Matching Items (395)
ContributorsWard, Geoffrey Harris (Performer) / ASU Library. Music Library (Publisher)
Created2018-03-18
150133-Thumbnail Image.png
Description
ABSTRACT Facility managers have an important job in today's competitive business world by caring for the backbone of the corporation's capital. Maintaining assets and the support efforts cause facility managers to fight an uphill battle to prove the worth of their organizations. This thesis will discuss the important and flexible

ABSTRACT Facility managers have an important job in today's competitive business world by caring for the backbone of the corporation's capital. Maintaining assets and the support efforts cause facility managers to fight an uphill battle to prove the worth of their organizations. This thesis will discuss the important and flexible use of measurement and leadership reports and the benefits of justifying the work required to maintain or upgrade a facility. The task is streamlined by invoking accountability to subject experts. The facility manager must trust in the ability of his or her work force to get the job done. However, with accountability comes increased risk. Even though accountability may not alleviate total control or cease reactionary actions, facility managers can develop key leadership based reports to reassign accountability and measure subject matter experts while simultaneously reducing reactionary actions leading to increased cost. Identifying and reassigning risk that are not controlled to subject matter experts is imperative for effective facility management leadership and allows facility managers to create an accurate and solid facility management plan, supports the organization's succession plan, and allows the organization to focus on key competencies.
ContributorsTellefsen, Thor (Author) / Sullivan, Kenneth (Thesis advisor) / Kashiwagi, Dean (Committee member) / Badger, William (Committee member) / Arizona State University (Publisher)
Created2011
150719-Thumbnail Image.png
Description
This dissertation presents a portable methodology for holistic planning and optimization of right of way infrastructure rehabilitation that was designed to generate monetary savings when compared to planning that only considers single infrastructure components. Holistic right of way infrastructure planning requires simultaneous consideration of the three right of way infrastructure

This dissertation presents a portable methodology for holistic planning and optimization of right of way infrastructure rehabilitation that was designed to generate monetary savings when compared to planning that only considers single infrastructure components. Holistic right of way infrastructure planning requires simultaneous consideration of the three right of way infrastructure components that are typically owned and operated under the same municipal umbrella: roads, sewer, and water. The traditional paradigm for the planning of right way asset management involves operating in silos where there is little collaboration amongst different utility departments in the planning of maintenance, rehabilitation, and renewal projects. By collaborating across utilities during the planning phase, savings can be achieved when collocated rehabilitation projects from different right of way infrastructure components are synchronized to occur at the same time. These savings are in the form of shared overhead and mobilization costs, and roadway projects providing open space for subsurface utilities. Individual component models and a holistic model that utilize evolutionary algorithms to optimize five year maintenance, rehabilitation, and renewal plans for the road, sewer, and water components were created and compared. The models were designed to be portable so that they could be used with any infrastructure condition rating, deterioration modeling, and criticality assessment systems that might already be in place with a municipality. The models attempt to minimize the overall component score, which is a function of the criticality and condition of the segments within each network, by prescribing asset management activities to different segments within a component network while subject to a constraining budget. The individual models were designed to represent the traditional decision making paradigm and were compared to the holistic model. In testing at three different budget levels, the holistic model outperformed the individual models in the ability to generate five year plans that optimized prescribed maintenance, rehabilitation and renewal for various segments in order to achieve the goal of improving the component score. The methodology also achieved the goal of being portable, in that it is compatible with any condition rating, deterioration, and criticality system.
ContributorsCarey, Brad David (Author) / Lueke, Jason S (Thesis advisor) / Ariaratnam, Samuel (Committee member) / Bashford, Howard (Committee member) / Arizona State University (Publisher)
Created2012
ContributorsBolari, John (Performer) / ASU Library. Music Library (Publisher)
Created2018-10-04
137405-Thumbnail Image.png
Description
The efficient refurbishment of rotable parts on an aircraft proves to be a main concern for airline carriers today. Airlines must be able to seamlessly rotate parts into and out of the system for maintenance in accordance with FAA requirements while leaving daily operations uninterrupted. In this paper, we develo

The efficient refurbishment of rotable parts on an aircraft proves to be a main concern for airline carriers today. Airlines must be able to seamlessly rotate parts into and out of the system for maintenance in accordance with FAA requirements while leaving daily operations uninterrupted. In this paper, we develop an airline maintenance scheduling model that constructs an optimal schedule for part maintenance over a given time horizon using deterministic forecasting techniques. The model generates a schedule that minimizes the total cost of a maintenance schedule solution while maximizing the utility of all parts in the system. The model is then tested against actual network data of three part types crucial to airline operations and used to investigate the current data collection processes of US Airways maintenance lead time metrics. Manual sensitivity analysis is performed to generate the marginal value of each parameter and potential model extensions are highlighted as a result of these conclusions.
ContributorsDunham, Nicole Elizabeth (Author) / Gel, Esma (Thesis director) / Jacobs, Timothy (Committee member) / Clough, Michael (Committee member) / Industrial, Systems (Contributor) / Barrett, The Honors College (Contributor)
Created2013-12
ContributorsOftedahl, Paul (Performer) / ASU Library. Music Library (Publisher)
Created2018-09-29
134261-Thumbnail Image.png
Description
Building information modeling (BIM) has already sparked changes in design and construction practices, ranging from new methods to coordinate work during design to supporting paperless construction sites where crews use handheld devices in lieu of paper plans. It is seen as the starting point for the larger picture, virtual design

Building information modeling (BIM) has already sparked changes in design and construction practices, ranging from new methods to coordinate work during design to supporting paperless construction sites where crews use handheld devices in lieu of paper plans. It is seen as the starting point for the larger picture, virtual design and construction (VDC). While some research has explored the feasibility of using BIM for Facilities Management (FM) this practice is yet to become widely accepted and integrated. This paper explores how VDC could improve the operations of a Facilities Management department at a large state university. Specifically, the authors examine the degree to which institutional requirements foster BIM use during building operations, the ability of models to interface with existing FM software, and the willingness of FM executives to incorporate BIM into their processes. The authors also discuss the sorts of information contained in building models that FM could find most useful, and highlight those pieces of information required for FM that many building models do not contain. Finally, the paper closes with a set of recommendations about how to create building models that more seamlessly integrate into existing Facilities Management processes at the university studied, in order to draw a set of recommendations that may apply more broadly to state universities and similar institutions.
ContributorsHebel, Natasha Faith (Author) / Parrish, Kristen (Thesis director) / Ayer, Steven (Committee member) / Del E. Webb School of Construction (Contributor) / Barrett, The Honors College (Contributor)
Created2017-05
135011-Thumbnail Image.png
Description
The culture of the 1970s in the United States of America was progressive and revolutionary. Due to various events that were unfavorable to the public, U.S. citizens began to lose trust in their government. Signs of the public's revolt and dissention began to show in laws and propositions voters passed.

The culture of the 1970s in the United States of America was progressive and revolutionary. Due to various events that were unfavorable to the public, U.S. citizens began to lose trust in their government. Signs of the public's revolt and dissention began to show in laws and propositions voters passed. In California, Proposition 13 was one of many anti-tax laws taxpayers voted for to cut back the control of the government. As a result, revenues for public services and improvements decreased and maintenance allocations for infrastructure systems were considerably reduced. Fast-forwarding to today, infrastructure systems in the U.S. are reaching their retirement period and are requiring extreme maintenance and attention. Los Angeles has been experiencing severe water main breaks in its water distribution system for several years now, but the city is lacking funds to replace the aging pipes. The lack of funds paired with aging infrastructure indicates there is a flaw in the forecasting analysis techniques used today to project infrastructure costs. Therefore, an alternative discounting function to the exponential is proposed: the hyperbolic discounting function. A comparative analysis was performed using a hyperbolic and an exponential discounting function. The two functions were calibrated over the course of 50 years and the parameters r and a were determined. Then the discounts were applied to a 50-year expenditure projection for pipe replacements of a water distribution system. The present value was computed with each discount function and results were obtained. By year 50, the hyperbolic function yielded a higher present value of $25.06 million and the exponential function yielded a present value of $14 million. These results lead to the conclusion that the hyperbolic discounting function is the preferred methodology when calculating long-term expenditures, especially those dependent on tax revenue.
ContributorsSawyer, Madeline Elizabeth (Author) / Seager, Thomas (Thesis director) / Clark, Susan (Committee member) / McBurnett, Lauren (Committee member) / Civil, Environmental and Sustainable Engineering Programs (Contributor) / Barrett, The Honors College (Contributor)
Created2016-12
ContributorsMarshall, Kimberly (Performer) / Meszler, Alexander (Performer) / Yatso, Toby (Narrator) / ASU Library. Music Library (Publisher)
Created2018-09-16
155453-Thumbnail Image.png
Description
The purpose of this paper is to present a case study on the application of the Lean Six Sigma (LSS) quality improvement methodology and tools to study the analysis and improvement of facilities management (FM) services at a healthcare organization. Research literature was reviewed concerning whether or not LSS has

The purpose of this paper is to present a case study on the application of the Lean Six Sigma (LSS) quality improvement methodology and tools to study the analysis and improvement of facilities management (FM) services at a healthcare organization. Research literature was reviewed concerning whether or not LSS has been applied in healthcare-based FM, but no such studies have been published. This paper aims to address the lack of an applicable methodology for LSS intervention within the context of healthcare-based FM. The Define, Measure, Analyze, Improve, and Control (DMAIC) framework was followed to test the hypothesis that LSS can improve the service provided by an FM department responsible for the maintenance and repair of furniture and finishes at a large healthcare organization in the southwest United States of America. Quality improvement curricula and resources offered by the case study organization equipped the FM department to apply LSS over the course of a five-month period. Qualitative data were gathered from pre- and post-intervention surveys while quantitative data were gathered with the Organization’s computerized maintenance management system (CMMS) software. Overall, LSS application proved to be useful for the intended purpose. The author proposes that application of LSS by other FM departments to improve their services could also be successful, which is noteworthy and deserving of continued research.
ContributorsShirey, William T (Author) / Sullivan, Kenneth (Thesis advisor) / Smithwick, Jake (Committee member) / Lines, Brian (Committee member) / Arizona State University (Publisher)
Created2017