Matching Items (7)
Filtering by

Clear all filters

149708-Thumbnail Image.png
Description
Semiconductor manufacturing facilities are very complex and capital intensive in nature. During the lifecycle of these facilities various disciplines come together, generate and use a tremendous amount of building and process information to support various decisions that enable them to successfully design, build and sustain these advanced facilities. However, a

Semiconductor manufacturing facilities are very complex and capital intensive in nature. During the lifecycle of these facilities various disciplines come together, generate and use a tremendous amount of building and process information to support various decisions that enable them to successfully design, build and sustain these advanced facilities. However, a majority of the information generated and processes taking place are neither integrated nor interoperable and result in a high degree of redundancy. The objective of this thesis is to build an interoperable Building Information Model (BIM) for the Base-Build and Tool Installation in a semiconductor manufacturing facility. It examines existing processes and data exchange standards available to facilitate the implementation of BIM and provides a framework for the development of processes and standards that can help in building an intelligent information model for a semiconductor manufacturing facility. To understand the nature of the flow of information between the various stakeholders the flow of information between the facility designer, process tool manufacturer and tool layout designer is examined. An information model for the base build and process tool is built and the industry standards SEMI E6 and SEMI E51 are used as a basis to model the information. It is found that applications used to create information models support interoperable industry standard formats such as the Industry Foundation Classes (IFC) and ISO 15926 in a limited manner. A gap analysis has revealed that interoperability standards applicable to the semiconductor manufacturing industry such as the IFC and ISO15926 need to be expanded to support information transfers unique to the industry. Information modeling for a semiconductor manufacturing facility is unique in that it is a process model (Process Tool Information Model) within a building model (Building Information Model), each of them supported more robustly by different interoperability standards. Applications support interoperability data standards specific to the domain or industry they serve but information transfers need to occur between the various domains. To facilitate flow of information between the different domains it is recommended that a mapping of the industry standards be undertaken and translators between them be developed for business use.
ContributorsPindukuri, Shruthi (Author) / Chasey, Allan D (Thesis advisor) / Wiezel, Avi (Committee member) / Mamlouk, Michael (Committee member) / Arizona State University (Publisher)
Created2011
134597-Thumbnail Image.png
Description
Hospitals constitute 9 percent of commercial energy consumption in the U.S. annually, though they only make up 2 percent of the U.S. commercial floor space. Consuming an average of 259,000 Btu per square foot, U.S. hospitals spend about 8.3 billion dollars on energy every year. Utilizing collaborative delivery method for

Hospitals constitute 9 percent of commercial energy consumption in the U.S. annually, though they only make up 2 percent of the U.S. commercial floor space. Consuming an average of 259,000 Btu per square foot, U.S. hospitals spend about 8.3 billion dollars on energy every year. Utilizing collaborative delivery method for hospital construction can effectively save healthcare business owners thousands of dollars while reducing construction time and resulting in a better product: a building that has fewer operational deficiencies and requires less maintenance. Healthcare systems are integrated by nature, and are rich in technical complexity to meet the needs of their various patients. In addition to being technologically and energy intensive, hospitals must meet health regulations while maintaining human comfort. The interdisciplinary nature of hospitals suggests that multiple perspectives would be valuable in optimizing the building design. Integrated project delivery provides a means to reaching the optimal design by emphasizing group collaboration and expertise of the architect, engineer, owner, builder, and hospital staff. In previous studies, IPD has proven to be particularly beneficial when it comes to highly complex projects, such as hospitals. To assess the effects of a high level of team collaboration in the delivery of a hospital, case studies were prepared on several hospitals that have been built in the past decade. The case studies each utilized some form of a collaborative delivery method, and each were successful in saving and/or redirecting time and money to other building components, achieving various certifications, recognitions, and awards, and satisfying the client. The purpose of this research is to determine key strategies in the construction of healthcare facilities that allow for quicker construction, greater monetary savings, and improved operational efficiency. This research aims to communicate the value of both "green building" and a high level of team collaboration in the hospital-building process.
ContributorsHansen, Hannah Elizabeth (Author) / Parrish, Kristen (Thesis director) / Bryan, Harvey (Committee member) / Civil, Environmental and Sustainable Engineering Programs (Contributor) / Barrett, The Honors College (Contributor)
Created2017-05
155142-Thumbnail Image.png
Description
ABSTRACT

This study examines the methodology for converting protected, permissive, and protected/permissive left-turn operation to flashing yellow arrow left-turn operation. This study addresses construction-related considerations, including negative offsets, lateral traffic signal head position, left-turn accident rates, crash modification factors and crash reductions factors. A total of 85 intersections in Glendale, Arizona

ABSTRACT

This study examines the methodology for converting protected, permissive, and protected/permissive left-turn operation to flashing yellow arrow left-turn operation. This study addresses construction-related considerations, including negative offsets, lateral traffic signal head position, left-turn accident rates, crash modification factors and crash reductions factors. A total of 85 intersections in Glendale, Arizona were chosen for this study. These intersections included 45 “arterial to arterial” intersections (a major road intersecting with a major road) and 40 “arterial to collector” intersections (a major road intersecting with a minor road).

This thesis is a clinical study of the field conversion to flashing yellow arrow traffic signals and is not a study of the merits of flashing yellow arrow operation. This study included six categories: 1. High accident intersections (for inclusion in Highway Safety Improvement Program (HSIP) funding); 2. Signal head modifications only; 3. Signal head replacement with median modifications; 4. Signal head and mast arm replacement; 5. Signal head, signal pole and mast arm replacement; and 6. Intersections where flashing yellow arrow operation is not recommended. Compliance with the Manual on Uniform Traffic Control Devices (MUTCD) played a large part in determining conversion costs because the standard for lateral position of the left-turn traffic signal greatly influenced the construction effort. Additionally, the left-turning vehicle’s sight distance factored into cost considerations. It’s important for agencies to utilize this study to understand all of the financial commitments and construction requirements for conversion to flashing yellow arrow operation, and ultimately to appreciate that the process is not purely a matter of swapping traffic signal heads.
ContributorsChambers, Susan Elizabeth (Author) / Kaloush, Kamil (Thesis advisor) / Mamlouk, Michael (Thesis advisor) / Hartig, Daniel (Committee member) / Lou, Yingyan (Committee member) / Arizona State University (Publisher)
Created2016
171763-Thumbnail Image.png
Description
Construction project teams expend substantial effort to develop scope definition during the front end planning phase of building projects but oftentimes neglect to sufficiently plan for the complexities of tribal building projects. A needs assessment conducted by the author comprising interviews with practitioners familiar with construction on tribal lands revealed

Construction project teams expend substantial effort to develop scope definition during the front end planning phase of building projects but oftentimes neglect to sufficiently plan for the complexities of tribal building projects. A needs assessment conducted by the author comprising interviews with practitioners familiar with construction on tribal lands revealed the need for a front end planning (FEP) process to assess scope definition of capital projects on tribal lands. This dissertation summarizes the motivations and efforts to develop a front end planning tool for tribal building projects, the Project Definition Rating Index (PDRI) for Tribal Building Projects. The author convened a research team to review, analyze, and adapt an existing building-projects-focused FEP tool, the PDRI – Building Projects, and other resources to develop a set of 67 specific elements relevant to the planning of tribal building projects. The author supported the facilitation of seven workshops in which 20 industry professionals evaluated the element descriptions and provided element prioritization data that was statistically analyzed to develop a preliminary weighted score sheet that corresponds to the element descriptions. Given that the author was only able to collect complete data from 11 projects, definitively determining element weights was not possible. Therefore, the author leveraged a Delphi study to test the PDRI – Tribal Building Projects. Delphi study results indicate the PDRI – Tribal Building Projects element descriptions fully address the scope of tribal building projects, and 75 percent of panelists agreed they would use this tool on their next tribal project. The author also explored the PDRI – Tribal Building Projects tool through the lens of the Diné (Navajo) Philosophy of Sa’ąh Naagháí Bik’eh Hózhóón (SNBH) and the guiding principles of Nistáhákees (thinking), Nahat’á (planning), Iiná (living), and Sihasin (assurance/reflection). The results of the author’s research provides several contributions to the American Indian Studies, front end planning, and tribal building projects bodies of knowledge: 1) defining unique features of tribal projects, 2) explicitly documenting the synergies between Western and Diné ways of planning, and 3) creating a tool to assist in planning capital projects on tribal lands in the American Southwest in support of improved cost performance.
ContributorsArviso, Brianne (Author) / Parrish, Kristen (Thesis advisor) / Gibson, George E. (Committee member) / Hale, Michelle (Committee member) / Arizona State University (Publisher)
Created2022
131022-Thumbnail Image.png
Description
Phoenix Sky Harbor International Airport, in Phoenix, Arizona, is currently undergoing an expansion of its Sky Train people mover to extend past the passenger terminal and connect with the Rental Car Center approximately 2.25 miles from the terminal complex. This expansion will allow passengers arriving at Phoenix Sky Harbor International

Phoenix Sky Harbor International Airport, in Phoenix, Arizona, is currently undergoing an expansion of its Sky Train people mover to extend past the passenger terminal and connect with the Rental Car Center approximately 2.25 miles from the terminal complex. This expansion will allow passengers arriving at Phoenix Sky Harbor International Airport (PHX) to transfer to the Rental Car Center in a more efficient and direct way compared to the current bus system. Additionally, the plans incorporate potential future construction. Although the plans for this expansion have been in place for many years, construction only began relatively recently. A construction project of this size is not a commonplace occurrence in the industry, and it requires considerable planning, coordination, research, and cooperation in order to complete successfully. This paper describes the project and explores how project members cooperate with each other and additional project stakeholders, and it explores the multiple elements of making a construction project like this possible.
ContributorsLevy, Mecah (Author) / Bearup, Wylie (Thesis director) / Parrish, Kristen (Committee member) / Del E. Webb Construction (Contributor) / Barrett, The Honors College (Contributor)
Created2020-12
130969-Thumbnail Image.png
Description
This Fantasyland expansion is a proposed 302,000 square foot development west of Harbor Boulevard and south of the Parade Route. This plot of land caught the eye of Performance Imagineering, the latest and greatest firm in theme park consulting, as it is currently home to Autopia, a massive drivable car

This Fantasyland expansion is a proposed 302,000 square foot development west of Harbor Boulevard and south of the Parade Route. This plot of land caught the eye of Performance Imagineering, the latest and greatest firm in theme park consulting, as it is currently home to Autopia, a massive drivable car ride for guests. Although this large portion of land is currently considered part of Tomorrowland, this proposition suggests otherwise. With the exponential growth of action and adventure themed attractions in the park, it comes time to revive the original Disney themes of love and fantasy. This proposal does so by introducing princesses from some of Disney's most successful intellectual property of late, to the Disneyland Resort.
ContributorsTaylor, Gary Joseph (Author) / Parrish, Kristen (Thesis director) / Ariaratnam, Samuel (Committee member) / Construction Engineering (Contributor) / Barrett, The Honors College (Contributor)
Created2020-12
163469-Thumbnail Image.png
Description

This report attempts to understand the effects of the many aspects that pertain to a woman’s path into the construction industry and their role in limiting women’s overall representation in the construction industry. More specifically, it aims to understand how upbringing, background, and culture impact women that do pursue careers

This report attempts to understand the effects of the many aspects that pertain to a woman’s path into the construction industry and their role in limiting women’s overall representation in the construction industry. More specifically, it aims to understand how upbringing, background, and culture impact women that do pursue careers in the construction industry. This paper presents some of the current and prominent issues being faced by women in in the construction industry, including those in the trades. These issues then contribute to their lack of representation and forceful exit. Additionally, it assesses personal narratives from a localized group of women who are currently employed at a large construction company. This information and these narratives are analyzed jointly to try and gain a better understanding of the current challenges being faced by women in comparison to those reported previously. This joint comparison allows for a deeper understanding of women’s perception of the construction industry as a whole.

ContributorsContreras, Marisa (Author) / Lou, Yingyan (Thesis director) / Parrish, Kristen (Committee member) / Barrett, The Honors College (Contributor) / School of Mathematical and Statistical Sciences (Contributor) / School of Social Transformation (Contributor) / Civil, Environmental and Sustainable Eng Program (Contributor)
Created2022-05