Matching Items (12)
Filtering by

Clear all filters

187723-Thumbnail Image.png
Description
Tools designed to help match people with behaviors they identify as likely to lead to a successful behavioral outcome remain under-researched. This study assessed the effect of a participant-driven behavior-matching intervention on 1) the adoption of a new behavior related to fruit and vegetable (F&V) consumption, 2) study attrition, and

Tools designed to help match people with behaviors they identify as likely to lead to a successful behavioral outcome remain under-researched. This study assessed the effect of a participant-driven behavior-matching intervention on 1) the adoption of a new behavior related to fruit and vegetable (F&V) consumption, 2) study attrition, and 3) changes in F&V consumption. In this two-arm randomized controlled trial, 64 adults who did not meet standard F&V recommendations were allocated to an intervention (n=33) or control group (n=31). Participants in the intervention group ranked 20 F&V-related behaviors according to their perceived likelihood of engagement in the behavior and their perception of the behavior’s efficacy in increasing F&V consumption. Participants in the intervention group were subsequently shown the list of 20 behaviors in order of their provided rankings, with the highest-ranked behaviors at the top, and were asked to choose a behavior they would like to perform daily for 4 weeks. The control group chose from a random-order list of the same 20 behaviors to adopt daily for 4 weeks. During the study period, text messages were sent to all participants 90 minutes before their reported bedtime to collect Yes/No data reflecting successful behavior engagement each day. The binary repeated-measures data collected from the text messages was analyzed using mixed-effects logistic regression, differences in attrition were assessed using log-rank analysis, and change scores in F&V consumption were compared between the two groups using the Man-Whitney U test. P<0.05 indicated significance. The rate of successful behavior adoption did not differ significantly between the two groups (b=0.09, 95%CI= -0.81, 0.98, p=0.85). The log rank test results indicated that there was no significant difference in attrition between the two groups (χ2=2.68, df=1, p=0.10). F&V consumption increased significantly over the 4 weeks in the total sample (Z=-5.86, p<0.001), but no differences in F&V change scores were identified between the control and intervention groups (Z=-0.21, p=0.84). The behavior-matching tool assessed in this study did not significantly improve behavior adoption, study attrition, or F&V intake over 4 weeks.
ContributorsCosgrove, Kelly Sarah (Author) / Wharton, Christopher (Thesis advisor) / Adams, Marc (Committee member) / DesRoches, Tyler (Committee member) / Grebitus, Carola (Committee member) / Johnston, Carol (Committee member) / Arizona State University (Publisher)
Created2023
157086-Thumbnail Image.png
Description
Background In the United States (US), first-year university students typically live on campus and purchase a meal plan. In general, meal plans allow the student a set number of meals per week or semester, or unlimited meals. Understanding how students’ use their meal plan, and barriers and facilitators to meal

Background In the United States (US), first-year university students typically live on campus and purchase a meal plan. In general, meal plans allow the student a set number of meals per week or semester, or unlimited meals. Understanding how students’ use their meal plan, and barriers and facilitators to meal plan use, may help decrease nutrition-related issues.

Methods First-year students’ meal plan and residence information was provided by a large, public, southwestern university for the 2015-2016 academic year. A subset of students (n=619) self-reported their food security status. Logistic generalized estimating equations (GEEs) were used to determine if meal plan purchase and use were associated with food insecurity. Linear GEEs were used to examine several potential reasons for lower meal plan use. Logistic and Linear GEEs were used to determine similarities in meal plan purchase and use for a total of 599 roommate pairs (n=1186 students), and 557 floormates.

Results Students did not use all of the meals available to them; 7% of students did not use their meal plan for an entire month. After controlling for socioeconomic factors, compared to students on unlimited meal plans, students on the cheapest meal plan were more likely to report food insecurity (OR=2.2, 95% CI=1.2, 4.1). In Fall, 26% of students on unlimited meal plans reported food insecurity. Students on the 180 meals/semester meal plan who used fewer meals were more likely to report food insecurity (OR=0.9, 95% CI=0.8, 1.0); after gender stratification this was only evident for males. Students’ meal plan use was lower if the student worked a job (β=-1.3, 95% CI=-2.3, -0.3) and higher when their roommate used their meal plan frequently (β=0.09, 99% CI=0.04, 0.14). Roommates on the same meal plan (OR=1.56, 99% CI=1.28, 1.89) were more likely to use their meals together.

Discussion This study suggests that determining why students are not using their meal plan may be key to minimizing the prevalence of food insecurity on college campuses, and that strategic roommate assignments may result in students’ using their meal plan more frequently. Students’ meal plan information provides objective insights into students’ university transition.
Contributorsvan Woerden, Irene (Author) / Bruening, Meg (Thesis advisor) / Hruschka, Daniel (Committee member) / Schaefer, David (Committee member) / Vega-Lopez, Sonia (Committee member) / Adams, Marc (Committee member) / Arizona State University (Publisher)
Created2019
154321-Thumbnail Image.png
Description
A roofing manufacturer wants to differentiate themselves from other roofing manufacturers based on performance information. However, construction industry has revealed poor performance documentation in the last couple of decades. With no current developed performance measurement model in the industry, two roofing manufacturers approached the research group to implement a warranty

A roofing manufacturer wants to differentiate themselves from other roofing manufacturers based on performance information. However, construction industry has revealed poor performance documentation in the last couple of decades. With no current developed performance measurement model in the industry, two roofing manufacturers approached the research group to implement a warranty program that measures the performance information of their systems and applicators. Moreover, the success of any project in the construction industry heavily relies upon the capability of the contractor(s) executing the project. Low-performing contractors are correlated with increased cost and delayed schedules, resulting in end-user dissatisfaction with the final product. Hence, the identification and differentiation of the high performing contractors from their competitors is also crucial. The purpose of this study is to identify and describe a new model for measuring manufacturer performance and differentiating contractor performance and capability for two roofing manufacturers (Manufacturer 1 and Manufacturer 2) in the roofing industry. The research uses multiple years of project data and customer satisfaction data collected for two roofing manufacturers for over 1,000 roofing contractors. The performance and end-user satisfaction was obtained for over 7,000 manufacturers' projects and each contractor associated with that project for cost, schedule, and quality metrics. The measurement process was successfully able to provide a performance measurement for the manufacturer based on the customer satisfaction and able to identify low performing contractors. This study presents the research method, the developed measurement model, and proposes a new performance measurement process that entities in the construction industry can use to measure performance.
ContributorsGajjar, Dhaval (Author) / Kashiwagi, Dean (Thesis advisor) / Sullivan, Kenneth (Thesis advisor) / Kashiwagi, Jacob (Committee member) / Arizona State University (Publisher)
Created2016
152496-Thumbnail Image.png
Description
Background: Childhood obesity is one of the most serious public health concerns in the United States and has been associated with low levels of physical activity. Schools are ideal physical activity promotion sites but school physical activity opportunities have decreased due the increased focus on academic performance. Before-school programs provide

Background: Childhood obesity is one of the most serious public health concerns in the United States and has been associated with low levels of physical activity. Schools are ideal physical activity promotion sites but school physical activity opportunities have decreased due the increased focus on academic performance. Before-school programs provide a good opportunity for children to engage in physical activity as well as improve their readiness to learn. Purpose: The purpose of this study was to examine the effect of a before-school running/walking club on children's physical activity and on-task behavior. Methods: Participants were third and fourth grade children from two schools in the Southwestern United States who participated in a before-school running/walking club that met two times each week. The study employed a two-phase experimental design with an initial baseline phase and an alternating treatments phase. Physical activity was monitored using pedometers and on-task behavior was assessed through systematic observation. Data analysis included visual analysis, descriptive statistics, as well as multilevel modeling. Results: Children accumulated substantial amounts of physical activity within the before-school program (School A: 1731 steps, 10:02 MVPA minutes; School B: 1502 steps, 8:30 MVPA minutes) and, on average, did not compensate by decreasing their physical activity during the rest of the school day. Further, on-task behavior was significantly higher on days the children attended the before-school program than on days they did not (School A=15.78%, pseudo-R2=.34 [strong effect]; School B=14.26%, pseudo-R2=.22 [moderate effect]). Discussion: Results provide evidence for the positive impact of before-school programs on children's physical activity and on-task behavior. Such programs do not take time away from academics and may be an attractive option for schools.
ContributorsStylianou, Michalis (Author) / Kulinna, Pamela H. (Thesis advisor) / Van Der Mars, Hans (Committee member) / Amazeen, Eric (Committee member) / Adams, Marc (Committee member) / Mahar, Matthew T. (Committee member) / Arizona State University (Publisher)
Created2014
152558-Thumbnail Image.png
Description
Sustaining a fall can be hazardous for those with low bone mass. Interventions exist to reduce fall-risk, but may not retain long-term interest. "Exergaming" has become popular in older adults as a therapy, but no research has been done on its preventative ability in non-clinical populations. The purpose was to

Sustaining a fall can be hazardous for those with low bone mass. Interventions exist to reduce fall-risk, but may not retain long-term interest. "Exergaming" has become popular in older adults as a therapy, but no research has been done on its preventative ability in non-clinical populations. The purpose was to determine the impact of 12-weeks of interactive play with the Wii Fit® on balance, muscular fitness, and bone health in peri- menopausal women. METHODS: 24 peri-menopausal-women were randomized into study groups. Balance was assessed using the Berg/FICSIT-4 and a force plate. Muscular strength was measured using the isokinetic dynamometer at 60°/180°/240°/sec and endurance was assessed using 50 repetitions at 240°/sec. Bone health was tracked using dual-energy x-ray absorptiometry (DXA) for the hip/lumbar spine and qualitative ultrasound (QUS) of the heel. Serum osteocalcin was assessed by enzyme immunoassay. Physical activity was quantified using the Women's Health Initiative Physical Activity Questionnaire and dietary patterns were measured using the Nurses' Health Food Frequency Questionnaire. All measures were repeated at weeks 6 and 12, except for the DXA, which was completed pre-post. RESULTS: There were no significant differences in diet and PA between groups. Wii Fit® training did not improve scores on the Berg/FICSIT-4, but improved center of pressure on the force plate for Tandem Step, Eyes Closed (p-values: 0.001-0.051). There were no significant improvements for muscular fitness at any of the angular velocities. DXA BMD of the left femoral neck improved in the intervention group (+1.15%) and decreased in the control (-1.13%), but no other sites had significant changes. Osteocalcin indicated no differences in bone turnover between groups at baseline, but the intervention group showed increased bone turnover between weeks 6 and 12. CONCLUSIONS: Findings indicate that WiiFit® training may improve balance by preserving center of pressure. QUS, DXA and osteocalcin data confirm that those in the intervention group were experiencing more bone turnover and bone formation than the control group. In summary, twelve weeks of strength /balance training with the Wii Fit® shows promise as a preventative intervention to reduce fall and fracture risk in non-clinical middle aged women who are at risk.
ContributorsWherry, Sarah Jo (Author) / Swan, Pamela D (Thesis advisor) / Adams, Marc (Committee member) / Der Ananian, Cheryl (Committee member) / Sweazea, Karen (Committee member) / Vaughan, Linda (Committee member) / Arizona State University (Publisher)
Created2014
155168-Thumbnail Image.png
Description
Saudi Arabia has been facing issues with completing construction projects on time and on budget. It has been documented that 70% of public construction projects are delayed. Studies have identified the low-bid delivery method as an important factor in causing such delays. The procurement system (low-bid) ignores contractors’ performance, and

Saudi Arabia has been facing issues with completing construction projects on time and on budget. It has been documented that 70% of public construction projects are delayed. Studies have identified the low-bid delivery method as an important factor in causing such delays. The procurement system (low-bid) ignores contractors’ performance, and that is reflected in projects’ performance. A case study was performed, at a University campus in northern Saudi Arabia, identifying the major causes of project delays and cost overruns. The University was experiencing delays from 50% to 150%. Also, the actual project costs for four projects were examined and found that all four projects’ costs were higher than the original bid. The delay and cost overruns factors were gathered from the University engineers. A literature research identified one construction management method, best value performance information procurement system (BV PIPS), has documented multiple times its ability to improve project performance. In a comparison using the result of a case study and the results of (BV PIPS), Saudi Arabia’s delivery system was identified as a potential cause of project performance issues. The current procurement system was analyzed and modified to adapt with the (BV PIPS). The proposed procurement system using BV PIPS, which can be implemented in Saudi Arabia, was created with owner side. A large survey was conducted of 761 classified contractors and 43 universities’ representatives who rated causes of delay factors and cost overruns. The delay factors were then compared to delay factors experienced on Saudi construction projects, identified by performing a literature research. The comparison identified 14 important causes of delays. Moreover, the survey showed that classified contractors and universities’ representatives unsatisfied with low-bid, and they agreed with BV PIPS which selecting vendors based on performance with price. The proposed model required a submitted level of experience (LE), risk assessment (RA), and value added (VA). Besides, project managers of vendors should be interviewed during the clarification phase. In addition, venders should submit the project’s scope, technical schedule, milestone schedule, and risk management plan. In the execution phase, vendors should submit a weekly risk report (WRR) and director’s report (DR).
ContributorsAlzara, Majed (Author) / Kashiwagi, Dean (Thesis advisor) / Kashiwagi, Jacob (Committee member) / Al-Tassan, Abdulrahman (Committee member) / Arizona State University (Publisher)
Created2016
156379-Thumbnail Image.png
Description
Recent studies have identified that contractors in the Saudi construction industry are not the main party that cause risks as owners and other parties have the major share of causing risks. However, with the identification that risks out of contractors’ control are a leading cause of low performance, there is

Recent studies have identified that contractors in the Saudi construction industry are not the main party that cause risks as owners and other parties have the major share of causing risks. However, with the identification that risks out of contractors’ control are a leading cause of low performance, there is a lack of efficient risk mitigation practices in Saudi to manage these risks. The main aim of this dissertation is to assess the current practices applied by contractors to minimize risk out of their control and develop a risk mitigation model to manage these risks. The main objectives of the study are: investigating the risks that are out of contractors’ control, assessing the contractors’ current risk mitigation and performance measurement practices, and finally developing and validating a risk mitigation model to minimize risks out of contractors’ control and measure performance of involved project parties. To achieve the study aim, a mixed methodological approach was adopted. Theoretical approaches were utilized to review previous research and to develop a conceptual risk mitigation framework followed by a practical approach that is considered with collecting data from contractors. The quantitative method was mainly used to meet the study objectives through distributing a survey in the form of a questionnaire. As a consolidation of the study findings, the top ranked risks that are out of contractors’ control were identified. Furthermore, the results identified that the contractors’ current risk management and performance measurement practices are not effective in minimizing projects risks caused by other parties and ineffective in measuring performance of all parties. The developed model focuses on increasing accountability of project parties through mitigating project parties’ activities and risks with measuring the deviations and identifying sources of deviations. Transparency is utilized in the model through sharing weekly updates of the activities and risks combined with updated information of performance measurements of all project parties. The study results showed that project risks can be minimized and projects’ performance can be increased if contractors shift their focus using the developed model from only managing their own activities and risks to managing all project parties’ activities and risks.
ContributorsAlgahtany, Mohammed (Author) / Sullivan, Kenneth (Thesis advisor) / Kashiwagi, Dean (Committee member) / Badger, William (Committee member) / Arizona State University (Publisher)
Created2018
155709-Thumbnail Image.png
Description
ABSTRACT

The current Saudi Arabian (SA) procurement system leads to many losses in money and benefits in projects. Also, the use of the traditional procurement system in SA has been identified as one of the causes for poor performance in the delivery of construction and the major risk to the SA

ABSTRACT

The current Saudi Arabian (SA) procurement system leads to many losses in money and benefits in projects. Also, the use of the traditional procurement system in SA has been identified as one of the causes for poor performance in the delivery of construction and the major risk to the SA government. A questionnaire has been developed and carefully designed based on literature review. The purpose of the survey was to identify the validity of the recent claims that the procurement system in SA is broken and to improve the current SA procurement system. The questionnaire was sent out to 1,396 participants including included 867 engineers, 256 consultants, 93 contractors, 35 owners and 132 architects and 13 academics.

All participants have been registered and licensed professionals at the SA Council for professional engineers, who work in both private and public sectors. The participants are interested in the SA procurement and contracts system with experience ranging from one to more than twenty-five years with the majority of twenty-five years of experience in common construction sectors such as; residential and commercial buildings, healthcare buildings, industrial building and heavy civil construction.

Most of the participants from both private and public sectors agreed with the survey questions subject matter regarding: zone price proposals, contractors' evaluation, risks, planning, projects' scope, owners concern and weekly risks reports (WRR). The survey results showed that the procurement system is the major risk to projects, affects construction projects negatively and is in need of improvement.

Based on the survey and literature review, a model, called Saudi government performance procurement model (SGPPM), has been developed in which the most expert contractor is chosen through four phases: submittals& education, vendors selection, illustration and execution. The resulting model is easy to implement by SA government and does not require special skills or backgrounds.
ContributorsAlofi, Ahmed Abdulrahman (Author) / Kashiwagi, Dean (Thesis advisor) / Sullivan, Kenneth (Committee member) / Kashiwagi, Jacob (Committee member) / Arizona State University (Publisher)
Created2017
155786-Thumbnail Image.png
Description
Public construction projects in Saudi Arabia have been experiencing performance issues for the past 30 years. There have been many research efforts and publications identifying the problem and potential causes, however, there have been minimal efforts identifying how to mitigate the problem and testing to validate proposed solutions. A literature

Public construction projects in Saudi Arabia have been experiencing performance issues for the past 30 years. There have been many research efforts and publications identifying the problem and potential causes, however, there have been minimal efforts identifying how to mitigate the problem and testing to validate proposed solutions. A literature search has shown that the academic research has had minimal impact in assisting the construction industry to improve its performance. This dissertation aimed to evaluate the impact of construction management research in Saudi construction industry (SCI), and to investigate barriers that hinder the diffusion of implementing the research outcomes in the construction sector in order to develop a research roadmap to bridge the gap between academic research and practice, using the experience of other organizations that have a successful experience in developing the impact of construction management research in the construction industry. In order to achieve the aim of the study, five main objectives were set up which are: evaluate the impact of construction management research in SCI, identify the barriers that affect the implementation of construction management research in SCI, develop a research roadmap to bridge the gap between the research and practice, validating the proposed solution, and proposed implementation plan and review the result from the implementation. A literature research was performed, using 5 academic databases, identifying the impact that R&D has had on the SCI. A questionnaire was also created surveying both researchers and industry professionals. The results show evidence that the current R&D process in Saudi Arabia is not helping the SCI to increase their performance, and needs to be improved. This study provides a potential solution, and an action plan that mirrors one of the most successful research and development programs in the construction industry in the world [+1915 tests, six different countries, 31 states in the U.S. and 98% customer satisfaction]. The solution proposed in this dissertation is unique to the strengths and weaknesses of the research and development programs at universities and research centers in Saudi Arabia. This study is the first study of its kind in Saudi Arabia.
ContributorsAlhammadi, Yasir (Author) / Kashiwagi, Dean (Thesis advisor) / Badger, William (Committee member) / Sullivan, Kenneth (Committee member) / Arizona State University (Publisher)
Created2017
155735-Thumbnail Image.png
Description
Research has shown that construction projects in Saudi Arabia have had a perceived poor performance for the past three decades, from 1970-2016. The Saudi construction industry relies on a Contractor Classification System (CCS) to determine contractors’ capabilities, and prevent underperformance. Through this study, a survey was conducted among

Research has shown that construction projects in Saudi Arabia have had a perceived poor performance for the past three decades, from 1970-2016. The Saudi construction industry relies on a Contractor Classification System (CCS) to determine contractors’ capabilities, and prevent underperformance. Through this study, a survey was conducted among persons involved in the Saudi Arabian construction industry to identify the perception of the performance of the Saudi Arabian construction industry, and the satisfaction with the CCS. The results of the survey showed that 71.59% of the participants agreed that the CCS does not accurately assess contractors’ capabilities for projects they are allowed to work on. A critical review of the CCS is presented through a case study and comparisons are made from worldwide CCSs found in a literature review. All the parts of the Kingdom of Saudi Arabia’s CCS, including the work flow and the evaluation criteria were reviewed. Several observations of the CCS include a lack of transparency in the process, no performance feedback, complexity of the system, the system being outdated in relation to the worldwide systems, and no continuous performance measurements. To develop an appropriate continuous performance measurement model and benchmarking, other worldwide performance measurement models and benchmarking models were reviewed and discussed. Through these findings, a modified version of the current CCS was developed. A test was performed on the financial assessment portion of the developed model using 5,751 contractors who were classified at the time of this study. The results showed that only 14% of the 5,751 contractors are financially capable in their respective CCS grades. The proposed new CCS model which is outlined in this study includes two major modifications. The first modification is on existing components, which will improve the transparency, simplicity, and speed of the CCS process. The second modification is the addition of a new component, which will continually track contractor performance over time and motivate contractors to improve their performance.
ContributorsAlmutairi, Saud (Author) / Kashiwagi, Dean (Thesis advisor) / Kashiwagi, Jacob (Committee member) / Sullivan, Kenneth (Committee member) / Arizona State University (Publisher)
Created2017