Matching Items (6)
Filtering by

Clear all filters

152652-Thumbnail Image.png
Description
A mule deer herd exists on the northern rim of the Grand Canyon, located on the North Kaibab Plateau. Historical references to this indigenous mule deer herd presented reports of periodic population irruption and collapse. Partially funded by the Arizona Game and Fish Department and the Arizona Deer Association, examination

A mule deer herd exists on the northern rim of the Grand Canyon, located on the North Kaibab Plateau. Historical references to this indigenous mule deer herd presented reports of periodic population irruption and collapse. Partially funded by the Arizona Game and Fish Department and the Arizona Deer Association, examination of herd nutritional and metabolic status from the Fall 2005 - Spring 2008 was completed at the request of AzGFD and ADA. Habitat analysis included forage micro-histological, protein, and caloric content plus whole blood and plasma assays gauging herd metabolic response. Modelling was completed using best management practices wildlife energy demand calculations and principal component analysis. Forage quality analysis and modelling suggest a sufficient amount of nitrogen (N) available (DPI) to the deer for protein synthesis. Energy analysis (MEI) of forage suggest caloric deficiencies are widely prevalent on the north Kaibab plateau. Principal component analysis integrates forage and metabolic results providing a linear regression model describing the dynamics of forage utilization, energy availability, and forage nitrogen supply with metabolic demand and response of the mule deer herd. Most of the plasma and blood metabolic indicators suggest baseline values for the North Kaibab mule deer. Albumin values are in agreement with albumin values for mule deer in the Southwest. I suggest that the agreed values become a standard for mule deer in the Southwestern U.S. As excess dietary N is converted to a caloric resource, a continual state of under-nutrition exists for the deer upon entering the N. Kaibab winter range. The population is exceeding the nutritional resource plane that the winter habitat provides. Management recommendations include implementation of multiple small-scale habitat rehabilitation efforts over time, including invasive juniper (Juniperous osteosperma) and piñon (Pinus edulis) management, prescribed burning to control big sage (Artemesia tridentata) populations, and reseeding treated areas with a seed mix of native shrubs, grasses and forbs. I recommended that the population size of the North Kaibab deer herd is maintained at the current size with natural selection controlling growth, or the population be artificially reduced through increased hunting opportunities.
ContributorsActon, Matthew W (Author) / Miller, William H. (Thesis advisor) / Brady, Ward W. (Committee member) / Huffman, Holly (Committee member) / Arizona State University (Publisher)
Created2014
153267-Thumbnail Image.png
Description
In riparian ecosystems, reptiles and amphibians are good indicators of environmental conditions. Herpetofauna have been linked to specific microhabitat characteristics, microclimates, and water resources in riparian forests. My objective was to relate herpetofauna abundance to changes in riparian habitat along the Virgin River caused by the Tamarix biological control agent,

In riparian ecosystems, reptiles and amphibians are good indicators of environmental conditions. Herpetofauna have been linked to specific microhabitat characteristics, microclimates, and water resources in riparian forests. My objective was to relate herpetofauna abundance to changes in riparian habitat along the Virgin River caused by the Tamarix biological control agent, Diorhabda carinulata, and riparian restoration.

During 2013 and 2014, vegetation and herpetofauna were monitored at 21 riparian locations along the Virgin River via trapping and visual encounter surveys. Study sites were divided into four stand types based on density and percent cover of dominant trees (Tamarix, Prosopis, Populus, and Salix) and presence of restoration activities: Tam, Tam-Pros, Tam-Pop/Sal, and Restored Tam-Pop/Sal. Restoration activities consisted of mechanical removal of non-native trees, transplanting native trees, and introduction of water flow. All sites were affected by biological control. I predicted that herpetofauna abundance would vary between stand types and that herpetofauna abundance would be greatest in Restored Tam-Pop/Sal sites due to increased habitat openness and variation following restoration efforts.

Results from trapping indicated that Restored Tam-Pop/Sal sites had three times more total lizard and eight times more Sceloporus uniformis captures than other stand types. Anaxyrus woodhousii abundance was greatest in Tam-Pop/Sal and Restored Tam-Pop/Sal sites. Visual encounter surveys indicated that herpetofauna abundance was greatest in the Restored Tam-Pop/Sal site compared to the adjacent Unrestored Tam-Pop/Sal site. Habitat variables were reduced to six components using a principle component analysis and significant differences were detected among stand types. Restored Tam-Pop/Sal sites were most similar to Tam-Pop/Sal sites. S. uniformis were positively associated with large woody debris and high densities of Populus, Salix, and large diameter Prosopis.

Restored Tam-Pop/Sal sites likely supported higher abundances of herpetofauna, as these areas exhibited greater habitat heterogeneity. Restoration activities created a mosaic habitat by reducing canopy cover and increasing native tree density and surface water. Natural resource managers should consider implementing additional restoration efforts following biological control when attempting to restore riparian areas dominated by Tamarix and other non-native trees.
ContributorsMosher, Kent (Author) / Bateman, Heather L (Thesis advisor) / Stromberg, Juliet C. (Committee member) / Miller, William H. (Committee member) / Arizona State University (Publisher)
Created2014
155314-Thumbnail Image.png
Description
Species conservation requires an understanding of the habitats on which that species depends as well as how it moves within and among those habitats. Knowledge of these spatial and temporal patterns is vital for effective management and research study design. Bubbling Ponds Hatchery in Cornville, Arizona, supports a robust population

Species conservation requires an understanding of the habitats on which that species depends as well as how it moves within and among those habitats. Knowledge of these spatial and temporal patterns is vital for effective management and research study design. Bubbling Ponds Hatchery in Cornville, Arizona, supports a robust population of the northern Mexican gartersnake (Thamnophis eques megalops), which was listed as threatened under the Endangered Species Act in 2014. Natural resource managers are interested in understanding the ecology of gartersnakes at this site to guide hatchery operations and to serve as a model for habitat creation and restoration. My objectives were to identify habitat selection and activity patterns of northern Mexican gartersnakes at the hatchery and how frequency of monitoring affects study results. I deployed transmitters on 42 individual gartersnakes and documented macro- and microhabitat selection, daily and seasonal activity patterns, and movement distances. Habitat selection and movements were similar between males and females and varied seasonally. During the active season (March–October), snakes primarily selected wetland edge habitat with abundant cover and were more active and moved longer distances than during other parts of the year. Gestating females selected similar locations but with less dense cover. During the inactive season (November–February), snakes were less mobile and selected upland habitats, including rocky slopes with abundant vegetation. Snakes displayed diurnal patterns of activity. Estimates of daily distance traveled decreased with less-frequent monitoring; a sampling interval of once every 24 hours yielded only 53–62% of known daily distances moved during the active season. These results can help inform management activities and research design. Conservation of this species should incorporate a landscape-level approach that includes abundant wetland edge habitat with connected upland areas. Resource managers and researchers should carefully assess timing and frequency of activities in order to meet project objectives.
ContributorsSprague, Tiffany A (Author) / Bateman, Heather L (Thesis advisor) / Cunningham, Stan C (Committee member) / Jones, Thomas R (Committee member) / Nowak, Erika M. (Committee member) / Arizona State University (Publisher)
Created2017
149127-Thumbnail Image.png
Description

This brief article, written for a symposium on "Collaboration and the Colorado River," evaluates the U.S. Department of the Interior's Glen Canyon Dam Adaptive Management Program ("AMP"). The AMP has been advanced as a pioneering collaborative and adaptive approach for both decreasing scientific uncertainty in support of regulatory decision-making and

This brief article, written for a symposium on "Collaboration and the Colorado River," evaluates the U.S. Department of the Interior's Glen Canyon Dam Adaptive Management Program ("AMP"). The AMP has been advanced as a pioneering collaborative and adaptive approach for both decreasing scientific uncertainty in support of regulatory decision-making and helping manage contentious resource disputes -- in this case, the increasingly thorny conflict over the Colorado River's finite natural resources. Though encouraging in some respects, the AMP serves as a valuable illustration of the flaws of existing regulatory processes purporting to incorporate collaboration and regulatory adaptation into the decision-making process. Born in the shadow of the law and improvised with too little thought as to its structure, the AMP demonstrates the need to attend to the design of the regulatory process and integrate mechanisms that compel systematic program evaluation and adaptation. As such, the AMP provides vital information on how future collaborative experiments might be modified to enhance their prospects of success.

ContributorsCamacho, Alejandro E. (Author)
Created2008-09-19
149140-Thumbnail Image.png
Description

With a focus on resources of the Colorado River ecosystem below Glen Canyon Dam, the Glen Canyon Dam Adaptive Management Program has included a variety of experimental policy tests, ranging from manipulation of water releases from the dam to removal of non-native fish within Grand Canyon National Park. None of

With a focus on resources of the Colorado River ecosystem below Glen Canyon Dam, the Glen Canyon Dam Adaptive Management Program has included a variety of experimental policy tests, ranging from manipulation of water releases from the dam to removal of non-native fish within Grand Canyon National Park. None of these field-scale experiments has yet produced unambiguous results in terms of management prescriptions. But there has been adaptive learning, mostly from unanticipated or surprising resource responses relative to predictions from ecosystem modeling. Surprise learning opportunities may often be viewed with dismay by some stakeholders who might not be clear about the purpose of science and modeling in adaptive management. However, the experimental results from the Glen Canyon Dam program actually represent scientific successes in terms of revealing new opportunities for developing better river management policies. A new long-term experimental management planning process for Glen Canyon Dam operations, started in 2011 by the U.S. Department of the Interior, provides an opportunity to refocus management objectives, identify and evaluate key uncertainties about the influence of dam releases, and refine monitoring for learning over the next several decades. Adaptive learning since 1995 is critical input to this long-term planning effort. Embracing uncertainty and surprise outcomes revealed by monitoring and ecosystem modeling will likely continue the advancement of resource objectives below the dam, and may also promote efficient learning in other complex programs.

ContributorsMelis, Theodore S. (Author) / Walters, Carl (Author) / Korman, Josh (Author)
Created2015
149142-Thumbnail Image.png
Description

The Glen Canyon Dam Adaptive Management Program (AMP) has been identified as a model for natural resource management. We challenge that assertion, citing the lack of progress toward a long-term management plan for the dam, sustained extra-programmatic conflict, and a downriver ecology that is still in jeopardy, despite over ten

The Glen Canyon Dam Adaptive Management Program (AMP) has been identified as a model for natural resource management. We challenge that assertion, citing the lack of progress toward a long-term management plan for the dam, sustained extra-programmatic conflict, and a downriver ecology that is still in jeopardy, despite over ten years of meetings and an expensive research program. We have examined the primary and secondary sources available on the AMP’s design and operation in light of best practices identified in the literature on adaptive management and collaborative decision-making. We have identified six shortcomings: (1) an inadequate approach to identifying stakeholders; (2) a failure to provide clear goals and involve stakeholders in establishing the operating procedures that guide the collaborative process; (3) inappropriate use of professional neutrals and a failure to cultivate consensus; (4) a failure to establish and follow clear joint fact-finding procedures; (5) a failure to produce functional written agreements; and (6) a failure to manage the AMP adaptively and cultivate long-term problem-solving capacity.

Adaptive management can be an effective approach for addressing complex ecosystem-related processes like the operation of the Glen Canyon Dam, particularly in the face of substantial complexity, uncertainty, and political contentiousness. However, the Glen Canyon Dam AMP shows that a stated commitment to collaboration and adaptive management is insufficient. Effective management of natural resources can only be realized through careful attention to the collaborative design and implementation of appropriate problem-solving and adaptive-management procedures. It also requires the development of an appropriate organizational infrastructure that promotes stakeholder dialogue and agency learning. Though the experimental Glen Canyon Dam AMP is far from a success of collaborative adaptive management, the lessons from its shortcomings can foster more effective collaborative adaptive management in the future by Congress, federal agencies, and local and state authorities.

ContributorsSusskind, Lawrence (Author) / Camacho, Alejandro E. (Author) / Schenk, Todd (Author)
Created2010-03-23