Matching Items (5)
Filtering by

Clear all filters

134310-Thumbnail Image.png
Description
The Prestige Worldwide Resort and development area will be constructed to the east of Scottsdale Rd and North of the 101 loop. The development area is composed of 442.58 acres of land within 9 parcels. Zoning for this development area consists of commercial, recreational, golf course, residential, and water/wastewater treatment.

The Prestige Worldwide Resort and development area will be constructed to the east of Scottsdale Rd and North of the 101 loop. The development area is composed of 442.58 acres of land within 9 parcels. Zoning for this development area consists of commercial, recreational, golf course, residential, and water/wastewater treatment. The main feature of the development area is a luxury resort to be located at the southwest corner of Legacy Blvd and Hayden Rd. The resort includes a large pond over which the entrance road traverses. The resort also includes an 18-hole golf course located just north of Legacy Blvd. The proposed residential area is to the east of Hayden Rd on the northern half of the site. Along the northeastern border of this residential area are APS, SRP, and Bureau of Reclamation easements. A recreational area in the form of a park is proposed to the east and west of the southern portion of N Hayden Rd on the site. The southeast corner or the site is reserved for water and wastewater treatment. The southwest corner of the site is for commercial use with an additional recreational/sporting area just to the north of this commercial area. The key feature of the resort is its luxurious eight-story hotel along with two other hotel buildings that accommodate tourists who are visiting Scottsdale. The main hotel includes 210 rooms to provide enough housing for these tourists and acquire more attraction to Scottsdale. The composition of the hotel consists of the first floor being the lobby and a recreational area. The other floors each contain 30 rooms, 3 elevators, and a staircase. Surrounding the hotel is a parking lot for the hotel guests and people attending events hosted at the hotel. Regarding the hotel specifications, two different alternative designs were produced to determine the ideal steel member type, concrete reinforcement, and the steel frame layout. The final hotel design was determined by which alternative had the lowest structural response from loading and cost effective.
ContributorsCastro, Cesar Aaron (Author) / Fox, Peter (Thesis director) / Templeton, Stephanie (Committee member) / Civil, Environmental and Sustainable Engineering Programs (Contributor, Contributor) / Barrett, The Honors College (Contributor)
Created2017-05
Description
In the Spring 2013 and Fall 2013 semesters, a survey was taken of students enrolled in the principal undergraduate civil engineering structures course, CEE 321: Structural Analysis and Design, to assess both the prevalence of technology in the lives of the students and the potential ways this information could be

In the Spring 2013 and Fall 2013 semesters, a survey was taken of students enrolled in the principal undergraduate civil engineering structures course, CEE 321: Structural Analysis and Design, to assess both the prevalence of technology in the lives of the students and the potential ways this information could be use to improve the educational experience. The results of this survey indicated that there was a considerable demand for additional online resources outside of the formal classroom. The students of CEE 321 requested online lecture videos in particular, and so a project was launched at the start of the Spring 2014 semester to deliver a large body of academic instructional videos. In total, a collection of 30 instructional videos which covered all key topics covered over a semester of CEE 321 was published. The driving interest behind this creative project is to increase the level of understanding, comfort, and performance in students enrolled in the class. Although the quantity of initial student feedback is relatively small, the reactions are distinctly positive and reflect an improvement in understanding amongst the responding students. Over the course of upcoming semesters, qualitative and quantitative assessments of the impact of the videos are expected to provide a better indication of their quality and effectiveness in supporting student comprehension and performance in CEE 321. Above all, the success of these videos is directly tied to their ability to function as living, adaptable resources which are continuously molded and improved by student feedback.
ContributorsReasor, Drew Donn (Author) / Rajan, Subramaniam (Thesis director) / Hjelmstad, Keith (Committee member) / Civil, Environmental and Sustainable Engineering Programs (Contributor) / Barrett, The Honors College (Contributor)
Created2014-05
134597-Thumbnail Image.png
Description
Hospitals constitute 9 percent of commercial energy consumption in the U.S. annually, though they only make up 2 percent of the U.S. commercial floor space. Consuming an average of 259,000 Btu per square foot, U.S. hospitals spend about 8.3 billion dollars on energy every year. Utilizing collaborative delivery method for

Hospitals constitute 9 percent of commercial energy consumption in the U.S. annually, though they only make up 2 percent of the U.S. commercial floor space. Consuming an average of 259,000 Btu per square foot, U.S. hospitals spend about 8.3 billion dollars on energy every year. Utilizing collaborative delivery method for hospital construction can effectively save healthcare business owners thousands of dollars while reducing construction time and resulting in a better product: a building that has fewer operational deficiencies and requires less maintenance. Healthcare systems are integrated by nature, and are rich in technical complexity to meet the needs of their various patients. In addition to being technologically and energy intensive, hospitals must meet health regulations while maintaining human comfort. The interdisciplinary nature of hospitals suggests that multiple perspectives would be valuable in optimizing the building design. Integrated project delivery provides a means to reaching the optimal design by emphasizing group collaboration and expertise of the architect, engineer, owner, builder, and hospital staff. In previous studies, IPD has proven to be particularly beneficial when it comes to highly complex projects, such as hospitals. To assess the effects of a high level of team collaboration in the delivery of a hospital, case studies were prepared on several hospitals that have been built in the past decade. The case studies each utilized some form of a collaborative delivery method, and each were successful in saving and/or redirecting time and money to other building components, achieving various certifications, recognitions, and awards, and satisfying the client. The purpose of this research is to determine key strategies in the construction of healthcare facilities that allow for quicker construction, greater monetary savings, and improved operational efficiency. This research aims to communicate the value of both "green building" and a high level of team collaboration in the hospital-building process.
ContributorsHansen, Hannah Elizabeth (Author) / Parrish, Kristen (Thesis director) / Bryan, Harvey (Committee member) / Civil, Environmental and Sustainable Engineering Programs (Contributor) / Barrett, The Honors College (Contributor)
Created2017-05
134875-Thumbnail Image.png
Description
Productivity in the construction industry is an essential measure of production efficiency and economic progress, quantified by craft laborers' time spent directly adding value to a project. In order to better understand craft labor productivity as an aspect of lean construction, an activity analysis was conducted at the Arizona State

Productivity in the construction industry is an essential measure of production efficiency and economic progress, quantified by craft laborers' time spent directly adding value to a project. In order to better understand craft labor productivity as an aspect of lean construction, an activity analysis was conducted at the Arizona State University Palo Verde Main engineering dormitory construction site in December of 2016. The objective of this analysis on craft labor productivity in construction projects was to gather data regarding the efficiency of craft labor workers, make conclusions about the effects of time of day and other site-specific factors on labor productivity, as well as suggest improvements to implement in the construction process. Analysis suggests that supporting tasks, such as traveling or materials handling, constitute the majority of craft labors' efforts on the job site with the highest percentages occurring at the beginning and end of the work day. Direct work and delays were approximately equal at about 20% each hour with the highest peak occurring at lunchtime between 10:00 am and 11:00 am. The top suggestion to improve construction productivity would be to perform an extensive site utilization analysis due to the confined nature of this job site. Despite the limitations of an activity analysis to provide a complete prospective of all the factors that can affect craft labor productivity as well as the small number of days of data acquisition, this analysis provides a basic overview of the productivity at the Palo Verde Main construction site. Through this research, construction managers can more effectively generate site plans and schedules to increase labor productivity.
ContributorsFord, Emily Lucile (Author) / Grau, David (Thesis director) / Chong, Oswald (Committee member) / Civil, Environmental and Sustainable Engineering Programs (Contributor) / School of International Letters and Cultures (Contributor) / Barrett, The Honors College (Contributor)
Created2016-12
Description
Teaching methods in the present day are beginning to transition from the traditional lecture style to the flipped learning style. The flipped classroom, also known as an engaged learning classroom, follows the model where students are presented with lecture material prior to attending class. Instead of being lectured in class,

Teaching methods in the present day are beginning to transition from the traditional lecture style to the flipped learning style. The flipped classroom, also known as an engaged learning classroom, follows the model where students are presented with lecture material prior to attending class. Instead of being lectured in class, they work on applications of the material with the help of their peers and the instructional staff. One component that many engaged learning environments have in common is lecture videos for the students to view prior to attending class. An undergraduate civil engineering course at Arizona State University is modeled using an engaged learning environment; however, it does not provide lecture videos for the students. Many students in this course are seeing an engaged learning environment for the first time and need guidance on how to prepare for the course, how to approach course material, and how to interpret feedback, in addition to getting help in the technical concepts. This project aims to create supplemental lecture videos based on the concepts that students in the class identified as needing more information, as well as topics that will help students make this transition to an engaged learning environment. A series of sixteen videos were created and posted for the students to view prior to attending recitation periods. The feedback from the students regarding the videos was studied and implementation techniques for future semesters were tested.
ContributorsFlys, Victoria Pilar (Author) / Hjelmstad, Keith (Thesis director) / Baisley, Amie (Committee member) / Civil, Environmental and Sustainable Engineering Programs (Contributor) / Barrett, The Honors College (Contributor)
Created2015-12