Matching Items (26)
Filtering by

Clear all filters

151681-Thumbnail Image.png
Description
Using experience, observations, data, current research, and writings in the field of volunteer management, it was determined there was a need to study the effects of leadership/management practices on the productivity outcomes of a volunteer construction workforce. A simple wood bench that would be tiled and painted was designed to

Using experience, observations, data, current research, and writings in the field of volunteer management, it was determined there was a need to study the effects of leadership/management practices on the productivity outcomes of a volunteer construction workforce. A simple wood bench that would be tiled and painted was designed to test the areas of Time, Waste, Quality, Safety, and Satisfaction of different volunteer groups. The challenge was bolstered by giving the teams no power tools and limited available resources. A simple design of experiment model was used to test highs and lows in the three management techniques of Instruction, Help, and Encouragement. Each scenario was tested multiple times. Data was collected, normalized and analyzed using statistical analysis software. A few significant findings were discovered. The first; the research showed that there was no significant correlation between the management practices of the leader and the satisfaction of the volunteers. The second; the research also showed when further analyzed into specific realistic scenarios that the organizations would be better to focus on high amounts of Help and Encouragement in order to maximize the productivity of their volunteer construction workforce. This is significant as it allows NPO's and governments to focus their attention where best suited to produce results. The results were shared and the study was further validated as "significant" by conducting interviews with experts in the construction nonprofit sector.
ContributorsPrigge, Diedrich (Author) / Sullivan, Kenneth (Thesis advisor) / Wiezel, Avi (Committee member) / Badger, William (Committee member) / Arizona State University (Publisher)
Created2013
152178-Thumbnail Image.png
Description
The construction industry in India suffers from major time and cost overruns. Data from government and industry reports suggest that projects suffer from 20 to 25 percent time and cost overruns. Waste of resources has been identified as a major source of inefficiency. Despite a substantial increase in the past

The construction industry in India suffers from major time and cost overruns. Data from government and industry reports suggest that projects suffer from 20 to 25 percent time and cost overruns. Waste of resources has been identified as a major source of inefficiency. Despite a substantial increase in the past few years, demand for professionals and contractors still exceeds supply by a large margin. The traditional methods adopted in the Indian construction industry may not suffice the needs of this dynamic environment, as they have produced large inefficiencies. Innovative ways of procurement and project management can satisfy the needs aspired to as well as bring added value. The problems faced by the Indian construction industry are very similar to those faced by other developing countries. The objective of this paper is to discuss and analyze the economic concerns, inefficiencies and investigate a model that both explains the Indian construction industry structure and provides a framework to improve efficiencies. The Best Value (BV) model is examined as an approach to be adopted in lieu of the traditional approach. This could result in efficient construction projects by minimizing cost overruns and delays, which until now have been a rarity.
ContributorsNihas, Syed (Author) / Kashiwagi, Dean (Thesis advisor) / Sullivan, Kenneth (Committee member) / Kashiwagi, Jacob (Committee member) / Arizona State University (Publisher)
Created2013
150133-Thumbnail Image.png
Description
ABSTRACT Facility managers have an important job in today's competitive business world by caring for the backbone of the corporation's capital. Maintaining assets and the support efforts cause facility managers to fight an uphill battle to prove the worth of their organizations. This thesis will discuss the important and flexible

ABSTRACT Facility managers have an important job in today's competitive business world by caring for the backbone of the corporation's capital. Maintaining assets and the support efforts cause facility managers to fight an uphill battle to prove the worth of their organizations. This thesis will discuss the important and flexible use of measurement and leadership reports and the benefits of justifying the work required to maintain or upgrade a facility. The task is streamlined by invoking accountability to subject experts. The facility manager must trust in the ability of his or her work force to get the job done. However, with accountability comes increased risk. Even though accountability may not alleviate total control or cease reactionary actions, facility managers can develop key leadership based reports to reassign accountability and measure subject matter experts while simultaneously reducing reactionary actions leading to increased cost. Identifying and reassigning risk that are not controlled to subject matter experts is imperative for effective facility management leadership and allows facility managers to create an accurate and solid facility management plan, supports the organization's succession plan, and allows the organization to focus on key competencies.
ContributorsTellefsen, Thor (Author) / Sullivan, Kenneth (Thesis advisor) / Kashiwagi, Dean (Committee member) / Badger, William (Committee member) / Arizona State University (Publisher)
Created2011
150449-Thumbnail Image.png
Description
Current information on successful leadership and management practices is contradictory and inconsistent, which makes difficult to understand what successful business practices are and what are not. The purpose of this study is to identify a simple process that quickly and logically identifies consistent and inconsistent leadership and management criteria. The

Current information on successful leadership and management practices is contradictory and inconsistent, which makes difficult to understand what successful business practices are and what are not. The purpose of this study is to identify a simple process that quickly and logically identifies consistent and inconsistent leadership and management criteria. The hypothesis proposed is that Information Measurement Theory (IMT) along with the Kashiwagi Solution Model (KSM) is a methodology than can differentiate between accurate and inaccurate principles the initial part of the study about authors in these areas show how information is conflictive, and also served to establish an initial baseline of recommended practices aligned with IMT. The one author that excels in comparison to the rest suits the "Initial Baseline Matrix from Deming" which composes the first model. The second model is denominated the "Full Extended KSM-Matrix" composed of all the LS characteristics found among all authors and IMT. Both models were tested-out for accuracy. The second part of the study was directed to evaluate the perception of individuals on these principles. Two different groups were evaluated, one group of people that had prior training and knowledge of IMT; another group of people without any knowledge of IMT. The results of the survey showed more confusion in the group of people without knowledge to IMT and improved consistency and less variation in the group of people with knowledge in IMT. The third part of the study, the analysis of case studies of success and failure, identified principles as contributors, and categorized them into LS/type "A" characteristics and RS/type "C" characteristics, by applying the KSM. The results validated the initial proposal and led to the conclusion that practices that fall into the LS side of the KSM will lead to success, while practices that fall into the RS of the KSM will lead to failure. The comparison and testing of both models indicated a dominant support of the IMT concepts as contributors to success; while the KSM model has a higher accuracy of prediction.
ContributorsReynolds, Harry (Author) / Kashiwagi, Dean (Thesis advisor) / Sullivan, Kenneth (Committee member) / Badger, William (Committee member) / Arizona State University (Publisher)
Created2011
151237-Thumbnail Image.png
Description
This dissertation examines an analytical methodology that considers predictive maintenance on industrial facilities equipment to exceed world class availability standards with greater understanding for organizational participation impacts. The research for this study was performed at one of the world's largest semiconductor facilities, with the intent of understanding one possible cause

This dissertation examines an analytical methodology that considers predictive maintenance on industrial facilities equipment to exceed world class availability standards with greater understanding for organizational participation impacts. The research for this study was performed at one of the world's largest semiconductor facilities, with the intent of understanding one possible cause for a noticeable behavior in technical work routines. Semiconductor manufacturing disruption poses significant potential revenue loss on a scale easily quantified in millions of dollars per hour. These instances are commonly referred to as "Interruption to production" (ITP). ITP is a standardized metric used across Company ABC's worldwide factory network to track frequency of occurrence and duration of manufacturing downtime. ITP, the key quantifiable indicator in this dissertation, will be the primary analytical measurement to identify the effectiveness of maintenance personnel's work routines as they relate to unscheduled downtime with facilities systems. This dissertation examines the process used to obtain change in an industrial facilities organization and the associated reactions of individual organizational members. To give the reader background orientation on the methodology for testing, measuring and ultimately assessing the benefits and risks associated with integrating a predictive equipment failure methodology, this dissertation will examine analytical findings associated with the statement of purpose as it pertains to ITP reduction. However, the focus will be the exploration of behavioral findings within the organization and the development of an improved industry standard for predictive ITP reduction process implementation. Specifically, findings associated with organizational participation and learning development trends found within the work group.
ContributorsMcDonald, Douglas Kirk (Author) / Sullivan, Kenneth (Thesis advisor) / Badger, William (Committee member) / Verdini, William (Committee member) / Arizona State University (Publisher)
Created2012
154179-Thumbnail Image.png
Description
In today's era a lot of the construction projects suffer from time delay, cost overrun and quality defect. Incentive provisions are found to be a contracting strategy to address this potential problem. During last decade incentive mechanisms have gained importance, and they are starting to become adopted in the construction

In today's era a lot of the construction projects suffer from time delay, cost overrun and quality defect. Incentive provisions are found to be a contracting strategy to address this potential problem. During last decade incentive mechanisms have gained importance, and they are starting to become adopted in the construction projects. Most of the previous research done in this area was purely qualitative, with a few quantitative studies. This study aims to quantify the performance of incentives in construction by collecting the data from more than 30 projects in United States through a questionnaire survey. First, literature review addresses the previous research work related to incentive types, incentives in construction industry, incentives in other industry and benefits of incentives. Second, the collected data is analyzed with statistical methods to test the significance of observed changes between two data sets i.e. incentive projects and non-incentive projects. Finally, the analysis results provide evidence for the significant impact of having incentives; reduced the cost and schedule growth in construction projects in United States.
ContributorsPaladugu, Bala Sai Krishna (Author) / El Asmar, Mounir (Thesis advisor) / Ernzen, James (Committee member) / Sullivan, Kenneth (Committee member) / Arizona State University (Publisher)
Created2015
156379-Thumbnail Image.png
Description
Recent studies have identified that contractors in the Saudi construction industry are not the main party that cause risks as owners and other parties have the major share of causing risks. However, with the identification that risks out of contractors’ control are a leading cause of low performance, there is

Recent studies have identified that contractors in the Saudi construction industry are not the main party that cause risks as owners and other parties have the major share of causing risks. However, with the identification that risks out of contractors’ control are a leading cause of low performance, there is a lack of efficient risk mitigation practices in Saudi to manage these risks. The main aim of this dissertation is to assess the current practices applied by contractors to minimize risk out of their control and develop a risk mitigation model to manage these risks. The main objectives of the study are: investigating the risks that are out of contractors’ control, assessing the contractors’ current risk mitigation and performance measurement practices, and finally developing and validating a risk mitigation model to minimize risks out of contractors’ control and measure performance of involved project parties. To achieve the study aim, a mixed methodological approach was adopted. Theoretical approaches were utilized to review previous research and to develop a conceptual risk mitigation framework followed by a practical approach that is considered with collecting data from contractors. The quantitative method was mainly used to meet the study objectives through distributing a survey in the form of a questionnaire. As a consolidation of the study findings, the top ranked risks that are out of contractors’ control were identified. Furthermore, the results identified that the contractors’ current risk management and performance measurement practices are not effective in minimizing projects risks caused by other parties and ineffective in measuring performance of all parties. The developed model focuses on increasing accountability of project parties through mitigating project parties’ activities and risks with measuring the deviations and identifying sources of deviations. Transparency is utilized in the model through sharing weekly updates of the activities and risks combined with updated information of performance measurements of all project parties. The study results showed that project risks can be minimized and projects’ performance can be increased if contractors shift their focus using the developed model from only managing their own activities and risks to managing all project parties’ activities and risks.
ContributorsAlgahtany, Mohammed (Author) / Sullivan, Kenneth (Thesis advisor) / Kashiwagi, Dean (Committee member) / Badger, William (Committee member) / Arizona State University (Publisher)
Created2018
156035-Thumbnail Image.png
Description
The construction industry is performing poorly regarding project management and service delivery. On average, global projects are over-budget, delayed, and met with unsatisfactory results according to buyers. To mitigate poor performance, the project management career path has been heavily researched and continually developed over the last century. Despite the published

The construction industry is performing poorly regarding project management and service delivery. On average, global projects are over-budget, delayed, and met with unsatisfactory results according to buyers. To mitigate poor performance, the project management career path has been heavily researched and continually developed over the last century. Despite the published advances in project management approaches and tools, project performance continues to suffer. This research seeks to conduct an exploratory analysis of current project management and other approaches and determine how they affect project performance. Through a detailed literature search, the researcher identified a procurement model that is more heavily documented as high performing than all other approaches. The researcher proposed that this model may be a solution to assist project managers with the delivery of high performing services. The model is called the Best Value Approach (BVA). The BVA focuses on leadership, non-technical communication, quality assurance, and transparent project execution. To test the effectiveness of its practices, the researcher modified and adapted the BVA into a project management approach and tested it on a large-scale government project. During the case study test, the researcher observed that there were two primary project management roles in the supply chain; the buyer’s and vendor’s project managers. The case study resulted in the large government organization receiving more work and increased their satisfaction of the work received by 22 percent from the previous year. To further test the project management adapted BVA, the researcher conducted a classroom case-study in which students learned and implemented the BVA practices on real-time, small-scale industry projects. Results include cost savings of $100,000 for 10 companies over 24 projects, cost avoidance of over $4.5M, and a 9.8/10 customer satisfaction [in terms of the companies’ satisfaction with the deliverables produced on each project]. These results suggest that the BVA practices may effectively improve the performance of project delivery, and may be a viable new project management approach to train future project managers. Out of the two project manager roles, it is proposed that the buyer’s project manager may receive the most benefit. Additional research is needed on the other approaches to compare quantitative project performance, and run repeated testing on the potential new project management approach.
ContributorsRivera, Alfredo Octavio (Author) / Badger, William (Thesis advisor) / Sullivan, Kenneth (Thesis advisor) / Kashiwagi, Jacob S (Committee member) / Arizona State University (Publisher)
Created2017
157381-Thumbnail Image.png
Description近20年,中国品牌零售业的快速发展使其成为全球第三大零售市场。消费者的需求量在大幅增长,对于本土企业来说,机遇与挑战并存。

对于连锁型品牌零售企业,员工是其产品和服务的载体。而如何做好不同层次的人员的激励体系,并得以踏实的落实和执行,是企业经营中非常关键的环节,也是品牌零售企业在竞争中获取优势的根本保证。另外,由于连锁零售企业基层员工流动性大、总体素质较低,如何对这部分员工实施有效的绩效考核,成为很多连锁零售企业管理人员面临的一个难题。

本文将长期和短期激励作为主要的研究内容。从整体国内企业来看,运转良好的绩效考评体系并不多,大部分企业的绩效考评体系只注重短期激励而忽视了长期激励的作用,绩效考评关注的是目标的实现,与员工的发展相脱节。因此,如何做好品牌企业的激励体系,如何在人才竞争中取得先机,并最大化企业利润,是本文研究的重心。

目前的研究空白在于对连锁型店铺的激励绩效。而考虑到品牌零售中的连锁经营往往涉及到成百上千家门店,涉及到的从业人数较多,因而对门店的激励绩效的成败是关系到企业整体激励绩效好坏的关键。

本文对激励绩效方案的相关理论进行回顾、分析与总结,从委托代理理论、激励理论、交易成本理论和产权理论入手,分析连锁型品牌零售企业的激励绩效特点。连锁型品牌零售企业合伙制本质上与特许经营精神及设计理念一致,而想要改进的正是特许经营中加盟店与总部的博弈与消耗,形成利益共同体,达到企业价值最大化的目标。

通过连锁型品牌零售企业绩效激励的真实案例(永辉超市合伙人制度、拉夏贝尔店铺合伙人制度、康奈零投入型与交股金型两种店铺合伙人制度)分析得出风险共担、超额利润分成的合伙人制度在连锁型品牌零售企业激励绩效方案设计中的可行性及意义,并从中发现了已有实践存在的问题,并提出建议。

店铺合伙人制度激励店长、提高单店销售业绩、减少交易成本、提高管理效率的正向作用毋庸置疑,建议在实践中积极推行与完善。
ContributorsZheng, Laili (Author) / Pei, Ker-Wi (Thesis advisor) / Chen, Xinlei (Committee member) / Zhu, Hongquan (Committee member) / Arizona State University (Publisher)
Created2019
156781-Thumbnail Image.png
Description最近几十年对高管人员个人特征的研究成为组织战略决策领域的重要议题,但其中对

于高管人员的心理感受却几乎从未触及。心理学研究表明,心理感受会很大程度上影响人

的行为。荣耀感,作为最主要的一种与自我意识相关的心理感受,对于工作行为和结果的

影响都非常大。因而,研究企业高管的荣耀感,对理解和预测他们的行为,进而对预测其

个人意志扮演重要角色的公司战略决策有显著意义。

本论文对企业高管的荣耀感进行了系统研究。通过两个研究,中国企业高管的问卷

调查数据,回答了两个问题:1. 企业高管工作荣耀感的内涵是什么?2. 企业高管荣耀感

的高低如何影响其在公司中的战略决策。具体而言,通过 6 人深度访谈和 50 人的开放式

问题问卷的定性研究提炼了企业高管荣耀感的双维度模型,即世俗荣耀感和神圣荣耀感,

202 名企业高管样本的问卷开发了信度和效度达标的两种荣耀感的测量量表(研究一);

运用 159 名企业高管的问卷数据(研究二)检验了有关两种荣耀感影响公司战略变革意愿

和行为,以及社会创新的不同作用及其边界条件的理论模型和假设。

本研究的主要结论是:

1. 企业高管的世俗荣耀感和神圣荣耀感均正向影响企业战略主动性、战略变革,以

及社会创新战略,其中神圣荣耀感相比世俗荣耀感,对于公司社会创新战略的影响效应更

大;2.企业高管神圣的荣耀感,相比世俗荣耀刚对公司战略主动性的积极作用,受到其感

知到的基于政策环境变化的心理契约违背的影响更大,而世俗的荣耀感,相比神圣荣耀感

对公司社会创新的正向作用,受到其感知到的基于政策环境变化的心理契约违背的影响更

大。

本论文对战略领导力的研究做出了重要贡献。战略管理研究越来越多地关注人的因

素,尤其是企业高管对企业决策、行为以及绩效的影响,但以往对高阶的研究都集中在对

高管人员认知、背景及经验的探讨,本论文首次聚焦于高管人员的情感体验,通过强调高

管人员的荣耀感对组织战略决策的重要性,本研究大大地扩展了战略领导的研究范畴。

论文从心理学的视角出发,首次从内容和来源视角区分荣耀感的两种类型,对原先

从表现形式(momentary experiences and chronic dispositional tendencies)对荣耀感的

分类是个补充,对心理学领域有关荣耀感的研究做出了贡献。本文创造性地将荣耀感的研

究扩展到了企业管理中的高级管理人员,显著地提高了有关个体荣耀感受的理论与管理学

领域理论和实践运用的相关性。
ContributorsZhou, Jun (Author) / Tsui, Anne (Thesis advisor) / Zhu, Hongquan (Thesis advisor) / Qian, Jun (Committee member) / Arizona State University (Publisher)
Created2018