Matching Items (2)
Filtering by

Clear all filters

153400-Thumbnail Image.png
Description
Economic and environmental concerns necessitate the preference for retrofits over new construction in manufacturing facilities for incorporating modern technology, expanding production, becoming more energy-efficient and improving operational efficiency. Despite the technical and functional challenges in retrofits, the expectation from the project team is to; reduce costs, ensure the time to

Economic and environmental concerns necessitate the preference for retrofits over new construction in manufacturing facilities for incorporating modern technology, expanding production, becoming more energy-efficient and improving operational efficiency. Despite the technical and functional challenges in retrofits, the expectation from the project team is to; reduce costs, ensure the time to market and maintain a high standard for quality and safety. Thus, the construction supply chain faces increasing pressure to improve performance by ensuring better labor productivity, among other factors, for efficiency gain. Building Information Modeling (BIM) & off-site prefabrication are determined as effective management & production methods to meet these goals. However, there are limited studies assessing their impact on labor productivity within the constraints of a retrofit environment. This study fills the gap by exploring the impact of BIM on labor productivity (metric) in retrofits (context).

BIM use for process tool installation at a semiconductor manufacturing facility serves as an ideal environment for practical observations. Direct site observations indicate a positive correlation between disruptions in the workflow attributed to an immature use of BIM, waste due to rework and high non-value added time at the labor work face. Root-cause analysis traces the origins of the said disruptions to decision-factors that are critical for the planning, management and implementation of BIM. Analysis shows that stakeholders involved in decision-making during BIM planning, management and implementation identify BIM-value based on their immediate utility for BIM-use instead of the utility for the customers of the process. This differing value-system manifests in the form of unreliable and inaccurate information at the labor work face.

Grounding the analysis in theory and observations, the author hypothesizes that stakeholders of a construction project value BIM and BIM-aspects (i.e. geometrical information, descriptive information and workflows) differently and the accuracy of geometrical information is critical for improving labor productivity when using prefabrication in retrofit construction. In conclusion, this research presents a BIM-value framework, associating stakeholders with their relative value for BIM, the decision-factors for the planning, management and implementation of BIM and the potential impact of those decisions on labor productivity.
ContributorsGhosh, Arundhati (Author) / Chasey, Allan D (Thesis advisor) / Laroche, Dominique-Claude (Committee member) / Fowler, John (Committee member) / Arizona State University (Publisher)
Created2015
155645-Thumbnail Image.png
Description
This research focuses on assessing the impact of various process mapping activities aimed at improving students' abilities to plan for Building Information Modeling (BIM). During the various educational activities, students were tasked with generating process maps to illustrate plans for hypothetical construction projects. Several different educational approaches for developing process

This research focuses on assessing the impact of various process mapping activities aimed at improving students' abilities to plan for Building Information Modeling (BIM). During the various educational activities, students were tasked with generating process maps to illustrate plans for hypothetical construction projects. Several different educational approaches for developing process maps were used, beginning in the Fall 2015 semester. In all iterations of the learning activity, students were asked to create level 1 (project-specific) and level 2 (BIM use-specific) process maps based on a previously published BIM Project Execution Planning Guide. In Fall 2015, a peer review activity was conducted. In Spring 2016, a collaborative activity was conducted. Beginning in the Fall 2016 and Spring 2017 semesters, an additional process mapping activity was conducted aimed at separating process mapping and BIM planning into separate activities. In Fall 2016, the BIM activity was conducted in groups of three whereas in Spring 2017, the students were asked to create individual process maps for the given BIM use. To understand the impact of the activity on students' perception of their own knowledge, a pre-and post-activity questionnaire was developed. It covered questions related to: (i) students' ability to create a process map, (ii) students' perception about the importance of a process map and (iii) students' perception about their own knowledge of the BIM execution process. The process maps were analyzed using a grading rubric developed by the author. The grading rubric is the major contribution of the work as there is no existing rubric to assess a BIM process map. The grading rubric divides each process map into five sections, including: core activity; activities preceding the core activity; activities following the core activity; loop/iteration; and communication across the swim lanes. The rubric consist of two parts that evaluate (i) the ability of students to demonstrate each section and (ii) the quality of demonstration of each section. The author conducted an inter-rater reliability index to validate the rubric. This inter-rater reliability index compares the scores students’ process maps were when assessed by graduate students, faculty, and industry practitioners. The reviewers graded the same set of twelve process maps. The inter-rater reliability index was found to be 0.21, which indicates a fair agreement between the graders. The non-BIM activity approach was perceived as the most impactful approach by the students. The assessment of the process maps with the rubric indicated that the non-BIM approach was the most impactful approach for enabling students to demonstrate their ability to create a process map.
ContributorsPerikamana, Aparna (Author) / Ayer, Steven K (Thesis advisor) / Chasey, Allan D (Committee member) / Parrish, Kristen D (Committee member) / Arizona State University (Publisher)
Created2017