Matching Items (8)
Filtering by

Clear all filters

149708-Thumbnail Image.png
Description
Semiconductor manufacturing facilities are very complex and capital intensive in nature. During the lifecycle of these facilities various disciplines come together, generate and use a tremendous amount of building and process information to support various decisions that enable them to successfully design, build and sustain these advanced facilities. However, a

Semiconductor manufacturing facilities are very complex and capital intensive in nature. During the lifecycle of these facilities various disciplines come together, generate and use a tremendous amount of building and process information to support various decisions that enable them to successfully design, build and sustain these advanced facilities. However, a majority of the information generated and processes taking place are neither integrated nor interoperable and result in a high degree of redundancy. The objective of this thesis is to build an interoperable Building Information Model (BIM) for the Base-Build and Tool Installation in a semiconductor manufacturing facility. It examines existing processes and data exchange standards available to facilitate the implementation of BIM and provides a framework for the development of processes and standards that can help in building an intelligent information model for a semiconductor manufacturing facility. To understand the nature of the flow of information between the various stakeholders the flow of information between the facility designer, process tool manufacturer and tool layout designer is examined. An information model for the base build and process tool is built and the industry standards SEMI E6 and SEMI E51 are used as a basis to model the information. It is found that applications used to create information models support interoperable industry standard formats such as the Industry Foundation Classes (IFC) and ISO 15926 in a limited manner. A gap analysis has revealed that interoperability standards applicable to the semiconductor manufacturing industry such as the IFC and ISO15926 need to be expanded to support information transfers unique to the industry. Information modeling for a semiconductor manufacturing facility is unique in that it is a process model (Process Tool Information Model) within a building model (Building Information Model), each of them supported more robustly by different interoperability standards. Applications support interoperability data standards specific to the domain or industry they serve but information transfers need to occur between the various domains. To facilitate flow of information between the different domains it is recommended that a mapping of the industry standards be undertaken and translators between them be developed for business use.
ContributorsPindukuri, Shruthi (Author) / Chasey, Allan D (Thesis advisor) / Wiezel, Avi (Committee member) / Mamlouk, Michael (Committee member) / Arizona State University (Publisher)
Created2011
150449-Thumbnail Image.png
Description
Current information on successful leadership and management practices is contradictory and inconsistent, which makes difficult to understand what successful business practices are and what are not. The purpose of this study is to identify a simple process that quickly and logically identifies consistent and inconsistent leadership and management criteria. The

Current information on successful leadership and management practices is contradictory and inconsistent, which makes difficult to understand what successful business practices are and what are not. The purpose of this study is to identify a simple process that quickly and logically identifies consistent and inconsistent leadership and management criteria. The hypothesis proposed is that Information Measurement Theory (IMT) along with the Kashiwagi Solution Model (KSM) is a methodology than can differentiate between accurate and inaccurate principles the initial part of the study about authors in these areas show how information is conflictive, and also served to establish an initial baseline of recommended practices aligned with IMT. The one author that excels in comparison to the rest suits the "Initial Baseline Matrix from Deming" which composes the first model. The second model is denominated the "Full Extended KSM-Matrix" composed of all the LS characteristics found among all authors and IMT. Both models were tested-out for accuracy. The second part of the study was directed to evaluate the perception of individuals on these principles. Two different groups were evaluated, one group of people that had prior training and knowledge of IMT; another group of people without any knowledge of IMT. The results of the survey showed more confusion in the group of people without knowledge to IMT and improved consistency and less variation in the group of people with knowledge in IMT. The third part of the study, the analysis of case studies of success and failure, identified principles as contributors, and categorized them into LS/type "A" characteristics and RS/type "C" characteristics, by applying the KSM. The results validated the initial proposal and led to the conclusion that practices that fall into the LS side of the KSM will lead to success, while practices that fall into the RS of the KSM will lead to failure. The comparison and testing of both models indicated a dominant support of the IMT concepts as contributors to success; while the KSM model has a higher accuracy of prediction.
ContributorsReynolds, Harry (Author) / Kashiwagi, Dean (Thesis advisor) / Sullivan, Kenneth (Committee member) / Badger, William (Committee member) / Arizona State University (Publisher)
Created2011
153835-Thumbnail Image.png
Description
Saudi Arabia has been having many issues with large construction projects such as delays, low performance and high cost. Some studies show that around 70% of the public projects in Saudi Arabia are delayed. These issues have resulted from many factors. One of the factors believed to be delaying projects

Saudi Arabia has been having many issues with large construction projects such as delays, low performance and high cost. Some studies show that around 70% of the public projects in Saudi Arabia are delayed. These issues have resulted from many factors. One of the factors believed to be delaying projects is the Saudi procurement system. The Saudi procurement system only selects contracts based on the lowest bid price offered. However, the Saudi procurement system has been found to not only produce delayed low quality projects, but also has resulted in higher costs.

This paper shows how to modify the Saudi procurement system by implementing a clarification phase, which is the most important phase in the Performance Information Procurement System (PIPS). The clarification phase requires the bid’s winning contractor to submit a project scope, a project schedule, to identify risks that not their responsibility, performance measurements and a milestone schedule. The PIPS system has been one of the most successful systems around the world and has shown a 98% success rate in six different countries with risks and cost reductions up to 30%.

This research conducted a survey of 157 engineers, 33 consultants, 9 owners, 5 vendors, 13 academics, and 28 architects to develop the public procurement system in Saudi Arabia. The participants work in government sectors with an interest in the Saudi Arabian procurement system. 80.61 % of participants believe that the traditional Saudi procurement system consistently selects poor performing contractors. Moreover, 95.97% of participants think that the selection of contractors based only on the lowest price criterion affects projects negatively. Also, 96.20% of participants in the survey feel that there needs to be a change in the traditional Saudi Arabian procurement system. 88.7% of participants agree to require the contractor to identify risks, and 96.03 % of participants agree that the contractors must have a plan. Moreover, 95.45% of participants agree to require a contractor review the scope of a project and verify that it is correct. Finally, 82.18% of participants agree to require a contractor to resolve all owner concerns before signing a contract to improve construction projects performance. The paper shows the need to change the Saudi procurement system and a solution to this growing problem.
ContributorsAlofi, Ahmed Abdulrahman (Author) / Kashiwagi, Dean (Thesis advisor) / Sullivan, Kenneth (Committee member) / Kashiwagi, Jacob (Committee member) / Arizona State University (Publisher)
Created2015
155073-Thumbnail Image.png
Description
Research has shown roofing systems with high solar reflectance and thermal emissivity lead to less heat absorption, a consequential reduction in cooling load demand, and a resultant reduction on energy expenditure. Studies on energy savings from cool roof coatings have been conducted for decades and when compared to more traditional

Research has shown roofing systems with high solar reflectance and thermal emissivity lead to less heat absorption, a consequential reduction in cooling load demand, and a resultant reduction on energy expenditure. Studies on energy savings from cool roof coatings have been conducted for decades and when compared to more traditional roofing systems have demonstrated energy savings ranging from 2-40%, with average savings estimated at 20%. The 20% average is widely used by cool roof industry professionals, designers, and contractors to market and sell the technology in the commercial sector to owners and owner representatives researching new roofs. While the 20% energy savings is a documented average, unfortunately there is no average roof. Each roof is unique considering size, materials, and location to name a few. In addition, the ability of the cool roof to maintain the original solar reflectance is integral to realizing energy savings. The case study calculated project payback for a 20-year cool roof design using both 30% and 20% estimated annual energy savings. In addition, building material specifications and solar reflectance attenuation in respect to reductions in cooling energy were projected into the payback calculations. Lastly, the cost impact of cleaning maintenance was added to the calculations to provide an analysis on affect to anticipated payback schedules. The results showed cleaning costs only added 1 year to project paybacks and saved over 262,244 kWh over 20 years.
ContributorsHaverstic, Preston (Author) / Sullivan, Kenneth (Thesis advisor) / Okamura, Patrick (Committee member) / Slife, Curtis (Committee member) / Arizona State University (Publisher)
Created2016
155824-Thumbnail Image.png
Description
The higher education sector is always changing and seeks for robust methodologies to make education more effective and produce higher quality products which are the future professionals. While each student has different preference in learning, numerous forms of instructional strategies are adopted to engage students in varied ways. Existing

The higher education sector is always changing and seeks for robust methodologies to make education more effective and produce higher quality products which are the future professionals. While each student has different preference in learning, numerous forms of instructional strategies are adopted to engage students in varied ways. Existing literature has studied the impacts of various teaching strategies on students’ performance. Previous studies did not figure out if personal characteristics such as honestly, emotionality, etc. have any impacts on the students’ academic performance. This master thesis uses the detailed information gathered through surveying construction students and analyses such data to determine the relationship between various personal factors and understand if there is any relation between students’ academic performance and personal characteristics. This work has used HEXACO factor scales and Emotional Intelligence (EI) as a basis of its analysis. Results of this analysis indicated that there is no significant correlation between students’ academic performance and HEXACO and EI criteria. Although the analysis process tried to provide the most accurate and robust results, but findings could potentially be affected by a number of factors such as excluding some survey responses from data analysis due to confusing responses or being outlier.
ContributorsDadvar, Atefeh (Author) / Sullivan, Kenneth (Thesis advisor) / Smithwick, Jake (Committee member) / Lines, Brian (Committee member) / Arizona State University (Publisher)
Created2017
168336-Thumbnail Image.png
Description
Many public agencies and/or private owners have no standards that help them to select the most suitable delivery method for their capital projects; hence, in some cases, this results in selecting the inappropriate project delivery method. This adversely impacts the project performance and leads to many negative consequences; starting with

Many public agencies and/or private owners have no standards that help them to select the most suitable delivery method for their capital projects; hence, in some cases, this results in selecting the inappropriate project delivery method. This adversely impacts the project performance and leads to many negative consequences; starting with schedule growth, cost overrun, and may end up in an epic failure of the project. This research mainly focuses on developing a guideline to help owners make the decision on selecting the most appropriate delivery method for their capital projects. This research goes through three stages: Stage 1 - An extensive literature review of past research is conducted to conclude the selection factors considered in the decision-making process and the decision analysis technique and the project delivery methods; Stage 2 - This stage includes building up the selection model and setting out its guidelines; Stage 3 - This is the final stage of the research thread and includes the validation of the selection model through applying this model on some case study projects by industry practitioners, then evaluating the final results. The owner’s guideline for project delivery method selection, developed within this research, is designed to help owners increase the project success likelihood by selecting the suitable project delivery methods during the pre-construction phase (planning phase of the project life cycle).
ContributorsSallam, Omar Mohamed (Author) / Sullivan, Kenneth (Thesis advisor) / Hurtado, Kristen (Committee member) / Kutz, Barry (Committee member) / Arizona State University (Publisher)
Created2021
189310-Thumbnail Image.png
Description
The construction industry is the backbone of any country’s economy. It is a primary source of foreign investments, creates new jobs, and maintains the economy flowing in various trades. Accurate cost estimation is a critical aspect for the construction industry, directly impacting project success and profitability. This master's thesis focuses

The construction industry is the backbone of any country’s economy. It is a primary source of foreign investments, creates new jobs, and maintains the economy flowing in various trades. Accurate cost estimation is a critical aspect for the construction industry, directly impacting project success and profitability. This master's thesis focuses on comprehensively identifying the key factors that influence cost estimation and provides valuable recommendations for constructing an optimized Artificial Neural Network (ANN) model. Through an extensive research methodology encompassing literature review, surveys, and interviews with industry professionals, this study uncovers significant factors that exert a substantial impact on cost estimation practices. The findings emphasize the importance of seamlessly integrating project delivery systems, meticulously considering project duration, and incorporating diverse perspectives from global regions. By incorporating these insights, stakeholders can make informed decisions, enhance project planning, and elevate overall project performance. This study successfully bridges the gap between theory and practice, presenting invaluable insights for stakeholders within the construction industry. Keywords: cost estimation, construction industry, Artificial Neural Network, factors, project delivery systems, project duration, global perspectives, informed decision-making, project planning, project performance
ContributorsAL Saber, Salem Samer (Author) / Sullivan, Kenneth (Thesis advisor) / Hurtado, Kristian (Committee member) / Standage, Richard (Committee member) / Arizona State University (Publisher)
Created2023
171452-Thumbnail Image.png
Description
In a world where everything is drifting away from the intellectual into materialistic, and where everyone is rushing on the daily basis to provide their basic needs, everything is getting more expensive except the human life’s worth. Construction sites can be some of the clearer examples that show how the

In a world where everything is drifting away from the intellectual into materialistic, and where everyone is rushing on the daily basis to provide their basic needs, everything is getting more expensive except the human life’s worth. Construction sites can be some of the clearer examples that show how the technical work, the communication skills, team work and management relate to one another. However, lately, the safety of the labor is neither being prioritized nor considered an important aspect to even consider at sites. Lebanon is, unfortunately, one of the countries where most construction sites are aimed to increase production and decrease cost as much as possible, on behalf of labor safety measurements. The high occurrence of such cases are the result of the lack of government control and accountability, as well as other reasonings. Similar to the majority of countries, falls are the number one cause of fatalities and serious injuries on construction sites, especially building sites, where working on higher elevations is a must. This thesis focuses on the topic of “Techniques and technologies for reducing fall hazards in use on Lebanese building construction projects”. The main goal behind it is to shed light on whether there are any traditional, technical or modern mechanisms used for safety on the Lebanese construction sites, however statistically few they might be. On the other hand, Casting the deficiencies, weaknesses and flaws are also discussed by indicating some solutions and pointers on possible methods to improve. Hence, this thesis would demonstrate the high importance of this topic and consequently help construction managers and workers realize that safety should become a priority on all sites in the country. Researches done and interviews conducted show that fall hazards prevention/protection techniques are only implemented by large scale companies, and totally ignored by other companies which constitute the highest percentage of the active companies in the market now. Several causes are behind this and the result is one: More lives are put in danger due to lack of education, absence of audits and sanctions, and insufficient budgets
ContributorsMdawar, Hikmat (Author) / Gibson, George Edward (Thesis advisor) / El Asmar, Mounir (Committee member) / Sullivan, Kenneth (Committee member) / Arizona State University (Publisher)
Created2022