Matching Items (2)
Filtering by

Clear all filters

133773-Thumbnail Image.jpg
Description
My creative project involved the creation of a short, abstract animation set to EDM music. It's meant to mimic the graphics displayed in the background of EDM concerts and was inspired by Beeple and the graphics he designed for EDM artist, Zedd. Under the guidance of my director, Meredith Drum,

My creative project involved the creation of a short, abstract animation set to EDM music. It's meant to mimic the graphics displayed in the background of EDM concerts and was inspired by Beeple and the graphics he designed for EDM artist, Zedd. Under the guidance of my director, Meredith Drum, and with help from my second committee member, Muriel Magenta, I was able to use Audacity to edit the music, Autodesk Maya 2016 to model and animate the animation, the HIDA render farm to render the frames using Maya Software and mentalray, Adobe After Effects CC to assemble and edit the animation, and Adobe Media Encoder to export the end product. The final animation included 20,855 individual frames, totaling to 14 minutes and 28 seconds in length. The project takes the viewer through seven worlds to express the idea of feeling isolated in your home, exploring the world, and then returning home with a new perspective. Each world evokes a different emotion through the interaction of its visual and audio design to allow the viewer to experience the intended storyline without explicit characters or plot detail. Due to the importance of maintaining plot flow, I utilized beautiful, yet difficult, design elements including glass textures, ocean shaders, and paint effects to create drastically different world designs specific to each song. These songs were chosen from a variety of EDM artists and edited to flow together seamlessly through each world and evoke a different emotion. Throughout the thesis process, I gained more skills in animation and editing and greatly improved my ability to use each application. While there is plenty of room to grow, I have improved exponentially as an artist from when I began this project to the moment I completed it.
ContributorsMallik, Ajanta Angie (Author) / Drum, Meredith (Thesis director) / Magenta, Muriel (Committee member) / The Design School (Contributor) / Department of Psychology (Contributor) / School of Social Transformation (Contributor) / School of Art (Contributor) / WPC Graduate Programs (Contributor) / Barrett, The Honors College (Contributor)
Created2018-05
133309-Thumbnail Image.jpg
Description
Using the Arizona State University chapter of American Concrete Institute (ACI) as my platform, I recently teamed up with several generous companies to donate a new picnic slab and sidewalks to St. Vincent de Paul Elementary School's playground. Material/labor donations from Suntec Concrete, Arizona Materials, Salt River Materials Group, and

Using the Arizona State University chapter of American Concrete Institute (ACI) as my platform, I recently teamed up with several generous companies to donate a new picnic slab and sidewalks to St. Vincent de Paul Elementary School's playground. Material/labor donations from Suntec Concrete, Arizona Materials, Salt River Materials Group, and Dickens Quality Demolition made it possible to complete this project over the course of two Saturdays and at no cost for the school. In addition to the children of St. Vincent de Paul's benefit, this project also gave ASU and MCC students the opportunity to work in the field with industry professionals and gain hands-on experience. Over 20 students were able to witness and participate in demolition, formwork, concrete placement (including a laser screed appearance provided by Suntec), finishing, sawcutting, and more. As for specifics, the project featured a 19' x 40' picnic slab, as well as two 6' wide sidewalks connecting the slab to the playground and the playground to the adjacent access road. Once the second sidewalk reached the access road, it continued to the classrooms with 6' wide ramps on each side for truck accessibility. My role in this project was essentially a superintendent. I served as the primary point of contact for all parties involved, organized the material and labor donations, coordinated the project schedule, and kept all companies informed of the schedule to ensure proper execution and avoid delays. Due to various unavoidable conditions (cold weather, shade on the slab, etc.), I was also forced to make a few critical decisions as the project progressed.
ContributorsTwichell, Bennett (Author) / Ernzen, James (Thesis director) / Standage, Richard (Committee member) / Civil, Environmental and Sustainable Engineering Program (Contributor) / Barrett, The Honors College (Contributor)
Created2018-05