Matching Items (5)
Filtering by

Clear all filters

136655-Thumbnail Image.png
Description

The U.S. Navy and other amphibious military organizations utilize a derivation of the traditional side stroke called the Combat Side Stroke, or CSS, and tout it as the most efficient technique available. Citing its low aerobic requirements and slow yet powerful movements as superior to the traditionally-best front crawl (freestyle),

The U.S. Navy and other amphibious military organizations utilize a derivation of the traditional side stroke called the Combat Side Stroke, or CSS, and tout it as the most efficient technique available. Citing its low aerobic requirements and slow yet powerful movements as superior to the traditionally-best front crawl (freestyle), the CSS is the go-to stroke for any operation in the water. The purpose of this thesis is to apply principles of Industrial Engineering to a real-world situation not typically approached from a perspective of optimization. I will analyze pre-existing data about various swim strokes in order to compare them in terms of efficiency for different variables. These variables include calories burned, speed, and strokes per unit distance, as well as their interactions. Calories will be measured by heart rate monitors, converting BPM to calories burned. Speed will be measured by stopwatch and observer. Strokes per unit distance will be measured by observer. The strokes to be analyzed include the breast stroke, crawl stroke, butterfly, and combat side stroke. The goal is to informally test the U.S. Navy's claim that the combat side stroke is the optimum stroke to conserve energy while covering distance. Because of limitations in the scope of the project, analysis will be done using data collected from literary sources rather than through experimentation. This thesis will include a design of experiment to test the findings here in practical study. The main method of analysis will be linear programming, followed by hypothesis testing, culminating in a design of experiment for future progress on this topic.

ContributorsGoodsell, Kevin Lewis (Author) / McCarville, Daniel R. (Thesis director) / Kashiwagi, Jacob (Committee member) / Industrial, Systems (Contributor) / Barrett, The Honors College (Contributor)
Created2014-12
134341-Thumbnail Image.png
Description
As single junction silicon based solar cells approach their Shockley\u2014Queasier (SQ) conversion efficiency limits, tandem solar cells (TSC) provide an attractive prospect for higher efficiency cells. Although TSCs have been shown to be more efficient, their higher fabrication costs are a limiting factor for their economic competitiveness and large-scale integration

As single junction silicon based solar cells approach their Shockley\u2014Queasier (SQ) conversion efficiency limits, tandem solar cells (TSC) provide an attractive prospect for higher efficiency cells. Although TSCs have been shown to be more efficient, their higher fabrication costs are a limiting factor for their economic competitiveness and large-scale integration in PV power systems. Current literature suggests that even with reduced costs of fabrication in the future, TSCs still offer no competitive benefit for integration in utility-scale systems and may yield minimal benefits only in places where area-related costs are high. This work investigates Balance of Systems (BoS) circumstances under which TSCs can attain economic viability in scenarios where the necessary technological advances are made to increase the efficiency of solar cells beyond the SQ limit.
ContributorsMugwisi, Ngoni (Author) / Holman, Zachary (Thesis director) / Phelan, Patrick (Committee member) / Industrial, Systems (Contributor) / Electrical Engineering Program (Contributor) / Barrett, The Honors College (Contributor)
Created2017-05
134361-Thumbnail Image.png
Description

Based on findings of previous studies, there was speculation that two well-known experimental design software packages, JMP and Design Expert, produced varying power outputs given the same design and user inputs. For context and scope, another popular experimental design software package, Minitab® Statistical Software version 17, was added to the

Based on findings of previous studies, there was speculation that two well-known experimental design software packages, JMP and Design Expert, produced varying power outputs given the same design and user inputs. For context and scope, another popular experimental design software package, Minitab® Statistical Software version 17, was added to the comparison. The study compared multiple test cases run on the three software packages with a focus on 2k and 3K factorial design and adjusting the standard deviation effect size, number of categorical factors, levels, number of factors, and replicates. All six cases were run on all three programs and were attempted to be run at one, two, and three replicates each. There was an issue at the one replicate stage, however—Minitab does not allow for only one replicate full factorial designs and Design Expert will not provide power outputs for only one replicate unless there are three or more factors. From the analysis of these results, it was concluded that the differences between JMP 13 and Design Expert 10 were well within the margin of error and likely caused by rounding. The differences between JMP 13, Design Expert 10, and Minitab 17 on the other hand indicated a fundamental difference in the way Minitab addressed power calculation compared to the latest versions of JMP and Design Expert. This was found to be likely a cause of Minitab’s dummy variable coding as its default instead of the orthogonal coding default of the other two. Although dummy variable and orthogonal coding for factorial designs do not show a difference in results, the methods affect the overall power calculations. All three programs can be adjusted to use either method of coding, but the exact instructions for how are difficult to find and thus a follow-up guide on changing the coding for factorial variables would improve this issue.

ContributorsArmstrong, Julia Robin (Author) / McCarville, Daniel R. (Thesis director) / Montgomery, Douglas (Committee member) / Industrial, Systems (Contributor, Contributor) / Barrett, The Honors College (Contributor)
Created2017-05
135127-Thumbnail Image.png
Description
Access to clean drinking water has been identified by the National Academy of Engineering as one of the Grand Challenges of the 21st century. This thesis investigated clean drinking water access in the greater Phoenix area, specifically with regards to drinking water quality standards and management strategies. This research report

Access to clean drinking water has been identified by the National Academy of Engineering as one of the Grand Challenges of the 21st century. This thesis investigated clean drinking water access in the greater Phoenix area, specifically with regards to drinking water quality standards and management strategies. This research report provides an introduction to water quality, treatment, and management; a background on the Salt River Project; and an analysis on source water mix and drinking water quality indicators for water delivered to Tempe, Arizona water treatment facilities.
ContributorsMercer, Rebecca Nicole (Author) / Ganesh, Tirupalavanam (Thesis director) / Trowbridge, Amy (Committee member) / Industrial, Systems (Contributor) / School of Sustainability (Contributor) / Barrett, The Honors College (Contributor)
Created2016-12
135972-Thumbnail Image.png
Description
The Performance Based Studies Research Studies Group (PBSRG) at Arizona State University (ASU) has been studying the cause of increased cost and time in construction and other projects for the last 20 years. Through two longitudinal studies with a group of owners in the state of Minnesota (400 tests over

The Performance Based Studies Research Studies Group (PBSRG) at Arizona State University (ASU) has been studying the cause of increased cost and time in construction and other projects for the last 20 years. Through two longitudinal studies with a group of owners in the state of Minnesota (400 tests over six years) and the US Army Medical Command (400 tests over four years), the client/buyer has been identified as the largest risk and source of project cost and time deviations. This has been confirmed by over 1,500 tests conducted over the past 20 years. The focus of this research effort is to analyze the economic and performance impact of a delivery process of construction called the Job Order Contracting (JOC) process, to evaluate the value (in terms of time, cost, and customer satisfaction) achieved when utilizing JOC over other traditional methods to complete projects. JOC's strength is that it minimizes the need for the owner to manage, direct and control (MDC) through a lengthy traditional process of design, bid, and award of a construction contract. The study identifies the potential economic savings of utilizing JOC. This paper looks at the results of an ongoing study surveying eight different public universities. The results of the research show that in comparison to more traditional models, JOC has large cost savings, and is preferable among most owners who have used multiple delivery systems.
ContributorsLi, Hao (Author) / Kashiwagi, Dean (Thesis director) / Kashiwagi, Jacob (Committee member) / Industrial, Systems (Contributor) / Department of Information Systems (Contributor) / Barrett, The Honors College (Contributor)
Created2015-12