The construction industry in India suffers from major time and cost overruns. Data from government and industry reports suggest that projects suffer from 20 to 25 percent time and cost overruns. Waste of resources has been identified as a major source of inefficiency. Despite a substantial increase in the past

The construction industry in India suffers from major time and cost overruns. Data from government and industry reports suggest that projects suffer from 20 to 25 percent time and cost overruns. Waste of resources has been identified as a major source of inefficiency. Despite a substantial increase in the past few years, demand for professionals and contractors still exceeds supply by a large margin. The traditional methods adopted in the Indian construction industry may not suffice the needs of this dynamic environment, as they have produced large inefficiencies. Innovative ways of procurement and project management can satisfy the needs aspired to as well as bring added value. The problems faced by the Indian construction industry are very similar to those faced by other developing countries. The objective of this paper is to discuss and analyze the economic concerns, inefficiencies and investigate a model that both explains the Indian construction industry structure and provides a framework to improve efficiencies. The Best Value (BV) model is examined as an approach to be adopted in lieu of the traditional approach. This could result in efficient construction projects by minimizing cost overruns and delays, which until now have been a rarity.
ContributorsNihas, Syed (Author) / Kashiwagi, Dean (Thesis advisor) / Sullivan, Kenneth (Committee member) / Kashiwagi, Jacob (Committee member) / Arizona State University (Publisher)
Created2013
149802-Thumbnail Image.png
Description
Services outsourcing is a prevalent yet problematic phenomenon. On the one hand, more and more firms are outsourcing services function. On the other hand, we are faced with many services outsourcing failures. This research attempts to uncover some of the omitted causes of services outsourcing failure. It extends a conceptual

Services outsourcing is a prevalent yet problematic phenomenon. On the one hand, more and more firms are outsourcing services function. On the other hand, we are faced with many services outsourcing failures. This research attempts to uncover some of the omitted causes of services outsourcing failure. It extends a conceptual paper that used social network theory to examine the shifting of the triadic relationship structures among the service buyer, service supplier and the buyer's customers at different stages of the services outsourcing arrangements and its performance implications. This study empirically examines these performance implications. Specifically, this research defines the concept of bridge transfer, which denotes the weakening and dissolution of operational ties between the service buyer firms' and their end customers and the appearing and strengthening of operational ties between the service supplier firms and the end customers. It also empirically derives a measurement scale for this new construct. Further, the effects of bridge transfer on supplier's appropriation behavior, buyer's cost of quality and end customers' quality perception are examined in the context of customer facing services and are contrasted with those entail little or no customer interactions. In addition, the moderating roles of buyer-supplier relationship on the effects of bridge transfer are also examined. An Internet-based survey was administered to firms affiliated with CAPS Research and the Institute of Supply Management as the primary data source (n=137). Principal Component Analyses were used to derive a composite score for each of the model construct. Then linear regressions were used to detect the effects of bridge transfer on services outsourcing outcomes and to detect the moderating role of buyer-supplier relationships on these effects. The results show that bridge transfer is positively correlated to suppliers' appropriate behavior and negatively correlated to end customer's quality perception in the context of customer facing services. The effects of bridge transfer are not found for services that entail little or no interactions with the end customers. Instead, buyer-supplier relationship is found to be a key influencing factor to services outsourcing outcomes in this context. This study helps to pinpoint some of the omitted causes of services outsourcing failures and shed light on how to manage services outsourcing for success.
ContributorsLi, Mei (Author) / Choi, Thomas Y. (Thesis advisor) / Dooley, Kevin J (Committee member) / Bitner, Mary-Jo (Committee member) / Arizona State University (Publisher)
Created2011
137112-Thumbnail Image.png
Description
Abstract The purpose of this project is to utilize the models and concepts from Information Measurement Theory (IMT) to help minimize future decision making with respect to my career path. When I began this project, my future was clouded, my initial conditions were unknown, my stress over future career-path decisions

Abstract The purpose of this project is to utilize the models and concepts from Information Measurement Theory (IMT) to help minimize future decision making with respect to my career path. When I began this project, my future was clouded, my initial conditions were unknown, my stress over future career-path decisions was high, and I had eight possible career paths in mind. I have narrowed my career-path options from eight to four. In addition, I have determined a one-year plan that enables me to be prepared to pursue any of the four career paths that I have found align with me. In this project, I explored my dominant initial conditions with respect to my career path. I tracked the job history of my grandparents and parents. These efforts allowed me to identify the strengths and weaknesses that I was exhibiting by the age of three. Natural law dictates that the strengths and weaknesses of my younger self will be the same strengths and weakness that I excel at and struggle with today. I then used my understanding of natural law and the event model process to map the strengths and weaknesses of my parents and grandparents and to compare and contrast these to my strengths and weaknesses, including those that were apparent by the time that I was three years old. Focusing in on what I really want from a job, four main goals were established to grade the various future career-path options. Finally, I documented my transition from uncertainty to clarity. It began with my sobriety and ended with a milestone one-year plan that will give me information that I need to commit to my career path. This transition has had significant impact. The elusive "who am I" has been addressed, not completely but addressed sufficiently so that the question no longer plagues me. I know from where I have come. I have gained significant insight from those around me who know me. All of this has been documented for my own personal use, and for my children someday. This process permitted me to eliminate outliers from my eight original career paths, reducing them to four. In addition, application of IMT models and concepts has allowed me to see one year into the future. With my new-found knowledge, I will listen and watch the doors close on three of the remaining four career paths, as there is only one path I am meant to take.
ContributorsRichardson, Trevor Woods (Author) / Kashiwagi, Dean (Thesis director) / Kashiwagi, Jacob (Committee member) / Industrial, Systems (Contributor) / Barrett, The Honors College (Contributor) / Del E. Webb Construction (Contributor)
Created2014-05
153833-Thumbnail Image.png
Description
Delays are a major cause for concern in the construction industry both globally and locally in Saudi Arabia. This paper identifies the main causes of delay in infrastructure projects in the holy city of Makkah (Saudi Arabia) and compares these with projects around the rest of the country and other

Delays are a major cause for concern in the construction industry both globally and locally in Saudi Arabia. This paper identifies the main causes of delay in infrastructure projects in the holy city of Makkah (Saudi Arabia) and compares these with projects around the rest of the country and other Gulf countries as well. Data were obtained from 49 infrastructure projects that were undertaken by the owner and were analyzed quantitatively to understand the severity and causes of delay. 10 risk factors were identified in this study and these factors were grouped into four categories. The average delay in infrastructure projects in the city of Makkah was found to be 39%. The most severe cause of delay was found to be the land acquisition factor. This highlights the critical land ownership and acquisition issues that is prevailing in Makkah. In addition to this, other factors include contractors’ lack of expertise, haphazard underground utilities (line services), and re-designing. It is concluded that majority of delays were caused from the owner’s side as compared to contractors, consultants, and other project’s stakeholders. This finding was in line with the research findings of the Gulf Countries Construction (GCC) Industry’s literature as well. This study will fill an important practice and research gap for improving the efficiency in project delivery for infrastructure projects in the holy city of Makkah and the Gulf countries at large.
ContributorsElawi, Ghazi Saad A (Author) / Kashiwagi, Dean (Thesis advisor) / Sullivan, Kenneth (Committee member) / Kashiwagi, Jacob (Committee member) / Arizona State University (Publisher)
Created2015
153835-Thumbnail Image.png
Description
Saudi Arabia has been having many issues with large construction projects such as delays, low performance and high cost. Some studies show that around 70% of the public projects in Saudi Arabia are delayed. These issues have resulted from many factors. One of the factors believed to be delaying projects

Saudi Arabia has been having many issues with large construction projects such as delays, low performance and high cost. Some studies show that around 70% of the public projects in Saudi Arabia are delayed. These issues have resulted from many factors. One of the factors believed to be delaying projects is the Saudi procurement system. The Saudi procurement system only selects contracts based on the lowest bid price offered. However, the Saudi procurement system has been found to not only produce delayed low quality projects, but also has resulted in higher costs.

This paper shows how to modify the Saudi procurement system by implementing a clarification phase, which is the most important phase in the Performance Information Procurement System (PIPS). The clarification phase requires the bid’s winning contractor to submit a project scope, a project schedule, to identify risks that not their responsibility, performance measurements and a milestone schedule. The PIPS system has been one of the most successful systems around the world and has shown a 98% success rate in six different countries with risks and cost reductions up to 30%.

This research conducted a survey of 157 engineers, 33 consultants, 9 owners, 5 vendors, 13 academics, and 28 architects to develop the public procurement system in Saudi Arabia. The participants work in government sectors with an interest in the Saudi Arabian procurement system. 80.61 % of participants believe that the traditional Saudi procurement system consistently selects poor performing contractors. Moreover, 95.97% of participants think that the selection of contractors based only on the lowest price criterion affects projects negatively. Also, 96.20% of participants in the survey feel that there needs to be a change in the traditional Saudi Arabian procurement system. 88.7% of participants agree to require the contractor to identify risks, and 96.03 % of participants agree that the contractors must have a plan. Moreover, 95.45% of participants agree to require a contractor review the scope of a project and verify that it is correct. Finally, 82.18% of participants agree to require a contractor to resolve all owner concerns before signing a contract to improve construction projects performance. The paper shows the need to change the Saudi procurement system and a solution to this growing problem.
ContributorsAlofi, Ahmed Abdulrahman (Author) / Kashiwagi, Dean (Thesis advisor) / Sullivan, Kenneth (Committee member) / Kashiwagi, Jacob (Committee member) / Arizona State University (Publisher)
Created2015
155493-Thumbnail Image.png
Description
This thesis presents a literature research analyzing the cost overrun of the construction industry worldwide, exploring documented causes for cost overrun, and documented parties responsible for the inefficiency. The analysis looks at a comparison between the metrics of construction projects in different continents and regions. Multiple publication databases were used

This thesis presents a literature research analyzing the cost overrun of the construction industry worldwide, exploring documented causes for cost overrun, and documented parties responsible for the inefficiency. The analysis looks at a comparison between the metrics of construction projects in different continents and regions. Multiple publication databases were used to look into over 300 papers. It is shown that although construction demands are increasing, cost overrun on these projects is not decreasing at the same rate around the world. This thesis also presents a possible solution to improve cost overrun in the construction industry, through the use of the Best Value Performance Information Procurement System (BV PIPS). This is a system that has been utilized in various countries around the world, and has documented evidence that it may be able to alleviate the overrun occurring in the construction industry.
ContributorsGoyal, Abhinav (Author) / Kashiwagi, Jacob (Thesis advisor) / Kashiwagi, Dean (Committee member) / Chong, Oswald (Committee member) / Arizona State University (Publisher)
Created2017
155168-Thumbnail Image.png
Description
Saudi Arabia has been facing issues with completing construction projects on time and on budget. It has been documented that 70% of public construction projects are delayed. Studies have identified the low-bid delivery method as an important factor in causing such delays. The procurement system (low-bid) ignores contractors’ performance, and

Saudi Arabia has been facing issues with completing construction projects on time and on budget. It has been documented that 70% of public construction projects are delayed. Studies have identified the low-bid delivery method as an important factor in causing such delays. The procurement system (low-bid) ignores contractors’ performance, and that is reflected in projects’ performance. A case study was performed, at a University campus in northern Saudi Arabia, identifying the major causes of project delays and cost overruns. The University was experiencing delays from 50% to 150%. Also, the actual project costs for four projects were examined and found that all four projects’ costs were higher than the original bid. The delay and cost overruns factors were gathered from the University engineers. A literature research identified one construction management method, best value performance information procurement system (BV PIPS), has documented multiple times its ability to improve project performance. In a comparison using the result of a case study and the results of (BV PIPS), Saudi Arabia’s delivery system was identified as a potential cause of project performance issues. The current procurement system was analyzed and modified to adapt with the (BV PIPS). The proposed procurement system using BV PIPS, which can be implemented in Saudi Arabia, was created with owner side. A large survey was conducted of 761 classified contractors and 43 universities’ representatives who rated causes of delay factors and cost overruns. The delay factors were then compared to delay factors experienced on Saudi construction projects, identified by performing a literature research. The comparison identified 14 important causes of delays. Moreover, the survey showed that classified contractors and universities’ representatives unsatisfied with low-bid, and they agreed with BV PIPS which selecting vendors based on performance with price. The proposed model required a submitted level of experience (LE), risk assessment (RA), and value added (VA). Besides, project managers of vendors should be interviewed during the clarification phase. In addition, venders should submit the project’s scope, technical schedule, milestone schedule, and risk management plan. In the execution phase, vendors should submit a weekly risk report (WRR) and director’s report (DR).
ContributorsAlzara, Majed (Author) / Kashiwagi, Dean (Thesis advisor) / Kashiwagi, Jacob (Committee member) / Al-Tassan, Abdulrahman (Committee member) / Arizona State University (Publisher)
Created2016
149637-Thumbnail Image.png
Description
Original equipment manufacturers (buyers) are increasingly involving suppliers in new product development as a means to increase efficiency and expand capabilities. To realize such benefits, however, the two firms need to have appropriate communication and goal structures to minimize friction while maximizing design quality. In addition, the effectiveness of the

Original equipment manufacturers (buyers) are increasingly involving suppliers in new product development as a means to increase efficiency and expand capabilities. To realize such benefits, however, the two firms need to have appropriate communication and goal structures to minimize friction while maximizing design quality. In addition, the effectiveness of the inter-firm interaction process, i.e. their collaboration quality, is also a key success factor. This study draws from Information Process Theory to propose that higher technical and relational uncertainty requires more inter-firm communication. The misalignment between communication intensity and uncertainty reduces both design quality and design efficiency. Goal incongruence, which always lowers project performance, is less harmful for projects with high technical uncertainty due to the potential of the conflict resolving process in improving decision quality and efficiency. Finally I use Hackman's theory of work group effectiveness to propose that collaboration quality fully mediates the effects of communication intensity and goal congruence on project outcomes. The study used an empirical survey of manufacturers as the primary method of data collection. Manufacturers that integrate and assemble complex and discrete products are the target population. Design engineers and project managers from manufacturers were my target respondents. Both SEM and hierarchical regression were used to test the conceptual model. The dissertation made five theoretical contributions. First, I introduced the concept that there is an optimal level of inter-firm communication intensity, exceeding which lowers design efficiency without improving design quality. Second, I theoretically defined and empirically operationalized two types of uncertainty, one on the project level and one on the inter-firm level, which were shown to moderate the effects of inter-firm communication and goal structures on collaboration outcomes. Third, this study examined the conditions when goal congruence is more effective in improving collaboration outcomes. Fourth, this study nominally and operationally defined collaboration quality, a theoretical construct which measure the effectiveness of inter-partner interactions rather than mere existence or amount of certain activities pursued by partners. Finally, I proposed several enhancements to existing construct measures.
ContributorsYan, Tingting (Author) / Dooley, Kevin (Thesis advisor) / Choi, Thomas (Committee member) / Carter, Joseph (Committee member) / Arizona State University (Publisher)
Created2011