The construction industry has accepted the uncertainty that is included with every project that is initiated. Because of the existing uncertainty, best practices with risk management are commonly recommended and educated to industry participants. However, the current status of the construction industry's ability to manage risk was found to be

The construction industry has accepted the uncertainty that is included with every project that is initiated. Because of the existing uncertainty, best practices with risk management are commonly recommended and educated to industry participants. However, the current status of the construction industry's ability to manage risk was found to be limited, unstructured, and inadequate. Furthermore, many barriers block organizations from implementing and improving risk management practices. A significant barrier with improving risk management methods is the lack of evidence that clearly demonstrates the need to improve risk management practices. Logical explanations of the benefits of risk management doesn't provide the necessary justification or motivation needed for many organizations to dedicate resources towards improving risk management.

Nevertheless, some organizations understand the importance of risk management practices and have begun to measure their risk maturity in order to identify weaknesses and improve risk management practices. Risk maturity measures the organization's ability and perceptions towards risk management. It is possible that many of the barriers to improving risk management would not exist if increased risk maturity was found to have a positive correlation with successful project performance.

The comprehensive hypothesis of the research is that increased risk maturity improves project performance. An exploratory study was conducted on data collected to identify measurable benefits with risk management. Quantitative and qualitative data was collected on 266 construction projects over a seven year period. Multiple statistical analyses were performed on the data and found a positive correlations between risk maturity and project performance. A positive correlations was found between customer satisfaction and contractors risk maturity. Additional findings from the recorded data included the increased ability to predict risks during construction projects within an organization. These findings provide clear reasoning for organizations to devote additional resources in which improve their risk management practices.
ContributorsPerrenoud, Anthony (Author) / Sullivan, Kenneth T. (Thesis advisor) / Weizel, Avi (Committee member) / Badger, William (Committee member) / Arizona State University (Publisher)
Created2014
152888-Thumbnail Image.png
Description
Owner organizations in the architecture, engineering, and construction (AEC) industry are presented with a wide variety of project delivery approaches. Implementation of these approaches, while enticing due to their potential to save money, reduce schedule delays, or improve quality, is extremely difficult to accomplish and requires a concerted change management

Owner organizations in the architecture, engineering, and construction (AEC) industry are presented with a wide variety of project delivery approaches. Implementation of these approaches, while enticing due to their potential to save money, reduce schedule delays, or improve quality, is extremely difficult to accomplish and requires a concerted change management effort. Research in the field of organizational behavior cautions that perhaps more than half of all organizational change efforts fail to accomplish their intended objectives. This study utilizes an action research approach to analyze change message delivery within owner organizations, model owner project team readiness and adoption of change, and identify the most frequently encountered types of resistance from lead project members. The analysis methodology included Spearman's rank order correlation, variable selection testing via three methods of hierarchical linear regression, relative weight analysis, and one-way ANOVA. Key findings from this study include recommendations for communicating the change message within owner organizations, empirical validation of critical predictors for change readiness and change adoption among project teams, and identification of the most frequently encountered resistive behaviors within change implementation in the AEC industry. A key contribution of this research is the recommendation of change management strategies for use by change practitioners.
ContributorsLines, Brian (Author) / Sullivan, Kenneth (Thesis advisor) / Wiezel, Avi (Committee member) / Badger, William (Committee member) / Arizona State University (Publisher)
Created2014
150085-Thumbnail Image.png
Description
The wood-framing trade has not sufficiently been investigated to understand the work task sequencing and coordination among crew members. A new mental framework for a performing crew was developed and tested through four case studies. This framework ensured similar team performance as the one provided by task micro-scheduling in planning

The wood-framing trade has not sufficiently been investigated to understand the work task sequencing and coordination among crew members. A new mental framework for a performing crew was developed and tested through four case studies. This framework ensured similar team performance as the one provided by task micro-scheduling in planning software. It also allowed evaluation of the effect of individual coordination within the crew on the crew's productivity. Using design information, a list of micro-activities/tasks and their predecessors was automatically generated for each piece of lumber in the four wood frames. The task precedence was generated by applying elementary geometrical and technological reasoning to each frame. Then, the duration of each task was determined based on observations from videotaped activities. Primavera's (P6) resource leveling rules were used to calculate the sequencing of tasks and the minimum duration of the whole activity for various crew sizes. The results showed quick convergence towards the minimum production time and allowed to use information from Building Information Models (BIM) to automatically establish the optimal crew sizes for frames. Late Start (LS) leveling priority rule gave the shortest duration in every case. However, the logic of LS tasks rule is too complex to be conveyed to the framing crew. Therefore, the new mental framework of a well performing framer was developed and tested to ensure high coordination. This mental framework, based on five simple rules, can be easily taught to the crew and ensures a crew productivity congruent with the one provided by the LS logic. The case studies indicate that once the worst framer in the crew surpasses the limit of 11% deviation from applying the said five rules, every additional percent of deviation reduces the productivity of the whole crew by about 4%.
ContributorsMaghiar, Marcel M (Author) / Wiezel, Avi (Thesis advisor) / Mitropoulos, Panagiotis (Committee member) / Cooke, Nancy J. (Committee member) / Arizona State University (Publisher)
Created2011
150955-Thumbnail Image.png
Description
Front end planning (FEP) is an essential and valuable process that helps identify risks early in the capital project planning phases. With effective FEP, risks can potentially be mitigated through development of detailed scope definition and subsequent efficient project resource use. The thesis describes the FEP process that has been

Front end planning (FEP) is an essential and valuable process that helps identify risks early in the capital project planning phases. With effective FEP, risks can potentially be mitigated through development of detailed scope definition and subsequent efficient project resource use. The thesis describes the FEP process that has been developed over the past twenty years by the Construction Industry Institute (CII). Specifically, it details the FEP tools developed for early project planning and the data gathered to analyze the tools used within the CII community. Data from a March 2011 survey are given showing the tools commonly used, how those tools are used and the common barriers faced that prohibit successful FEP implementation. The findings from in-depth interviews are also shared in the thesis. The interviews were used to gather detail responses from organizations on the implementation of their FEP processes. In total, out of the 116 CII organizations, 59 completed the survey and over 75 percent of the respondents used at least one CII tool in their front end planning processes. Of the 59 survey respondents, 12 organizations participated in the in-depth interviews. The thesis concludes that CII organizations continue to find value in CII FEP tools due to the increase tool usage. Also the thesis concludes that organizations must have strong management commitment, smart succession planning and a standardized planning process to increase the likelihood of successful FEP strategies.
ContributorsBosfield, Roberta Patrice (Author) / Gibson, G.Edward (Thesis advisor) / Wiezel, Avi (Committee member) / Ernzen, James (Committee member) / Arizona State University (Publisher)
Created2012
151243-Thumbnail Image.png
Description
The construction industry faces important performance problems such as low productivity, poor quality of work, and work-related accidents and injuries. Creating a high reliability work system that is simultaneously highly productive and exceptionally safe has become a challenge for construction practitioners and scholars. The main goal of this dissertation was

The construction industry faces important performance problems such as low productivity, poor quality of work, and work-related accidents and injuries. Creating a high reliability work system that is simultaneously highly productive and exceptionally safe has become a challenge for construction practitioners and scholars. The main goal of this dissertation was to create an understanding of high reliability construction work systems based on lessons from the production practices of high performance work crews. High performance work crews are defined as the work crews that constantly reach and maintain a high level of productivity and exceptional safety record while delivering high quality of work. This study was conceptualized on findings from High Reliability Organizations and with a primary focus on lean construction, human factors, safety, and error management. Toward the research objective, this dissertation answered two major questions. First, it explored the task factors and project attributes that shape and increase workers' task demands and consequently affect workers' safety, production, and quality performance. Second, it explored and investigated the production practices of construction field supervisors (foremen) to understand how successful supervisors regulate task and project demands to create a highly reliable work process. Employing case study methodology, this study explored and analyzed the work practices of six work crews and crew supervisors in different trades including concrete, masonry, and hot asphalt roofing construction. The case studies included one exceptional and one average performing crew from each trade. Four major factors were considered in the selection of exceptional crew supervisors: (1) safety performance, (2) production performance, (3) quality performance, and (4) the level of project difficulty they supervised. The data collection was carried out in three phases including: (1) interview with field supervisors to understand their production practices, (2) survey and interview with workers to understand their perception and to identify the major sources of task demands, and (3) several close field observations. Each trade's specific findings including task demands, project attributes, and production practices used by crew supervisors are presented in a separate chapter. At the end the production practices that converged to create high reliability work systems are summarized and presented in nine major categories.
ContributorsMemarian, Babak (Author) / Bashford, Howard (Thesis advisor) / Boren, Rebecca (Committee member) / Wiezel, Avi (Committee member) / Arizona State University (Publisher)
Created2012
154179-Thumbnail Image.png
Description
In today's era a lot of the construction projects suffer from time delay, cost overrun and quality defect. Incentive provisions are found to be a contracting strategy to address this potential problem. During last decade incentive mechanisms have gained importance, and they are starting to become adopted in the construction

In today's era a lot of the construction projects suffer from time delay, cost overrun and quality defect. Incentive provisions are found to be a contracting strategy to address this potential problem. During last decade incentive mechanisms have gained importance, and they are starting to become adopted in the construction projects. Most of the previous research done in this area was purely qualitative, with a few quantitative studies. This study aims to quantify the performance of incentives in construction by collecting the data from more than 30 projects in United States through a questionnaire survey. First, literature review addresses the previous research work related to incentive types, incentives in construction industry, incentives in other industry and benefits of incentives. Second, the collected data is analyzed with statistical methods to test the significance of observed changes between two data sets i.e. incentive projects and non-incentive projects. Finally, the analysis results provide evidence for the significant impact of having incentives; reduced the cost and schedule growth in construction projects in United States.
ContributorsPaladugu, Bala Sai Krishna (Author) / El Asmar, Mounir (Thesis advisor) / Ernzen, James (Committee member) / Sullivan, Kenneth (Committee member) / Arizona State University (Publisher)
Created2015
156035-Thumbnail Image.png
Description
The construction industry is performing poorly regarding project management and service delivery. On average, global projects are over-budget, delayed, and met with unsatisfactory results according to buyers. To mitigate poor performance, the project management career path has been heavily researched and continually developed over the last century. Despite the published

The construction industry is performing poorly regarding project management and service delivery. On average, global projects are over-budget, delayed, and met with unsatisfactory results according to buyers. To mitigate poor performance, the project management career path has been heavily researched and continually developed over the last century. Despite the published advances in project management approaches and tools, project performance continues to suffer. This research seeks to conduct an exploratory analysis of current project management and other approaches and determine how they affect project performance. Through a detailed literature search, the researcher identified a procurement model that is more heavily documented as high performing than all other approaches. The researcher proposed that this model may be a solution to assist project managers with the delivery of high performing services. The model is called the Best Value Approach (BVA). The BVA focuses on leadership, non-technical communication, quality assurance, and transparent project execution. To test the effectiveness of its practices, the researcher modified and adapted the BVA into a project management approach and tested it on a large-scale government project. During the case study test, the researcher observed that there were two primary project management roles in the supply chain; the buyer’s and vendor’s project managers. The case study resulted in the large government organization receiving more work and increased their satisfaction of the work received by 22 percent from the previous year. To further test the project management adapted BVA, the researcher conducted a classroom case-study in which students learned and implemented the BVA practices on real-time, small-scale industry projects. Results include cost savings of $100,000 for 10 companies over 24 projects, cost avoidance of over $4.5M, and a 9.8/10 customer satisfaction [in terms of the companies’ satisfaction with the deliverables produced on each project]. These results suggest that the BVA practices may effectively improve the performance of project delivery, and may be a viable new project management approach to train future project managers. Out of the two project manager roles, it is proposed that the buyer’s project manager may receive the most benefit. Additional research is needed on the other approaches to compare quantitative project performance, and run repeated testing on the potential new project management approach.
ContributorsRivera, Alfredo Octavio (Author) / Badger, William (Thesis advisor) / Sullivan, Kenneth (Thesis advisor) / Kashiwagi, Jacob S (Committee member) / Arizona State University (Publisher)
Created2017
149457-Thumbnail Image.png
Description
Front End Planning (FEP) is a critical process for uncovering project unknowns, while developing adequate scope definition following a structured approach for the project execution process. FEP for infrastructure projects assists in identifying and mitigating issues such as right-of-way concerns, utility adjustments, environmental hazards, logistic problems, and permitting requirements. This

Front End Planning (FEP) is a critical process for uncovering project unknowns, while developing adequate scope definition following a structured approach for the project execution process. FEP for infrastructure projects assists in identifying and mitigating issues such as right-of-way concerns, utility adjustments, environmental hazards, logistic problems, and permitting requirements. This thesis describes a novel and effective risk management tool that has been developed by the Construction Industry Institute (CII) called the Project Definition Rating Index (PDRI) for infrastructure projects. Input from industry professionals from over 30 companies was used in the tool development which is specifically focused on FEP. Data from actual projects are given showing the efficacy of the tool. Critical success factors for FEP of infrastructure projects are shared. The research shows that a finite and specific list of issues related to scope definition of infrastructure projects can be developed. The thesis also concludes that the PDRI score indicates the current level of scope definition and corresponds to project performance. Infrastructure projects with low PDRI scores outperform projects with high PDRI scores.
ContributorsBingham, Evan Dale (Author) / Gibson Jr., G. Edward (Thesis advisor) / Badger, William (Committee member) / Ariaratnam, Samuel (Committee member) / Arizona State University (Publisher)
Created2010
149322-Thumbnail Image.png
Description
The U.S. Army Medical Command has been testing a leadership based structure to increase the performance of delivering construction and facility services in its system of $600M of construction and 26 major hospital facilities in the U.S. The organizational requirement was to minimize the management and oversight of contractors

The U.S. Army Medical Command has been testing a leadership based structure to increase the performance of delivering construction and facility services in its system of $600M of construction and 26 major hospital facilities in the U.S. The organizational requirement was to minimize the management and oversight of contractors and simultaneously increase project performance. The research proposes that a leadership based structure can supplement the perception, preplanning, and risk minimization capability of a contractor's project manager, thus increasing the project performance (on time, within budget, and meeting expectations) and decreasing client management requirement. The projects were delivered in a best value and low price environment. The major impact of this research was that proactive management by contractors was more effective than traditional management such as direction, control, and inspection by client's professional representatives. The results based on data collection and date analyses validated that a leadership based structure can increase the performance of an organization and reduce its management requirement.
ContributorsMalhotra, Neha (Author) / Kashiwagi, Dean T. (Thesis advisor) / Sullivan, Kenneth (Committee member) / Badger, William (Committee member) / Arizona State University (Publisher)
Created2010
153973-Thumbnail Image.png
Description
The workforce demographics are changing as a large portion of the population is approaching retirement and thus leaving vacancies in the construction industry. Succession planning is an aspect of talent management which aims to mitigate instability faced by a company when a new successor fills a vacancy. Research shows that

The workforce demographics are changing as a large portion of the population is approaching retirement and thus leaving vacancies in the construction industry. Succession planning is an aspect of talent management which aims to mitigate instability faced by a company when a new successor fills a vacancy. Research shows that in addition to a diminishing pool of available talent, the industry does not have widespread, empirically tested and implemented models that lead to effective successions. The objective of this research was to create a baseline profile for succession planning in the construction industry by identifying currently implemented best practices. The author interviewed six companies of varying sizes and demographics within the construction industry and compared their succession planning methodologies to identify any common challenges and practices. Little consensus between the companies was found. The results of the interviews were then compared to current research literature, but even here, little consensus was found. In addition, companies lacked quantitative performance metrics demonstrating the effectiveness, or ineffectiveness, of their current succession planning methodologies. The authors recommended that additional research is carried out to focus on empirical evidence and measurement of industry practices surrounding talent identification, development, and transition leading to succession.
ContributorsGunnoe, Jake A (Author) / Sullivan, Kenneth (Thesis advisor) / Wiezel, Avi (Committee member) / Kashiwagi, Dean (Committee member) / Arizona State University (Publisher)
Created2015