Matching Items (13)
Filtering by

Clear all filters

156379-Thumbnail Image.png
Description
Recent studies have identified that contractors in the Saudi construction industry are not the main party that cause risks as owners and other parties have the major share of causing risks. However, with the identification that risks out of contractors’ control are a leading cause of low performance, there is

Recent studies have identified that contractors in the Saudi construction industry are not the main party that cause risks as owners and other parties have the major share of causing risks. However, with the identification that risks out of contractors’ control are a leading cause of low performance, there is a lack of efficient risk mitigation practices in Saudi to manage these risks. The main aim of this dissertation is to assess the current practices applied by contractors to minimize risk out of their control and develop a risk mitigation model to manage these risks. The main objectives of the study are: investigating the risks that are out of contractors’ control, assessing the contractors’ current risk mitigation and performance measurement practices, and finally developing and validating a risk mitigation model to minimize risks out of contractors’ control and measure performance of involved project parties. To achieve the study aim, a mixed methodological approach was adopted. Theoretical approaches were utilized to review previous research and to develop a conceptual risk mitigation framework followed by a practical approach that is considered with collecting data from contractors. The quantitative method was mainly used to meet the study objectives through distributing a survey in the form of a questionnaire. As a consolidation of the study findings, the top ranked risks that are out of contractors’ control were identified. Furthermore, the results identified that the contractors’ current risk management and performance measurement practices are not effective in minimizing projects risks caused by other parties and ineffective in measuring performance of all parties. The developed model focuses on increasing accountability of project parties through mitigating project parties’ activities and risks with measuring the deviations and identifying sources of deviations. Transparency is utilized in the model through sharing weekly updates of the activities and risks combined with updated information of performance measurements of all project parties. The study results showed that project risks can be minimized and projects’ performance can be increased if contractors shift their focus using the developed model from only managing their own activities and risks to managing all project parties’ activities and risks.
ContributorsAlgahtany, Mohammed (Author) / Sullivan, Kenneth (Thesis advisor) / Kashiwagi, Dean (Committee member) / Badger, William (Committee member) / Arizona State University (Publisher)
Created2018
136296-Thumbnail Image.png
Description
Modern Americans ignorantly live under a blanket of unread terms, conditions, and binding contracts. Often, these contracts (mostly associated with products and services) come and go with little effect. Periodically, the products or services cause the consumer harm, leading them to seek repair. The consumer then realizes that all the

Modern Americans ignorantly live under a blanket of unread terms, conditions, and binding contracts. Often, these contracts (mostly associated with products and services) come and go with little effect. Periodically, the products or services cause the consumer harm, leading them to seek repair. The consumer then realizes that all the fine print they failed to read makes an impactful legal difference. This paper analyzes the work of Professor Radin through her book, Boilerplate. It goes on to explore many other arguments presented by contract theorists and makes substantial claims regarding the dangers of boilerplate (unread terms and conditions).
ContributorsBecker, Alexander Daniel (Author) / Koretz, Lora (Thesis director) / Calleros, Charles (Committee member) / Barrett, The Honors College (Contributor) / W. P. Carey School of Business (Contributor) / Department of English (Contributor)
Created2015-05
137052-Thumbnail Image.png
Description
The purpose of this creative thesis project is to create the framework of an educational class package based off of a course offered at Arizona State University. The course chosen for this project is an honors course titled Deductive Logic: Leadership and Management Techniques and is taught by Dean Kashiwagi,

The purpose of this creative thesis project is to create the framework of an educational class package based off of a course offered at Arizona State University. The course chosen for this project is an honors course titled Deductive Logic: Leadership and Management Techniques and is taught by Dean Kashiwagi, PhD. The class package is designed to be published over an online platform so students and professors from various institutions can access the material. Currently the platform is in its final stages of development and is slated to go live on July of 2014. The future development of the package will be geared towards facilitating interdisciplinary collaboration between institutions based off of course concepts.
ContributorsGunnoe, Jake Alan (Author) / Kashiwagi, Dean (Thesis director) / Kashiwagi, Jacob (Committee member) / Barrett, The Honors College (Contributor) / Mechanical and Aerospace Engineering Program (Contributor) / Del E. Webb Construction (Contributor)
Created2014-05
134736-Thumbnail Image.png
Description
Mindfulness-based stress reduction (MSBR) is a clinically standardized meditation process that has been shown to facilitate the treatment of a variety of mental and physical disorders. The known efficacy of mindfulness-based stress reduction is derived from research on participants who are defined as unhealthy in some form. The potential benefits

Mindfulness-based stress reduction (MSBR) is a clinically standardized meditation process that has been shown to facilitate the treatment of a variety of mental and physical disorders. The known efficacy of mindfulness-based stress reduction is derived from research on participants who are defined as unhealthy in some form. The potential benefits of mindfulness-based stress reduction for individuals who are considered to be healthy is under-studied, as less attention has gone into this subject area. Information Measurement Theory is a predictive theory that simplifies reality, and through this logical simplification, allows people to predict and see into the future. The concepts that are central to Information Measurement theory are natural laws, unique conditions, and relationships of unique conditions between the past, present, and future and the event model. This project aims to answer the question of if individuals, who are considered to be healthy, experience the same beneficiary results, that mindfulness-based stress reduction models execute, through the conception and knowledge of Information Measurement Theory. This study aims to compare MBSR and IMT in order to determine the consequences of each on the individual. The purpose of this study is also to highlight the promising success that Leadership Society of Arizona has achieved through the teaching of IMT in leadership courses.
ContributorsPirotte, Genevieve Katherine (Author) / Kashiwagi, Dean (Thesis director) / Kashiwagi, Jacob (Committee member) / Department of Psychology (Contributor) / Barrett, The Honors College (Contributor)
Created2016-12
Description
The purpose of this research paper is to examine the current state of Arizona's public K-12 education system and offer tangible solutions to improve it. An overview of the state's educational funding and performative rankings reveals a deeply disadvantaged system that especially disadvantages low income students. Arizona continually ranks in

The purpose of this research paper is to examine the current state of Arizona's public K-12 education system and offer tangible solutions to improve it. An overview of the state's educational funding and performative rankings reveals a deeply disadvantaged system that especially disadvantages low income students. Arizona continually ranks in the bottom quartile in the nation for both K-12 performance and public education spending. By examining the best practices employed by some of the highest-ranking school systems in the world and reconfiguring them to fit Arizona, the state can significantly improve its national and international rankings. Research was conducted into four Scandinavian countries and four Southeast Asian countries selected based on 2016 K-12 Achievement Scores, Gross National Happiness Index, National 2016 Social Progress Index, and the 2016 Social Mobility Index as follows: Finland, Belgium, Netherlands, Switzerland, Singapore, Japan, South Korea, and China (Hong Kong). After dissecting each countries' public school characteristics and funding formula, it was clear that each block of countries offered different solutions to the problems presented by Arizona's current educational climate. Namely increasing the efficacy of social welfare programs that directly impact low income students in K-12, improving statewide teacher certification standards, modeling the school year to be more like Southeast Asian countries to reduce summer learning loss, and facilitating an "educational culture" similar to that of Japan.
Created2017-05
Description
In this study, the implementation of educational technology and its effect on learning and user experience is measured. A demographic survey, pretest/posttest, and educational experience survey was used to collect data on the control and experimental groups. The experimental group was subjected to different learning material than the control grou

In this study, the implementation of educational technology and its effect on learning and user experience is measured. A demographic survey, pretest/posttest, and educational experience survey was used to collect data on the control and experimental groups. The experimental group was subjected to different learning material than the control group with the use of the Elements 4D mobile application by Daqri to learn basic chemical elements and compounds. The control group learning material provided all the exact information as the application, but in the 2D form of a printed packet. It was expected the experimental group would outperform the control group and have a more enjoyable experience and higher performance. After data analysis, it was concluded that the control group outperformed the experimental group on performance and both groups has similar experiences in contradiction to the hypothesis. Once the factors that contribute to the limitations of different study duration, learning the application beforehand, and only-memorization questions are addressed, the study can be conducted again. Application improvements may also alter the future results of the study and hopefully lead to full implementation into a curriculum.
ContributorsApplegate, Garrett Charles (Author) / Atkinson, Robert (Thesis director) / Chavez-Echeagaray, Maria Elena (Committee member) / Industrial, Systems (Contributor) / Barrett, The Honors College (Contributor)
Created2017-05
153833-Thumbnail Image.png
Description
Delays are a major cause for concern in the construction industry both globally and locally in Saudi Arabia. This paper identifies the main causes of delay in infrastructure projects in the holy city of Makkah (Saudi Arabia) and compares these with projects around the rest of the country and other

Delays are a major cause for concern in the construction industry both globally and locally in Saudi Arabia. This paper identifies the main causes of delay in infrastructure projects in the holy city of Makkah (Saudi Arabia) and compares these with projects around the rest of the country and other Gulf countries as well. Data were obtained from 49 infrastructure projects that were undertaken by the owner and were analyzed quantitatively to understand the severity and causes of delay. 10 risk factors were identified in this study and these factors were grouped into four categories. The average delay in infrastructure projects in the city of Makkah was found to be 39%. The most severe cause of delay was found to be the land acquisition factor. This highlights the critical land ownership and acquisition issues that is prevailing in Makkah. In addition to this, other factors include contractors’ lack of expertise, haphazard underground utilities (line services), and re-designing. It is concluded that majority of delays were caused from the owner’s side as compared to contractors, consultants, and other project’s stakeholders. This finding was in line with the research findings of the Gulf Countries Construction (GCC) Industry’s literature as well. This study will fill an important practice and research gap for improving the efficiency in project delivery for infrastructure projects in the holy city of Makkah and the Gulf countries at large.
ContributorsElawi, Ghazi Saad A (Author) / Kashiwagi, Dean (Thesis advisor) / Sullivan, Kenneth (Committee member) / Kashiwagi, Jacob (Committee member) / Arizona State University (Publisher)
Created2015
155786-Thumbnail Image.png
Description
Public construction projects in Saudi Arabia have been experiencing performance issues for the past 30 years. There have been many research efforts and publications identifying the problem and potential causes, however, there have been minimal efforts identifying how to mitigate the problem and testing to validate proposed solutions. A literature

Public construction projects in Saudi Arabia have been experiencing performance issues for the past 30 years. There have been many research efforts and publications identifying the problem and potential causes, however, there have been minimal efforts identifying how to mitigate the problem and testing to validate proposed solutions. A literature search has shown that the academic research has had minimal impact in assisting the construction industry to improve its performance. This dissertation aimed to evaluate the impact of construction management research in Saudi construction industry (SCI), and to investigate barriers that hinder the diffusion of implementing the research outcomes in the construction sector in order to develop a research roadmap to bridge the gap between academic research and practice, using the experience of other organizations that have a successful experience in developing the impact of construction management research in the construction industry. In order to achieve the aim of the study, five main objectives were set up which are: evaluate the impact of construction management research in SCI, identify the barriers that affect the implementation of construction management research in SCI, develop a research roadmap to bridge the gap between the research and practice, validating the proposed solution, and proposed implementation plan and review the result from the implementation. A literature research was performed, using 5 academic databases, identifying the impact that R&D has had on the SCI. A questionnaire was also created surveying both researchers and industry professionals. The results show evidence that the current R&D process in Saudi Arabia is not helping the SCI to increase their performance, and needs to be improved. This study provides a potential solution, and an action plan that mirrors one of the most successful research and development programs in the construction industry in the world [+1915 tests, six different countries, 31 states in the U.S. and 98% customer satisfaction]. The solution proposed in this dissertation is unique to the strengths and weaknesses of the research and development programs at universities and research centers in Saudi Arabia. This study is the first study of its kind in Saudi Arabia.
ContributorsAlhammadi, Yasir (Author) / Kashiwagi, Dean (Thesis advisor) / Badger, William (Committee member) / Sullivan, Kenneth (Committee member) / Arizona State University (Publisher)
Created2017
155709-Thumbnail Image.png
Description
ABSTRACT

The current Saudi Arabian (SA) procurement system leads to many losses in money and benefits in projects. Also, the use of the traditional procurement system in SA has been identified as one of the causes for poor performance in the delivery of construction and the major risk to the SA

ABSTRACT

The current Saudi Arabian (SA) procurement system leads to many losses in money and benefits in projects. Also, the use of the traditional procurement system in SA has been identified as one of the causes for poor performance in the delivery of construction and the major risk to the SA government. A questionnaire has been developed and carefully designed based on literature review. The purpose of the survey was to identify the validity of the recent claims that the procurement system in SA is broken and to improve the current SA procurement system. The questionnaire was sent out to 1,396 participants including included 867 engineers, 256 consultants, 93 contractors, 35 owners and 132 architects and 13 academics.

All participants have been registered and licensed professionals at the SA Council for professional engineers, who work in both private and public sectors. The participants are interested in the SA procurement and contracts system with experience ranging from one to more than twenty-five years with the majority of twenty-five years of experience in common construction sectors such as; residential and commercial buildings, healthcare buildings, industrial building and heavy civil construction.

Most of the participants from both private and public sectors agreed with the survey questions subject matter regarding: zone price proposals, contractors' evaluation, risks, planning, projects' scope, owners concern and weekly risks reports (WRR). The survey results showed that the procurement system is the major risk to projects, affects construction projects negatively and is in need of improvement.

Based on the survey and literature review, a model, called Saudi government performance procurement model (SGPPM), has been developed in which the most expert contractor is chosen through four phases: submittals& education, vendors selection, illustration and execution. The resulting model is easy to implement by SA government and does not require special skills or backgrounds.
ContributorsAlofi, Ahmed Abdulrahman (Author) / Kashiwagi, Dean (Thesis advisor) / Sullivan, Kenneth (Committee member) / Kashiwagi, Jacob (Committee member) / Arizona State University (Publisher)
Created2017
155168-Thumbnail Image.png
Description
Saudi Arabia has been facing issues with completing construction projects on time and on budget. It has been documented that 70% of public construction projects are delayed. Studies have identified the low-bid delivery method as an important factor in causing such delays. The procurement system (low-bid) ignores contractors’ performance, and

Saudi Arabia has been facing issues with completing construction projects on time and on budget. It has been documented that 70% of public construction projects are delayed. Studies have identified the low-bid delivery method as an important factor in causing such delays. The procurement system (low-bid) ignores contractors’ performance, and that is reflected in projects’ performance. A case study was performed, at a University campus in northern Saudi Arabia, identifying the major causes of project delays and cost overruns. The University was experiencing delays from 50% to 150%. Also, the actual project costs for four projects were examined and found that all four projects’ costs were higher than the original bid. The delay and cost overruns factors were gathered from the University engineers. A literature research identified one construction management method, best value performance information procurement system (BV PIPS), has documented multiple times its ability to improve project performance. In a comparison using the result of a case study and the results of (BV PIPS), Saudi Arabia’s delivery system was identified as a potential cause of project performance issues. The current procurement system was analyzed and modified to adapt with the (BV PIPS). The proposed procurement system using BV PIPS, which can be implemented in Saudi Arabia, was created with owner side. A large survey was conducted of 761 classified contractors and 43 universities’ representatives who rated causes of delay factors and cost overruns. The delay factors were then compared to delay factors experienced on Saudi construction projects, identified by performing a literature research. The comparison identified 14 important causes of delays. Moreover, the survey showed that classified contractors and universities’ representatives unsatisfied with low-bid, and they agreed with BV PIPS which selecting vendors based on performance with price. The proposed model required a submitted level of experience (LE), risk assessment (RA), and value added (VA). Besides, project managers of vendors should be interviewed during the clarification phase. In addition, venders should submit the project’s scope, technical schedule, milestone schedule, and risk management plan. In the execution phase, vendors should submit a weekly risk report (WRR) and director’s report (DR).
ContributorsAlzara, Majed (Author) / Kashiwagi, Dean (Thesis advisor) / Kashiwagi, Jacob (Committee member) / Al-Tassan, Abdulrahman (Committee member) / Arizona State University (Publisher)
Created2016