Description
Alternative Project Delivery Methods (APDMs), namely Design Build (DB) and Construction Manager at Risk (CMAR), grew out of the need to find a more efficient project delivery approach than the traditional Design Bid Build (DBB) form of delivery. After decades of extensive APDM use, there have been many studies focused

Alternative Project Delivery Methods (APDMs), namely Design Build (DB) and Construction Manager at Risk (CMAR), grew out of the need to find a more efficient project delivery approach than the traditional Design Bid Build (DBB) form of delivery. After decades of extensive APDM use, there have been many studies focused on the use of APDMs and project outcomes. Few of these studies have reached a level of statistical significance to make conclusive observations about APDMs. This research effort completes a comprehensive study for use in the horizontal transportation construction market, providing a better basis for decisions on project delivery method selection, improving understanding of best practices for APDM use, and reporting outcomes from the largest collection of APDM project data to date. The study is the result of an online survey of project owners and design teams from 17 states representing 83 projects nationally. Project data collected represents almost six billion US dollars. The study performs an analysis of the transportation APDM market and answers questions dealing with national APDM usage, motivators for APDM selection, the relation of APDM to pre-construction services, and the use of industry best practices. Top motivators for delivery method selection: the project schedule or the urgency of the project, the ability to predict and control cost, and finding the best method to allocate risk, as well as other factors were identified and analyzed. Analysis of project data was used to compare to commonly held assumptions about the project delivery methods, confirming some assumptions and refuting others. Project data showed that APDM projects had the lowest overall cost growth. DB projects had higher schedule growth. CMAR projects had low design schedule growth but high construction schedule growth. DBB showed very little schedule growth and the highest cost growth of the delivery methods studied. Best practices in project delivery were studied: team alignment, front end planning, and risk assessment were identified as practices most critical to project success. The study contributes and improves on existing research on APDM project selection and outcomes and fills many of the gaps in research identified by previous research efforts and industry leaders.
ContributorsBingham, Evan Dale (Author) / Gibson Jr., G. Edward (Thesis advisor) / El Asmar, Mounir (Thesis advisor) / Bearup, Wylie (Committee member) / Arizona State University (Publisher)
Created2014
150605-Thumbnail Image.png
Description
Human resources have always been the most critical factor in the construction industry, and now, with a historic generation entering the age of retirement, the construction industry needs to place greater effort in preparing for the succession of their most important of human resource, their leaders. A significant body of

Human resources have always been the most critical factor in the construction industry, and now, with a historic generation entering the age of retirement, the construction industry needs to place greater effort in preparing for the succession of their most important of human resource, their leaders. A significant body of research has shown that succession planning minimizes the negative effects that come with leadership transition; however, little research has focused specifically on the construction industry. The majority of construction companies are family owned or have small pools of potential successors, which make them more susceptible to the negative impacts that occur with poor planning for succession. The objective of this research focuses on developing a methodology that will assist construction companies plan and prepare for a leadership transition. Data is gathered from case studies of twelve construction companies that have recently experienced leadership succession. The data is analyzed for practices and characteristics that correlate to successful leadership transitions. Through the findings in the literature review and data analysis of the case studies, the research successfully achieves the objective of developing a potential methodology for increasing the effectiveness of succession planning in a construction company.
ContributorsPerrenoud, Anthony (Author) / Sullivan, Kenneth T. (Thesis advisor) / Badger, William (Committee member) / Schleifer, Thomas (Committee member) / Arizona State University (Publisher)
Created2012
151157-Thumbnail Image.png
Description
Within the vast area of study in Organizational Change lays the industrial application of Change Management, which includes the understanding of both resisters and facilitators to organizational change. This dissertation presents an approach of gauging levels of change as it relates to both external and internal organization factors. The arena

Within the vast area of study in Organizational Change lays the industrial application of Change Management, which includes the understanding of both resisters and facilitators to organizational change. This dissertation presents an approach of gauging levels of change as it relates to both external and internal organization factors. The arena of such a test is given through the introduction of the same initiative change model, which attempts to improve transparency and accountability, across six different organizations where the varying results of change are measured. The change model itself consists of an interdisciplinary approach which emphasizes education of advanced organizational measurement techniques as fundamental drivers of converging change. The observations are documented in the real-time observed cased studies of six organizations as they progressed through the change process. This research also introduces a scaled metric for determining preliminary levels of change and endeavors to test both internal and external, or environmental, factors of change. A key contribution to the work is the analysis between both observed and surveyed data where a grounded theory analysis is used to help answer the question of what are factors of change in organizations. This work is considered to be foundational in real-time observational studies but has a promise for future additional contributions which would further elaborate on the phenomenon of prescribed organizational change.
ContributorsStone, Brian (Author) / Sullivan, Kenneth T. (Thesis advisor) / Verdini, William (Committee member) / Badger, William (Committee member) / Arizona State University (Publisher)
Created2012
150372-Thumbnail Image.png
Description
As global competition continues to grow more disruptive, organizational change is an ever-present reality that affects companies in all industries at both the operational and strategic level. Organizational change capabilities have become a necessary aspect of existence for organizations in all industries worldwide. Research suggests that more than half of

As global competition continues to grow more disruptive, organizational change is an ever-present reality that affects companies in all industries at both the operational and strategic level. Organizational change capabilities have become a necessary aspect of existence for organizations in all industries worldwide. Research suggests that more than half of all organizational change efforts fail to achieve their original intended results, with some studies quoting failure rates as high as 70 percent. Exasperating this problem is the fact that no single change methodology has been universally accepted. This thesis examines two aspect of organizational change: the implementation of tactical and strategic initiatives, primarily focusing on successful tactical implementation techniques. This research proposed that tactical issues typically dominate the focus of change agents and recipients alike, often to the detriment of strategic level initiatives that are vital to the overall value and success of the organizational change effort. The Delphi method was employed to develop a tool to facilitate the initial implementation of organizational change such that tactical barriers were minimized and available resources for strategic initiatives were maximized. Feedback from two expert groups of change agents and change facilitators was solicited to develop the tool and evaluate its impact. Preliminary pilot testing of the tool confirmed the proposal and successfully served to minimize tactical barriers to organizational change.
ContributorsLines, Brian (Author) / Sullivan, Kenneth T. (Thesis advisor) / Badger, William (Committee member) / Kashiwagi, Dean (Committee member) / Arizona State University (Publisher)
Created2011
154179-Thumbnail Image.png
Description
In today's era a lot of the construction projects suffer from time delay, cost overrun and quality defect. Incentive provisions are found to be a contracting strategy to address this potential problem. During last decade incentive mechanisms have gained importance, and they are starting to become adopted in the construction

In today's era a lot of the construction projects suffer from time delay, cost overrun and quality defect. Incentive provisions are found to be a contracting strategy to address this potential problem. During last decade incentive mechanisms have gained importance, and they are starting to become adopted in the construction projects. Most of the previous research done in this area was purely qualitative, with a few quantitative studies. This study aims to quantify the performance of incentives in construction by collecting the data from more than 30 projects in United States through a questionnaire survey. First, literature review addresses the previous research work related to incentive types, incentives in construction industry, incentives in other industry and benefits of incentives. Second, the collected data is analyzed with statistical methods to test the significance of observed changes between two data sets i.e. incentive projects and non-incentive projects. Finally, the analysis results provide evidence for the significant impact of having incentives; reduced the cost and schedule growth in construction projects in United States.
ContributorsPaladugu, Bala Sai Krishna (Author) / El Asmar, Mounir (Thesis advisor) / Ernzen, James (Committee member) / Sullivan, Kenneth (Committee member) / Arizona State University (Publisher)
Created2015
157437-Thumbnail Image.png
Description
The success or failure of projects is not determined only by procedures, tasks, and technologies, but also by the project team and its effectiveness. In order to lead project teams towards successful outcomes, project managers must maintain high quality relationships in the workplace. When looking at employees’ relationships in the

The success or failure of projects is not determined only by procedures, tasks, and technologies, but also by the project team and its effectiveness. In order to lead project teams towards successful outcomes, project managers must maintain high quality relationships in the workplace. When looking at employees’ relationships in the workplace, Social Exchange Theory introduces two types of exchanges: employee-organization and leader-member exchanges. While both types of exchanges focus exclusively on the employee’s longitudinal relationships, the interpersonal relationships among the team members are usually overlooked.

This research presents the results of a quantitative study of the interpersonal relationships of 327 project managers and assistant project managers in their workplace. Specifically, the study investigates if the quality of the relationship with particular stakeholders, such as one’s immediate supervisor (boss), peers, or subordinates, drives the individual’s quality of the relationship with other stakeholders.

Contrary to the expectations, in strictly hierarchical organizations (one direct supervisor), there is no significant correlation between the quality of relationships with the boss and the overall quality of the individual’s relationships. However, in the case of matrix organizations (two or three bosses), there are significant correlations between several variables such as the quality of the relationship, perceived importance and the time spent with each stakeholder, as well the inclination of the participant towards leadership actions. The driving relationship in matrix organizations is the one with “the most important peer”.
ContributorsK. Jamali, M. Hossein (Author) / Wiezel, Avi (Thesis advisor) / Sullivan, Kenneth T. (Committee member) / Badger, William (Committee member) / Arizona State University (Publisher)
Created2019
157195-Thumbnail Image.png
Description
The Vietnam Construction Industry (VCI) has been facing risks that cause delays, budget overrun, and low customer satisfaction that required continuously research efforts to manage them. This research assesses the current conditions of the VCI in terms of performance, common risks, and success factors; and explores the potential of using

The Vietnam Construction Industry (VCI) has been facing risks that cause delays, budget overrun, and low customer satisfaction that required continuously research efforts to manage them. This research assesses the current conditions of the VCI in terms of performance, common risks, and success factors; and explores the potential of using the Best Value Approach (BVA), an innovative procurement and project management technology, to improve overall VCI performance. VCI risk factors were presented in an analysis of the data collected from a survey that include the 23 common risk factors that cause non-performance in construction projects in developing countries. The factors were consolidated from an extensive literature reviews, and inputs were solicited from 103 construction practitioners in Vietnam. The study reveals the top five risk factors as the bureaucratic administrative system, financial difficulties of owner, slow payment of completed works, poor contractor performance, financial difficulties of contractor. Factor analysis explored the correlations among the risks and yielded four outcomes – Lack of Site and Legal Information, Lack of Capable Managers, Poor Deliverables Quality, and Owner’s Financial Incapability. VCI success factors were revealed from a survey that is adopted from 23 Critical Success Factors (CSFs) related to common construction risks, found through extensive literature reviews, and inputs were solicited from 101 VCI participants. The experts ranked those CSFs with respect to impact to project success. The study reveals the top impactful CSFs such as all project parties clearly understand their responsibilities, more serious consideration during contractor selection stage, test contractors’ experience and competency through successful projects in the past. Factor analysis was conducted to explore the principal success factor groupings and yielded four outcomes – Improving Management Capability, Adequate Pre-Planning, Stakeholders’ Management, and Performance-based Procurement. An analysis from six industry experts determined how current VCI conditions, namely risk and success factors, are related to BVA. Sixteen BVA success principles were identified and ranked based on their perceived impact to project performance by an industry survey with 98 VCI practitioners. The results show high agreement rate with all sixteen BVA principles. The majority of participants agreed that BVA would improve project performance and were interested in learning more about BVA. The results encourage further BVA testing and education in the VCI.
ContributorsLe, Nguyen Tran Khoi (Author) / Chong, Oswald W.K. (Thesis advisor) / Sullivan, Kenneth T. (Committee member) / Kashiwagi, Dean T. (Committee member) / Arizona State University (Publisher)
Created2019
157200-Thumbnail Image.png
Description

The built environment is responsible for a significant portion of global waste generation.

Construction and demolition (C&D) waste requires significant landfill areas and costs

billions of dollars. New business models that reduce this waste may prove to be financially

beneficial and generally more sustainable. One such model is referred to as the “Circular

Economy”

The built environment is responsible for a significant portion of global waste generation.

Construction and demolition (C&D) waste requires significant landfill areas and costs

billions of dollars. New business models that reduce this waste may prove to be financially

beneficial and generally more sustainable. One such model is referred to as the “Circular

Economy” (CE), which promotes the efficient use of materials to minimize waste

generation and raw material consumption. CE is achieved by maximizing the life of

materials and components and by reclaiming the typically wasted value at the end of their

life. This thesis identifies the potential opportunities for using CE in the built environment.

It first calculates the magnitude of C&D waste and its main streams, highlights the top

C&D materials based on weight and value using data from various regions, identifies the

top C&D materials’ current recycling and reuse rates, and finally estimates a potential

financial benefit of $3.7 billion from redirecting C&D waste using the CE concept in the

United States.

ContributorsAldaaja, Mohammad (Author) / El Asmar, Mounir (Thesis advisor) / Buch, Rajesh (Committee member) / Kaloush, Kamil (Committee member) / Arizona State University (Publisher)
Created2019
134315-Thumbnail Image.png
Description
Sustainable Materials Management and Circular Economy are both frameworks for considering the way we interact with the world's resources. Different organizations and institutions across the world have adopted one philosophy or the other. To some, there seems to be little overlap of the two, and to others, they are perceived

Sustainable Materials Management and Circular Economy are both frameworks for considering the way we interact with the world's resources. Different organizations and institutions across the world have adopted one philosophy or the other. To some, there seems to be little overlap of the two, and to others, they are perceived as being interchangeable. This paper evaluates Sustainable Materials Management (SMM) and Circular Economy (CE) individually and in comparison to see how truly different these frameworks are from one another. This comparison is then extended into a theoretical walk-through of an SMM treatment of concrete pavement in contrast with a CE treatment. With concrete being a ubiquitous in the world's buildings and roads, as well as being a major constituent of Construction & Demolition waste generated, its analysis is applicable to a significant portion of the world's material flow. The ultimate test of differentiation between SMM and CE would ask: 1) If SMM principles guided action, would the outcomes be aligned with or at odds with CE principles? and conversely 2) If CE principles guided action, would the outcomes be aligned with or at odds with SMM principles? Using concrete pavement as an example, this paper seeks to determine whether or not Sustainable Materials Management and Circular Economy are simply different roads leading to the same destination.
ContributorsAbdul-Quadir, Anisa (Author) / Kelman, Candice (Thesis director) / Buch, Rajesh (Committee member) / Barrett, The Honors College (Contributor)
Created2017-05
154610-Thumbnail Image.png
Description
Despite advancements in construction and construction-related technology, capital project performance deviations, typically overruns, remain endemic within the capital projects industry. Currently, management is generally unaware of the current status of their projects, and thus monitoring and control of projects are not achieved effectively. In an ever-increasing competitive industry

Despite advancements in construction and construction-related technology, capital project performance deviations, typically overruns, remain endemic within the capital projects industry. Currently, management is generally unaware of the current status of their projects, and thus monitoring and control of projects are not achieved effectively. In an ever-increasing competitive industry landscape, the need to deliver projects within technical, budgetary, and schedule requirements becomes imperative to sustain a healthy return on investment for the project stakeholders. The fact that information lags within the capital projects industry has motivated this research to find practices and solutions that facilitate Instantaneous Project Controls (IPC).

The author hypothesized that there are specific practices that, if properly implemented, can lead to instantaneous controls of capital projects. It is also hypothesized that instantaneous project controls pose benefits to project performance. This research aims to find practices and identify benefits and barriers to achieving a real-time mode of control. To achieve these objectives, several lines of inquiry had to be pursued. A panel of 13 industry professionals and three academics collaborated on this research project. Two surveys were completed to map the current state of project control practices and to identify state-of-the-art or ideal processes. Ten case studies were conducted within and outside of the capital projects industry to identify practices for achieving real-time project controls. Also, statistical analyses were completed on retrospective data for completed capital projects in order to quantify the benefits of IPC. In conclusion, this research presents a framework for implementing IPC across the capital projects industry. The ultimate output from this research is procedures and recommendations that improve project controls processes.
ContributorsAbbaszadegan, Amin (Author) / Grau Torrent, David (Thesis advisor) / El Asmar, Mounir (Committee member) / Gibson, Jr., G. Edward (Committee member) / Arizona State University (Publisher)
Created2016