2. Create multi-modal connections between existing development north of US-60 and future recreational space northeast of US-60.
3. Maintain a large ratio of open space to developed area that encompasses existing washes and floodplains using a master planned community framework to provide an example for future land use planning.

ContributorsBarr, Jason (Author) / Bolen, Spencer (Author) / Chen, Dian (Author) / DuBois, Bailey (Author) / Godfrey, Kevin (Author) / Han, Siyuan (Author) / Hawkes, Trevor (Author) / Hu, Shixue (Carol) (Author) / Huang, Zeliu (Author) / Kay, Ryan (Author) / Kim, Joochul (Author) / Klaas, Morgan (Author) / Li, Pai (Author) / Meisenheimer, Joey (Author) / Murray, Kelly-Desirae (Author) / Quintans, Christiane (Author) / Shi, Yichuan (Author) / Smith, Bryan (Author) / Spriegel, Melissa (Author) / Wang, Xueyan (Author) / Wu, Junru (Author)
Created2016-05
Description

In the spring of 2016, the City of Apache Junction partnered with the School of Geographical Sciences and Urban Planning at Arizona State University on three forward-thinking plans for development in Apache Junction. Graduate students in the Urban and Environmental Planning program worked alongside City staff, elected officials and the

In the spring of 2016, the City of Apache Junction partnered with the School of Geographical Sciences and Urban Planning at Arizona State University on three forward-thinking plans for development in Apache Junction. Graduate students in the Urban and Environmental Planning program worked alongside City staff, elected officials and the public to identify opportunities and visions for:
       1. Multi-modal access and connectivity improvements for City streets and open space.
       2. Downtown development.
       3. A master-planned community on state land south of the U.S. 60.

The following sections of the report present Apache Junction’s unique characteristics, current resident demographics, development needs and implementation strategies for each project:
       1. Community Profile
       2. Trail Connectivity Master Plan
       3. Downtown Visioning
       4. State Land Visioning

The Trail Connectivity Master Plan optimizes existing trails and wide road shoulders to improve multi-modal connections across the city. The proposed connections emphasize access to important recreation, education and other community facilities for pedestrians, equestrians and bicycles. Trail and lane designs recommend vegetated buffers, wherever possible, to improve traveler safety and comfort. The proposals also increase residents’ interaction with open space along urban-rural trails and park linkages to preserve opportunities to engage with nature. The objectives of the report are accomplished through three goals: connectivity, safety improvements and open space preservation.

Downtown Visioning builds on a large body of conceptual design work for Apache Junction’s downtown area along Idaho Road and Apache Trail. This report identifies three goals: to establish a town center, to reestablish the grid systems while maintaining a view of the Superstition Mountains, and to create an identity and sense of place for the downtown.

State Land Visioning addresses a tract of land, approximately 25 square miles in area, south of the U.S. 60. The main objective is to facilitate growth and proper development in accordance with existing goals in Apache Junction’s General Plan. This is accomplished through three goals:
       1. Develop a foundation for the creation of an economic corridor along US-60 through
           preliminary market research and land use planning.
       2. Create multi-modal connections between existing development north of US-60 and
           future recreational space northeast of US-60.
       3. Maintain a large ratio of open space to developed area that encompasses existing
           washes and floodplains using a master planned community framework to provide an
           example for future land use planning.