The construction industry in India suffers from major time and cost overruns. Data from government and industry reports suggest that projects suffer from 20 to 25 percent time and cost overruns. Waste of resources has been identified as a major source of inefficiency. Despite a substantial increase in the past

The construction industry in India suffers from major time and cost overruns. Data from government and industry reports suggest that projects suffer from 20 to 25 percent time and cost overruns. Waste of resources has been identified as a major source of inefficiency. Despite a substantial increase in the past few years, demand for professionals and contractors still exceeds supply by a large margin. The traditional methods adopted in the Indian construction industry may not suffice the needs of this dynamic environment, as they have produced large inefficiencies. Innovative ways of procurement and project management can satisfy the needs aspired to as well as bring added value. The problems faced by the Indian construction industry are very similar to those faced by other developing countries. The objective of this paper is to discuss and analyze the economic concerns, inefficiencies and investigate a model that both explains the Indian construction industry structure and provides a framework to improve efficiencies. The Best Value (BV) model is examined as an approach to be adopted in lieu of the traditional approach. This could result in efficient construction projects by minimizing cost overruns and delays, which until now have been a rarity.
ContributorsNihas, Syed (Author) / Kashiwagi, Dean (Thesis advisor) / Sullivan, Kenneth (Committee member) / Kashiwagi, Jacob (Committee member) / Arizona State University (Publisher)
Created2013
152888-Thumbnail Image.png
Description
Owner organizations in the architecture, engineering, and construction (AEC) industry are presented with a wide variety of project delivery approaches. Implementation of these approaches, while enticing due to their potential to save money, reduce schedule delays, or improve quality, is extremely difficult to accomplish and requires a concerted change management

Owner organizations in the architecture, engineering, and construction (AEC) industry are presented with a wide variety of project delivery approaches. Implementation of these approaches, while enticing due to their potential to save money, reduce schedule delays, or improve quality, is extremely difficult to accomplish and requires a concerted change management effort. Research in the field of organizational behavior cautions that perhaps more than half of all organizational change efforts fail to accomplish their intended objectives. This study utilizes an action research approach to analyze change message delivery within owner organizations, model owner project team readiness and adoption of change, and identify the most frequently encountered types of resistance from lead project members. The analysis methodology included Spearman's rank order correlation, variable selection testing via three methods of hierarchical linear regression, relative weight analysis, and one-way ANOVA. Key findings from this study include recommendations for communicating the change message within owner organizations, empirical validation of critical predictors for change readiness and change adoption among project teams, and identification of the most frequently encountered resistive behaviors within change implementation in the AEC industry. A key contribution of this research is the recommendation of change management strategies for use by change practitioners.
ContributorsLines, Brian (Author) / Sullivan, Kenneth (Thesis advisor) / Wiezel, Avi (Committee member) / Badger, William (Committee member) / Arizona State University (Publisher)
Created2014
150449-Thumbnail Image.png
Description
Current information on successful leadership and management practices is contradictory and inconsistent, which makes difficult to understand what successful business practices are and what are not. The purpose of this study is to identify a simple process that quickly and logically identifies consistent and inconsistent leadership and management criteria. The

Current information on successful leadership and management practices is contradictory and inconsistent, which makes difficult to understand what successful business practices are and what are not. The purpose of this study is to identify a simple process that quickly and logically identifies consistent and inconsistent leadership and management criteria. The hypothesis proposed is that Information Measurement Theory (IMT) along with the Kashiwagi Solution Model (KSM) is a methodology than can differentiate between accurate and inaccurate principles the initial part of the study about authors in these areas show how information is conflictive, and also served to establish an initial baseline of recommended practices aligned with IMT. The one author that excels in comparison to the rest suits the "Initial Baseline Matrix from Deming" which composes the first model. The second model is denominated the "Full Extended KSM-Matrix" composed of all the LS characteristics found among all authors and IMT. Both models were tested-out for accuracy. The second part of the study was directed to evaluate the perception of individuals on these principles. Two different groups were evaluated, one group of people that had prior training and knowledge of IMT; another group of people without any knowledge of IMT. The results of the survey showed more confusion in the group of people without knowledge to IMT and improved consistency and less variation in the group of people with knowledge in IMT. The third part of the study, the analysis of case studies of success and failure, identified principles as contributors, and categorized them into LS/type "A" characteristics and RS/type "C" characteristics, by applying the KSM. The results validated the initial proposal and led to the conclusion that practices that fall into the LS side of the KSM will lead to success, while practices that fall into the RS of the KSM will lead to failure. The comparison and testing of both models indicated a dominant support of the IMT concepts as contributors to success; while the KSM model has a higher accuracy of prediction.
ContributorsReynolds, Harry (Author) / Kashiwagi, Dean (Thesis advisor) / Sullivan, Kenneth (Committee member) / Badger, William (Committee member) / Arizona State University (Publisher)
Created2011
156379-Thumbnail Image.png
Description
Recent studies have identified that contractors in the Saudi construction industry are not the main party that cause risks as owners and other parties have the major share of causing risks. However, with the identification that risks out of contractors’ control are a leading cause of low performance, there is

Recent studies have identified that contractors in the Saudi construction industry are not the main party that cause risks as owners and other parties have the major share of causing risks. However, with the identification that risks out of contractors’ control are a leading cause of low performance, there is a lack of efficient risk mitigation practices in Saudi to manage these risks. The main aim of this dissertation is to assess the current practices applied by contractors to minimize risk out of their control and develop a risk mitigation model to manage these risks. The main objectives of the study are: investigating the risks that are out of contractors’ control, assessing the contractors’ current risk mitigation and performance measurement practices, and finally developing and validating a risk mitigation model to minimize risks out of contractors’ control and measure performance of involved project parties. To achieve the study aim, a mixed methodological approach was adopted. Theoretical approaches were utilized to review previous research and to develop a conceptual risk mitigation framework followed by a practical approach that is considered with collecting data from contractors. The quantitative method was mainly used to meet the study objectives through distributing a survey in the form of a questionnaire. As a consolidation of the study findings, the top ranked risks that are out of contractors’ control were identified. Furthermore, the results identified that the contractors’ current risk management and performance measurement practices are not effective in minimizing projects risks caused by other parties and ineffective in measuring performance of all parties. The developed model focuses on increasing accountability of project parties through mitigating project parties’ activities and risks with measuring the deviations and identifying sources of deviations. Transparency is utilized in the model through sharing weekly updates of the activities and risks combined with updated information of performance measurements of all project parties. The study results showed that project risks can be minimized and projects’ performance can be increased if contractors shift their focus using the developed model from only managing their own activities and risks to managing all project parties’ activities and risks.
ContributorsAlgahtany, Mohammed (Author) / Sullivan, Kenneth (Thesis advisor) / Kashiwagi, Dean (Committee member) / Badger, William (Committee member) / Arizona State University (Publisher)
Created2018
156035-Thumbnail Image.png
Description
The construction industry is performing poorly regarding project management and service delivery. On average, global projects are over-budget, delayed, and met with unsatisfactory results according to buyers. To mitigate poor performance, the project management career path has been heavily researched and continually developed over the last century. Despite the published

The construction industry is performing poorly regarding project management and service delivery. On average, global projects are over-budget, delayed, and met with unsatisfactory results according to buyers. To mitigate poor performance, the project management career path has been heavily researched and continually developed over the last century. Despite the published advances in project management approaches and tools, project performance continues to suffer. This research seeks to conduct an exploratory analysis of current project management and other approaches and determine how they affect project performance. Through a detailed literature search, the researcher identified a procurement model that is more heavily documented as high performing than all other approaches. The researcher proposed that this model may be a solution to assist project managers with the delivery of high performing services. The model is called the Best Value Approach (BVA). The BVA focuses on leadership, non-technical communication, quality assurance, and transparent project execution. To test the effectiveness of its practices, the researcher modified and adapted the BVA into a project management approach and tested it on a large-scale government project. During the case study test, the researcher observed that there were two primary project management roles in the supply chain; the buyer’s and vendor’s project managers. The case study resulted in the large government organization receiving more work and increased their satisfaction of the work received by 22 percent from the previous year. To further test the project management adapted BVA, the researcher conducted a classroom case-study in which students learned and implemented the BVA practices on real-time, small-scale industry projects. Results include cost savings of $100,000 for 10 companies over 24 projects, cost avoidance of over $4.5M, and a 9.8/10 customer satisfaction [in terms of the companies’ satisfaction with the deliverables produced on each project]. These results suggest that the BVA practices may effectively improve the performance of project delivery, and may be a viable new project management approach to train future project managers. Out of the two project manager roles, it is proposed that the buyer’s project manager may receive the most benefit. Additional research is needed on the other approaches to compare quantitative project performance, and run repeated testing on the potential new project management approach.
ContributorsRivera, Alfredo Octavio (Author) / Badger, William (Thesis advisor) / Sullivan, Kenneth (Thesis advisor) / Kashiwagi, Jacob S (Committee member) / Arizona State University (Publisher)
Created2017
156707-Thumbnail Image.png
Description
The United States building sector was the most significant carbon emission contributor (over 40%). The United States government is trying to decrease carbon emissions by enacting policies, but emissions increased by approximately 7 percent in the U.S. between 1990 and 2013. To reduce emissions, investigating the factors affecting carbon emissions

The United States building sector was the most significant carbon emission contributor (over 40%). The United States government is trying to decrease carbon emissions by enacting policies, but emissions increased by approximately 7 percent in the U.S. between 1990 and 2013. To reduce emissions, investigating the factors affecting carbon emissions should be a priority. Therefore, in this dissertation, this research examine the relationship between carbon emissions and the factors affecting them from macro and micro perspectives. From a macroscopic perspective, the relationship between carbon dioxide, energy resource consumption, energy prices, GDP (gross domestic product), waste generation, and recycling waste generation in the building and waste sectors has been verified. From a microscopic perspective, the impact of non-permanent electric appliances and stationary and non-stationary occupancy has been investigated. To verify the relationships, various kinds of statistical and data mining techniques were applied, such as the Granger causality test, linear and logarithmic correlation, and regression method. The results show that natural gas and electricity prices are higher than others, as coal impacts their consumption, and electricity and coal consumption were found to cause significant carbon emissions. Also, waste generation and recycling significantly increase and decrease emissions from the waste sector, respectively. Moreover, non-permanent appliances such as desktop computers and monitors consume a lot of electricity, and significant energy saving potential has been shown. Lastly, a linear relationship exists between buildings’ electricity use and total occupancy, but no significant relationship exists between occupancy and thermal loads, such as cooling and heating loads. These findings will potentially provide policymakers with a better understanding of and insights into carbon emission manipulation in the building sector.
ContributorsLee, Seungtaek (Author) / Chong, Oswald (Thesis advisor) / Sullivan, Kenneth (Committee member) / Tang, Pingbo (Committee member) / Arizona State University (Publisher)
Created2018
156922-Thumbnail Image.png
Description
The discipline of continuing professional development (CPD) is well defined and established within a variety of industries, such as medical, legal, and financial. The built environment is a less defined and mature industry with respect to educational pathways and professional education, with no uniform structure. Occupational licensing, such as registered

The discipline of continuing professional development (CPD) is well defined and established within a variety of industries, such as medical, legal, and financial. The built environment is a less defined and mature industry with respect to educational pathways and professional education, with no uniform structure. Occupational licensing, such as registered nurses, certified professional accountants, and others are well known within both their industries and the public. Additionally, occupational core-competencies are well established. Planning is a core skill set within the built environment and construction management. Definitions of the term “planning” vary quite broadly across the built environment, but generally includes activities such as risk identification, scope identification, and scheduling. Understanding how professionals in the built environment learn to plan is critical to meeting CPD needs for planning skills and the ability of a professional to “plan” effectively. Many planning tools and software have been developed, but often rely on an individual professional’s personal experiences and abilities. Limited literature in the field of professional education in the built environment has left a gap on the topic of how to train professionals in planning competencies. Survey results indicate that current training is not meeting the expectations of professionals, as only 16 percent of professionals are trained how to plan using their preferred method of learning. While on-the-job training is the primary format, the most preferred format is internal company training, but only 54 percent of companies provide this format. Mann-Whitney U and Kruskal Wallis tests were conducted and revealed that organizations with internal training programs have higher employee satisfaction with their organization’s planning process. Further, organizations with internal training programs are seen as having a more formal internal planning process. Research is needed to develop CPD within construction management and provide the foundation upon which a professional education structure can be created. An andragogically-centered schema for a heuristic approach to construction CPD is developed and tested on a seminar for pre-project planning. The full instructional design of the seminar using the model is disclosed and seminar results showed positive results and participants achieved high levels of learning.
ContributorsHurtado, Kristen (Author) / Sullivan, Kenneth (Thesis advisor) / Wiezel, Avi (Committee member) / Badger, William (Committee member) / Arizona State University (Publisher)
Created2018
157260-Thumbnail Image.png
Description
Deformation during hydration of concrete includes curling at joints and terminations. Previous research has explored mix designs, chemical additives, and other material factors to minimize slab distortion due to curling. This research study explores the development and use of externally applied silicone-based compounds after both the placing and

Deformation during hydration of concrete includes curling at joints and terminations. Previous research has explored mix designs, chemical additives, and other material factors to minimize slab distortion due to curling. This research study explores the development and use of externally applied silicone-based compounds after both the placing and cutting of joints. This exploratory study presents the results of controlled testing and a field study results that include distortion of contraction joints as measured with a Spectra LL300N under existing environmental conditions. Specifically, the study presents the results of a side-by-side test of two slabs, a base case, and a silicone-altered case, as well as field measures of two large commercial buildings using the developed methods. The results of the study show reduced distortion due to curling as compared to standard comparative slabs and warrant the continued exploration and testing of the concept.
ContributorsStandage, Richard Mc Rae (Author) / Ernzen, James (Thesis advisor) / Sullivan, Kenneth (Committee member) / Knutson, Kraig (Committee member) / Arizona State University (Publisher)
Created2019
134899-Thumbnail Image.png
Description
A public North American university needed a tool to automate their Vendor of Record rotation program. The goal was to give each vendor in the program fair opportunities and to be open and honest with how vendors were selected. This tool was created in Microsoft Excel with VBA to code

A public North American university needed a tool to automate their Vendor of Record rotation program. The goal was to give each vendor in the program fair opportunities and to be open and honest with how vendors were selected. This tool was created in Microsoft Excel with VBA to code macros. The three major Excel sheets are the Masters, the FM Interface, and the Executive Interface. The Masters act as a database and house data for each project. It is a plain Excel worksheet populated with tables. The FM Interface is a macro-enabled Excel workbook. It is distributed to every Facilities Manager in the program. The FM Interface communicates with the Masters in the background. The FMs use the various inputs and buttons to go through every step of procuring a project. They start by initializing a project, and are given a generated list of vendors who are qualified. This list is automatically rotated for every project. Then they fill in an RFQ and it is automatically emailed to the required vendors. When the Facilities Manager receives every quote, they input them into the program and they are saved to the database. When the project is complete, the manager must fill out a satisfaction survey to measure safety, cost, schedule, and quality of work. This is the main method of tracking vendor performance. The last sheet, the Executive Interface, is given only to the administrator of the program. It generates various reports, such as vendor performance, FM performance, and insurance status. It also has many administrative functions including insurance updating, vendor input, and delete project/vendor. The automated tool has been used without error on over 50 projects by 11 different Facilities Managers. The university's Facilities Management team is pleased with the automated process.
ContributorsSchneider, Steven Andrew (Author) / Sullivan, Kenneth (Thesis director) / Savicky, John (Committee member) / Mechanical and Aerospace Engineering Program (Contributor) / Barrett, The Honors College (Contributor)
Created2016-12
153835-Thumbnail Image.png
Description
Saudi Arabia has been having many issues with large construction projects such as delays, low performance and high cost. Some studies show that around 70% of the public projects in Saudi Arabia are delayed. These issues have resulted from many factors. One of the factors believed to be delaying projects

Saudi Arabia has been having many issues with large construction projects such as delays, low performance and high cost. Some studies show that around 70% of the public projects in Saudi Arabia are delayed. These issues have resulted from many factors. One of the factors believed to be delaying projects is the Saudi procurement system. The Saudi procurement system only selects contracts based on the lowest bid price offered. However, the Saudi procurement system has been found to not only produce delayed low quality projects, but also has resulted in higher costs.

This paper shows how to modify the Saudi procurement system by implementing a clarification phase, which is the most important phase in the Performance Information Procurement System (PIPS). The clarification phase requires the bid’s winning contractor to submit a project scope, a project schedule, to identify risks that not their responsibility, performance measurements and a milestone schedule. The PIPS system has been one of the most successful systems around the world and has shown a 98% success rate in six different countries with risks and cost reductions up to 30%.

This research conducted a survey of 157 engineers, 33 consultants, 9 owners, 5 vendors, 13 academics, and 28 architects to develop the public procurement system in Saudi Arabia. The participants work in government sectors with an interest in the Saudi Arabian procurement system. 80.61 % of participants believe that the traditional Saudi procurement system consistently selects poor performing contractors. Moreover, 95.97% of participants think that the selection of contractors based only on the lowest price criterion affects projects negatively. Also, 96.20% of participants in the survey feel that there needs to be a change in the traditional Saudi Arabian procurement system. 88.7% of participants agree to require the contractor to identify risks, and 96.03 % of participants agree that the contractors must have a plan. Moreover, 95.45% of participants agree to require a contractor review the scope of a project and verify that it is correct. Finally, 82.18% of participants agree to require a contractor to resolve all owner concerns before signing a contract to improve construction projects performance. The paper shows the need to change the Saudi procurement system and a solution to this growing problem.
ContributorsAlofi, Ahmed Abdulrahman (Author) / Kashiwagi, Dean (Thesis advisor) / Sullivan, Kenneth (Committee member) / Kashiwagi, Jacob (Committee member) / Arizona State University (Publisher)
Created2015