This dissertation presents a portable methodology for holistic planning and optimization of right of way infrastructure rehabilitation that was designed to generate monetary savings when compared to planning that only considers single infrastructure components. Holistic right of way infrastructure planning requires simultaneous consideration of the three right of way infrastructure

This dissertation presents a portable methodology for holistic planning and optimization of right of way infrastructure rehabilitation that was designed to generate monetary savings when compared to planning that only considers single infrastructure components. Holistic right of way infrastructure planning requires simultaneous consideration of the three right of way infrastructure components that are typically owned and operated under the same municipal umbrella: roads, sewer, and water. The traditional paradigm for the planning of right way asset management involves operating in silos where there is little collaboration amongst different utility departments in the planning of maintenance, rehabilitation, and renewal projects. By collaborating across utilities during the planning phase, savings can be achieved when collocated rehabilitation projects from different right of way infrastructure components are synchronized to occur at the same time. These savings are in the form of shared overhead and mobilization costs, and roadway projects providing open space for subsurface utilities. Individual component models and a holistic model that utilize evolutionary algorithms to optimize five year maintenance, rehabilitation, and renewal plans for the road, sewer, and water components were created and compared. The models were designed to be portable so that they could be used with any infrastructure condition rating, deterioration modeling, and criticality assessment systems that might already be in place with a municipality. The models attempt to minimize the overall component score, which is a function of the criticality and condition of the segments within each network, by prescribing asset management activities to different segments within a component network while subject to a constraining budget. The individual models were designed to represent the traditional decision making paradigm and were compared to the holistic model. In testing at three different budget levels, the holistic model outperformed the individual models in the ability to generate five year plans that optimized prescribed maintenance, rehabilitation and renewal for various segments in order to achieve the goal of improving the component score. The methodology also achieved the goal of being portable, in that it is compatible with any condition rating, deterioration, and criticality system.
ContributorsCarey, Brad David (Author) / Lueke, Jason S (Thesis advisor) / Ariaratnam, Samuel (Committee member) / Bashford, Howard (Committee member) / Arizona State University (Publisher)
Created2012
156897-Thumbnail Image.png
Description
The water and wastewater industry in the United States is in dire need of renovation due to dwindling infrastructure and requires substantial reinvestment. Design-bid-build (DBB) is the traditional method of project delivery most widely applied in this industry. However, alternative project delivery methods (APDM) are on the rise and touting

The water and wastewater industry in the United States is in dire need of renovation due to dwindling infrastructure and requires substantial reinvestment. Design-bid-build (DBB) is the traditional method of project delivery most widely applied in this industry. However, alternative project delivery methods (APDM) are on the rise and touting the benefits of reduced project schedule and cost. The main purpose of this study is to conduct a qualitative and quantitative performance evaluation to assess the current impact of APDM in the water and wastewater industry. A national survey was conducted targeting completed water and wastewater treatment plant projects. Responses were obtained from 75 utilities and constructors that either completed their projects using DBB, construction manager at risk (CMAR), or design-build (DB). Data analysis revealed that CMAR and DB statistically outperformed DBB in terms of project speed and intensity. Performance metrics such as cost growth, schedule growth, unit cost, factors influencing project delivery method selection, scope changes, warranty and latent defects, and several others are also evaluated. The main contribution of this study was that it was able to show that for the same project cost, water and wastewater treatment plants could be delivered under a faster schedule and with higher quality through the utilization of APDM.
ContributorsFeghaly, Jeffrey (Author) / El Asmar, Mounir (Thesis advisor) / Ariaratnam, Samuel (Thesis advisor) / Bearup, Wylie (Committee member) / Arizona State University (Publisher)
Created2018
133958-Thumbnail Image.png
Description
The 8.1 magnitude earthquake that struck Mexico City in 1985 left 10,000 people dead, and over 400 buildings collapsed. The extent of the damage left behind by this powerful quake has been extensively studied to make improvements to engineering and architectural practices in earthquake-prone areas of the world. Thirty-two years

The 8.1 magnitude earthquake that struck Mexico City in 1985 left 10,000 people dead, and over 400 buildings collapsed. The extent of the damage left behind by this powerful quake has been extensively studied to make improvements to engineering and architectural practices in earthquake-prone areas of the world. Thirty-two years later, on the exact anniversary of the devastating earthquake, Mexico City was once again jolted by a 7.1 magnitude earthquake. Although still significant, the 2017 earthquake collapsed only about a tenth of the buildings collapsed by the 1985 Earthquake, and in turn resulted in a lower death toll. Even though these earthquakes struck in the same seismic region, their effects were vastly different. This thesis completes a comparison between the two earthquakes focusing on the structural impacts including background on Mexico City's unique geology, basic concepts necessary to understand the response of structures to earthquake excitation, and structural failure modes observed in both earthquakes. The thesis will also discuss the earthquake's fundamental differences that led to the discrepancy in structural damage and ultimately in lower death tolls. Of those discussed, is the types of buildings that were targeted and collapsed. In 1985, buildings with 6 or more floors had the highest damage category. Resonance frequencies of these buildings were similar to the resonance frequencies of the subsoil, leading to amplified oscillations, and ultimately in failure. The 2017 earthquake did not have as much distance from the epicenter for the high frequency seismic waves to be absorbed. In contrast, the shorter, faster waves that reached the capital affected smaller buildings, and spared most tall buildings.
ContributorsGonzalez, Diana Laura (Author) / Hjelmstad, Keith (Thesis director) / Ward, Kristen (Committee member) / Civil, Environmental and Sustainable Engineering Program (Contributor) / Barrett, The Honors College (Contributor)
Created2018-05
133728-Thumbnail Image.png
Description
The loading provisions were compared between the ASCE 7-10 standard and ASCE 7-16 standard. Two different structural models were considered: an office building with a flat roof located in Tempe and a community center with a gable roof located in Flagstaff. The following load types were considered: dead, live, wind,

The loading provisions were compared between the ASCE 7-10 standard and ASCE 7-16 standard. Two different structural models were considered: an office building with a flat roof located in Tempe and a community center with a gable roof located in Flagstaff. The following load types were considered: dead, live, wind, and snow loads. The only major changes between the standards were found in the wind load calculations. The winds loads were reduced by approximately 22% for the office building in Tempe and 37% for the community center in Flagstaff. A structural design was completed for the frame of the Flagstaff community building. There was a 19% reduction in cost from the design using ASCE 7-10 provisions compared to the design utilizing ASCE 7-16 provisions, leading to a saving of $7,599.17. The reduction in loading, and subsequently more cost-effective design, is attributed to the reduction in basic wind speed for the region and consideration of the ground elevation factor. The introduction of the new ASCE 7-16 standard was met with criticism, especially over the increase in specific coefficients in the wind load and seismic load chapters. Proponents of ASCE 7-16 boast that the new chapter on tsunami loads, new maps for various environmental loads, and a new electronic hazard are some of the merits of the newest standard. Others still question whether the complexity of the provisions is necessary and call for further improvements for the wind and seismic provisions. While tension exists in the desire for a simple standard, ASCE 7-16 prioritizes in having its provisions provide economical and reliable results. More consideration could be devoted to developing a more convenient standard for users. Regardless, engineering professionals should be able to adapt alongside newly developed practices and newly discovered data.
ContributorsCajegas, Cyam Joshua Dato (Author) / Rajan, Subramaniam (Thesis director) / Neithalath, Narayanan (Committee member) / Civil, Environmental and Sustainable Engineering Program (Contributor) / Barrett, The Honors College (Contributor)
Created2018-05
134138-Thumbnail Image.png
Description
This thesis was prepared by Tyler Maynard and Hayley Monroe, who are students at Arizona State University studying to complete their B.S.E.s in Civil Engineering and Construction Engineering, respectively. Both students are members of Barrett, the Honors College, at Arizona State University, and have prepared the following document for the

This thesis was prepared by Tyler Maynard and Hayley Monroe, who are students at Arizona State University studying to complete their B.S.E.s in Civil Engineering and Construction Engineering, respectively. Both students are members of Barrett, the Honors College, at Arizona State University, and have prepared the following document for the purpose of completing their undergraduate honors thesis. The early sections of this document comprise a general, introductory overview of earthquakes and liquefaction as a phenomenon resulting from earthquakes. In the latter sections, this document analyzes the relationship between the furthest hypocentral distance to observed liquefaction and the earthquake magnitude published in 2006 by Wang, Wong, Dreger, and Manga. This research was conducted to gain a greater understanding of the factors influencing liquefaction and to compare the existing relationship between the maximum distance for liquefaction and earthquake magnitude to updated earthquake data compiled for the purpose of this report. As part of this research, 38 different earthquake events from the Geotechnical Extreme Events Reconnaissance (GEER) Association with liquefaction data were examined. Information regarding earthquake depth, distance to the furthest liquefaction event (epicentral and hypocentral), and earthquake magnitude (Mw) from recent earthquake events (1989 to 2016) was compared to the previously established relationship of liquefaction occurrence distance to moment magnitude. The purpose of this comparison was to determine if recent events still comply with the established relationship. From this comparison, it was determined that the established relationship still generally holds true for the large magnitude earthquakes (magnitude 7.5 or above) that were considered herein (with only 2.6% falling above the furthest expected liquefaction distance). However, this relationship may be too conservative for recent, low magnitude earthquake events; those events examined below magnitude 6.3 did not approach established range of furthest expected liquefaction distance. The overestimation of furthest hypocentral distance to liquefaction at low magnitudes suggest the empirical relationship may need to be adjusted to more accurately capture recent events, as reported by GEER.
ContributorsMonroe, Hayley (Co-author) / Maynard, Tyler (Co-author) / Kavazanjian, Edward (Thesis director) / Houston, Sandra (Committee member) / Civil, Environmental and Sustainable Engineering Program (Contributor) / Construction Engineering (Contributor) / Barrett, The Honors College (Contributor)
Created2017-12
133978-Thumbnail Image.png
Description
Arizona's transportation infrastructure is in need of an update. The American Society of Civil Engineers (ASCE) State Infrastructure 2017 Report Card scores Arizona's roads at a D+ and Arizona's bridges at a B. These grades are indicative that the serviceability levels of the roads and bridges are less than adequate.

Arizona's transportation infrastructure is in need of an update. The American Society of Civil Engineers (ASCE) State Infrastructure 2017 Report Card scores Arizona's roads at a D+ and Arizona's bridges at a B. These grades are indicative that the serviceability levels of the roads and bridges are less than adequate. These grades may seem tolerable in light of a national bridge C+ grade and a national road D grade, but the real problem lies in Arizona's existing funding gap that is in danger of exponentially increasing in the future. With an influx of vehicles on Arizona's roads and bridges, the cost of building, repairing, and maintaining them will grow and cause a problematic funding shortage. This report explores the current state of Arizona's roads and bridges as well as the policy and funding sources behind them, using statistics from the ASCE infrastructure report card and the Federal Highway Administration. Additionally, it discusses how regular, preventative maintenance for transportation infrastructure is the economically responsible choice for the state because it decreases delays and fuel expenses, prevents possible catastrophes, and increases human safety. To prioritize preventative transportation infrastructure maintenance, the common mentality that allows it to be sidelined for more newsworthy projects needs to be changed. Along with gaining preventative maintenance revenues through increasing vehicular taxes and fees, encouraging transportation policymakers and politicians to make economic decisions in favor of maintenance rather than waiting until failure is a reliable way to encourage regular, preventative maintenance.
ContributorsBurdett, Courtney (Author) / Hjelmstad, Keith (Thesis director) / Pendyala, Ram (Committee member) / Civil, Environmental and Sustainable Engineering Program (Contributor) / Barrett, The Honors College (Contributor)
Created2018-05
149457-Thumbnail Image.png
Description
Front End Planning (FEP) is a critical process for uncovering project unknowns, while developing adequate scope definition following a structured approach for the project execution process. FEP for infrastructure projects assists in identifying and mitigating issues such as right-of-way concerns, utility adjustments, environmental hazards, logistic problems, and permitting requirements. This

Front End Planning (FEP) is a critical process for uncovering project unknowns, while developing adequate scope definition following a structured approach for the project execution process. FEP for infrastructure projects assists in identifying and mitigating issues such as right-of-way concerns, utility adjustments, environmental hazards, logistic problems, and permitting requirements. This thesis describes a novel and effective risk management tool that has been developed by the Construction Industry Institute (CII) called the Project Definition Rating Index (PDRI) for infrastructure projects. Input from industry professionals from over 30 companies was used in the tool development which is specifically focused on FEP. Data from actual projects are given showing the efficacy of the tool. Critical success factors for FEP of infrastructure projects are shared. The research shows that a finite and specific list of issues related to scope definition of infrastructure projects can be developed. The thesis also concludes that the PDRI score indicates the current level of scope definition and corresponds to project performance. Infrastructure projects with low PDRI scores outperform projects with high PDRI scores.
ContributorsBingham, Evan Dale (Author) / Gibson Jr., G. Edward (Thesis advisor) / Badger, William (Committee member) / Ariaratnam, Samuel (Committee member) / Arizona State University (Publisher)
Created2010
187709-Thumbnail Image.png
Description
During the rapid growth of infrastructure projects globally, countries pay high environmental and social costs as a result of the impacts caused from utilizing the traditional open-cut utility installation method that still widely being used in Egypt. For that, it was essential to have alternatives to reduce these environmental impacts

During the rapid growth of infrastructure projects globally, countries pay high environmental and social costs as a result of the impacts caused from utilizing the traditional open-cut utility installation method that still widely being used in Egypt. For that, it was essential to have alternatives to reduce these environmental impacts and social costs; however, there are some obstacles that prevent the implementation and the realization of these alternatives.This research is conducted mainly to evaluate the environmental impacts of open-cut excavation vs. trenchless technology in Egypt, through two main methodologies. Firstly, a field survey that aims to measure knowledge of people working in the Egyptian construction industry of trenchless technology, and the harms caused from keeping utilizing open-cut for installing all kinds of underground utilities. In addition to investigating the reasons behind not relying on trenchless technology as a safe alternative for open-cut in Egypt. Furthermore, in order to compare the greenhouse gases emissions resulted from both open-cut vs trenchless technology, a real case study is applied quantifying the amounts of the resulted greenhouse gases from each method. The results show that greenhouse gases emissions generated from open-cut were extremely higher than that of horizontal directional drilling as a trenchless installation method.
ContributorsKhedr, Ahmed Mossad Saeed Hafez (Author) / Ariaratnam, Samuel (Thesis advisor) / El Asmar, Mounir (Committee member) / Chong, Oswald (Committee member) / Arizona State University (Publisher)
Created2023
168362-Thumbnail Image.png
Description
The fact that the lean construction approach, a project-based production management approach, is considered as a best practice in the construction industry and a key solution to alleviate the implications of various forms of waste on the construction projects performance in general, and the Lebanese ones in particular, motivates the

The fact that the lean construction approach, a project-based production management approach, is considered as a best practice in the construction industry and a key solution to alleviate the implications of various forms of waste on the construction projects performance in general, and the Lebanese ones in particular, motivates the author to conduct a study to evaluate it as a strategic option. For that to happen, a bibliographic analysis has been developed to serve the key project objective. The bibliographic analysis is expected to help construction professionals to deepen their knowledge in Lean philosophy and its applications in the construction industry. After developing a solid background of understanding of Lean Construction, a survey to collect information from construction companies within the Lebanese territory has been conducted, followed by analysis and interpretations of the findings to examine lean construction inside the Lebanese construction Industry; that has been achieved in terms of understanding and analyzing the suitability, acceptability, and applicability of lean construction principles, tools, and techniques by Lebanese construction firms. Performed Revision has been crowned with a detailed explanation of the lean construction approach accompanied with an applicable lean construction implementation guideline. Besides that, survey results showed a wide acceptance of most lean construction principles (namely, waste elimination and continuous improvement) by Lebanese construction professionals. It has been shown as well, that lean construction tools and techniques are applied by a major portion of the Lebanese construction firms due to the significant impact these tools and techniques have on the project quality, schedule, and cost. However, all analyzed results confirm one main conclusion, that a significant portion of the Lebanese construction industry lack that adequate knowledge and understanding of lean construction philosophy, which necessitates the development of “Lean Construction Education Programs” as a principal enabler for successful lean construction adoption. This paper has been developed mainly to guide Lebanese construction professionals, especially project and construction managers, towards understanding and adopting lean construction as a mean to deliver projects of value and to inform Lebanese construction industry leaders about the current state of lean construction inside the Lebanese construction Industry.
ContributorsMetlej, Kamal (Author) / Grau Torrent, David (Thesis advisor) / Ariaratnam, Samuel (Committee member) / Czerniawski, Thomas (Committee member) / Arizona State University (Publisher)
Created2021
168450-Thumbnail Image.png
Description
As the construction industry in Saudi Arabia was on its way to thriving again. Their growth was due to the unprecedented volume of planned projects such as large-scale and unique projects. Suddenly, the world was faced with one of the most disrupting events in the last century which had a

As the construction industry in Saudi Arabia was on its way to thriving again. Their growth was due to the unprecedented volume of planned projects such as large-scale and unique projects. Suddenly, the world was faced with one of the most disrupting events in the last century which had a devastating impact on the construction industry specifically. This paper explores mainly the impact of the COVID-19 pandemic on construction projects in Saudi Arabia. Particularly, this paper explores how the pandemic and its related events contributed to the projects' schedule disturbances. This is because most of the projects rely on manpower and supply chains which were heavily disrupted due to the protective measures. For that, a study was conducted to evaluate the impact on the construction projects in Saudi Arabia, to what extent the schedule projects were affected, and what were the main reasons for the schedule delays. The research relied on a field survey and schedule analysis for 12 projects which resulted in identifying several causes of delays and the delayed durations that the projects in Saudi Arabia were facing. This research allows those in construction fields to identify the main causes of delays in order to avoid or minimize the impact of these issues on future projects.
ContributorsObeid, Muhammad Hasan Hani (Author) / Ariaratnam, Samuel (Thesis advisor) / El Asmar, Mounir (Committee member) / Chong, Oswald (Committee member) / Arizona State University (Publisher)
Created2021