Matching Items (45)
Filtering by

Clear all filters

152178-Thumbnail Image.png
Description
The construction industry in India suffers from major time and cost overruns. Data from government and industry reports suggest that projects suffer from 20 to 25 percent time and cost overruns. Waste of resources has been identified as a major source of inefficiency. Despite a substantial increase in the past

The construction industry in India suffers from major time and cost overruns. Data from government and industry reports suggest that projects suffer from 20 to 25 percent time and cost overruns. Waste of resources has been identified as a major source of inefficiency. Despite a substantial increase in the past few years, demand for professionals and contractors still exceeds supply by a large margin. The traditional methods adopted in the Indian construction industry may not suffice the needs of this dynamic environment, as they have produced large inefficiencies. Innovative ways of procurement and project management can satisfy the needs aspired to as well as bring added value. The problems faced by the Indian construction industry are very similar to those faced by other developing countries. The objective of this paper is to discuss and analyze the economic concerns, inefficiencies and investigate a model that both explains the Indian construction industry structure and provides a framework to improve efficiencies. The Best Value (BV) model is examined as an approach to be adopted in lieu of the traditional approach. This could result in efficient construction projects by minimizing cost overruns and delays, which until now have been a rarity.
ContributorsNihas, Syed (Author) / Kashiwagi, Dean (Thesis advisor) / Sullivan, Kenneth (Committee member) / Kashiwagi, Jacob (Committee member) / Arizona State University (Publisher)
Created2013
152888-Thumbnail Image.png
Description
Owner organizations in the architecture, engineering, and construction (AEC) industry are presented with a wide variety of project delivery approaches. Implementation of these approaches, while enticing due to their potential to save money, reduce schedule delays, or improve quality, is extremely difficult to accomplish and requires a concerted change management

Owner organizations in the architecture, engineering, and construction (AEC) industry are presented with a wide variety of project delivery approaches. Implementation of these approaches, while enticing due to their potential to save money, reduce schedule delays, or improve quality, is extremely difficult to accomplish and requires a concerted change management effort. Research in the field of organizational behavior cautions that perhaps more than half of all organizational change efforts fail to accomplish their intended objectives. This study utilizes an action research approach to analyze change message delivery within owner organizations, model owner project team readiness and adoption of change, and identify the most frequently encountered types of resistance from lead project members. The analysis methodology included Spearman's rank order correlation, variable selection testing via three methods of hierarchical linear regression, relative weight analysis, and one-way ANOVA. Key findings from this study include recommendations for communicating the change message within owner organizations, empirical validation of critical predictors for change readiness and change adoption among project teams, and identification of the most frequently encountered resistive behaviors within change implementation in the AEC industry. A key contribution of this research is the recommendation of change management strategies for use by change practitioners.
ContributorsLines, Brian (Author) / Sullivan, Kenneth (Thesis advisor) / Wiezel, Avi (Committee member) / Badger, William (Committee member) / Arizona State University (Publisher)
Created2014
153080-Thumbnail Image.png
Description
Qualifications based selection (QBS) of construction services uses a variety of criteria to evaluate proponents and select a contractor for the project. The criteria typically fall into three categories: past performance and technical capability, key personnel, and price, with price often being considered the most important factor in selection. Evaluation

Qualifications based selection (QBS) of construction services uses a variety of criteria to evaluate proponents and select a contractor for the project. The criteria typically fall into three categories: past performance and technical capability, key personnel, and price, with price often being considered the most important factor in selection. Evaluation and the merits of the key personnel category is not well described or discussed in research. Prior research has investigated the evaluation criteria elements and their ability to differentiate proponents. This case study uses QBS evaluation data from fifty-eight construction projects to show that use of a structured interview process provides the highest level of differentiation of qualifications of proponents, as compared to the proposed price and the technical proposal. The results of the analysis also indicate: 1) the key personnel element (the interview) is statistically more important than price,

2) Contractors who propose on projects using QBS should use their best people in proposal response, and 3) Contractors should educate/prepare their teams for interviews, people count.
ContributorsSawyer, Jeff T (Author) / Sullivan, Kennth S (Thesis advisor) / Wiezel, Avi (Committee member) / Badger, William (Committee member) / Arizona State University (Publisher)
Created2014
149708-Thumbnail Image.png
Description
Semiconductor manufacturing facilities are very complex and capital intensive in nature. During the lifecycle of these facilities various disciplines come together, generate and use a tremendous amount of building and process information to support various decisions that enable them to successfully design, build and sustain these advanced facilities. However, a

Semiconductor manufacturing facilities are very complex and capital intensive in nature. During the lifecycle of these facilities various disciplines come together, generate and use a tremendous amount of building and process information to support various decisions that enable them to successfully design, build and sustain these advanced facilities. However, a majority of the information generated and processes taking place are neither integrated nor interoperable and result in a high degree of redundancy. The objective of this thesis is to build an interoperable Building Information Model (BIM) for the Base-Build and Tool Installation in a semiconductor manufacturing facility. It examines existing processes and data exchange standards available to facilitate the implementation of BIM and provides a framework for the development of processes and standards that can help in building an intelligent information model for a semiconductor manufacturing facility. To understand the nature of the flow of information between the various stakeholders the flow of information between the facility designer, process tool manufacturer and tool layout designer is examined. An information model for the base build and process tool is built and the industry standards SEMI E6 and SEMI E51 are used as a basis to model the information. It is found that applications used to create information models support interoperable industry standard formats such as the Industry Foundation Classes (IFC) and ISO 15926 in a limited manner. A gap analysis has revealed that interoperability standards applicable to the semiconductor manufacturing industry such as the IFC and ISO15926 need to be expanded to support information transfers unique to the industry. Information modeling for a semiconductor manufacturing facility is unique in that it is a process model (Process Tool Information Model) within a building model (Building Information Model), each of them supported more robustly by different interoperability standards. Applications support interoperability data standards specific to the domain or industry they serve but information transfers need to occur between the various domains. To facilitate flow of information between the different domains it is recommended that a mapping of the industry standards be undertaken and translators between them be developed for business use.
ContributorsPindukuri, Shruthi (Author) / Chasey, Allan D (Thesis advisor) / Wiezel, Avi (Committee member) / Mamlouk, Michael (Committee member) / Arizona State University (Publisher)
Created2011
149709-Thumbnail Image.png
Description
The price based marketplace has dominated the construction industry. The majority of owners use price based practices of management (expectation and decision making, control, direction, and inspection.) The price based/management and control paradigm has not worked. Clients have now been moving toward the best value environment (hire

The price based marketplace has dominated the construction industry. The majority of owners use price based practices of management (expectation and decision making, control, direction, and inspection.) The price based/management and control paradigm has not worked. Clients have now been moving toward the best value environment (hire contractors who know what they are doing, who preplan, and manage and minimize risk and deviation.) Owners are trying to move from client direction and control to hiring an expert and allowing them to do the quality control/risk management. The movement of environments changes the paradigm for the contractors from a reactive to a proactive, from a bureaucratic
on-accountable to an accountable position, from a relationship based
on-measuring to a measuring entity, and to a contractor who manages and minimizes the risk that they do not control. Years of price based practices have caused poor quality and low performance in the construction industry. This research identifies what is a best value contractor or vendor, what factors make up a best value vendor, and the methodology to transform a vendor to a best value vendor. It will use deductive logic, a case study to confirm the logic and the proposed methodology.
ContributorsPauli, Michele (Author) / Kashiwagi, Dean (Thesis advisor) / Sullivan, Kenneth (Committee member) / Badger, William (Committee member) / Arizona State University (Publisher)
Created2011
150955-Thumbnail Image.png
Description
Front end planning (FEP) is an essential and valuable process that helps identify risks early in the capital project planning phases. With effective FEP, risks can potentially be mitigated through development of detailed scope definition and subsequent efficient project resource use. The thesis describes the FEP process that has been

Front end planning (FEP) is an essential and valuable process that helps identify risks early in the capital project planning phases. With effective FEP, risks can potentially be mitigated through development of detailed scope definition and subsequent efficient project resource use. The thesis describes the FEP process that has been developed over the past twenty years by the Construction Industry Institute (CII). Specifically, it details the FEP tools developed for early project planning and the data gathered to analyze the tools used within the CII community. Data from a March 2011 survey are given showing the tools commonly used, how those tools are used and the common barriers faced that prohibit successful FEP implementation. The findings from in-depth interviews are also shared in the thesis. The interviews were used to gather detail responses from organizations on the implementation of their FEP processes. In total, out of the 116 CII organizations, 59 completed the survey and over 75 percent of the respondents used at least one CII tool in their front end planning processes. Of the 59 survey respondents, 12 organizations participated in the in-depth interviews. The thesis concludes that CII organizations continue to find value in CII FEP tools due to the increase tool usage. Also the thesis concludes that organizations must have strong management commitment, smart succession planning and a standardized planning process to increase the likelihood of successful FEP strategies.
ContributorsBosfield, Roberta Patrice (Author) / Gibson, G.Edward (Thesis advisor) / Wiezel, Avi (Committee member) / Ernzen, James (Committee member) / Arizona State University (Publisher)
Created2012
151157-Thumbnail Image.png
Description
Within the vast area of study in Organizational Change lays the industrial application of Change Management, which includes the understanding of both resisters and facilitators to organizational change. This dissertation presents an approach of gauging levels of change as it relates to both external and internal organization factors. The arena

Within the vast area of study in Organizational Change lays the industrial application of Change Management, which includes the understanding of both resisters and facilitators to organizational change. This dissertation presents an approach of gauging levels of change as it relates to both external and internal organization factors. The arena of such a test is given through the introduction of the same initiative change model, which attempts to improve transparency and accountability, across six different organizations where the varying results of change are measured. The change model itself consists of an interdisciplinary approach which emphasizes education of advanced organizational measurement techniques as fundamental drivers of converging change. The observations are documented in the real-time observed cased studies of six organizations as they progressed through the change process. This research also introduces a scaled metric for determining preliminary levels of change and endeavors to test both internal and external, or environmental, factors of change. A key contribution to the work is the analysis between both observed and surveyed data where a grounded theory analysis is used to help answer the question of what are factors of change in organizations. This work is considered to be foundational in real-time observational studies but has a promise for future additional contributions which would further elaborate on the phenomenon of prescribed organizational change.
ContributorsStone, Brian (Author) / Sullivan, Kenneth T. (Thesis advisor) / Verdini, William (Committee member) / Badger, William (Committee member) / Arizona State University (Publisher)
Created2012
155990-Thumbnail Image.png
Description
This article can be divided into six parts.

The first chapter analyzes the background, theatrical and particle reasons of this research. The author argues that the management of law firm needs a set of good system. The first one is operating the law firm in scale, and the other on

This article can be divided into six parts.

The first chapter analyzes the background, theatrical and particle reasons of this research. The author argues that the management of law firm needs a set of good system. The first one is operating the law firm in scale, and the other on is corporate management model, which shall be constructed in detail in the paper and will be put into practice by the law firm in which the author is worked.

The second chapter will introduce modern management theory, combining the situation of management in our law firm to analyze, raising some reasonable suggestions and instructions to promote our law firm to achieve the corporate management.

In the third chapter, the first chapter, starting with the review of the development process of foreign and our law firms, listing the organizational forms and the characteristics of our law firm, analyzing the situation and the drawbacks of the law firm management.

The fourth and fifth chapter introduce he background, the connotation of the corporate management model, listing the development and successful experience of some typical cases in respect of corporate management.

In the last chapter, the construction of corporate management model will be introduced in terms of organization form, human resource management and informationizing development.

The corporate management model is not mature in china. Though it is not easy to reform the existing model, but it should be believed that the development benefiting the legal industry will be achieved.
ContributorsZhu, Ping (Author) / Gu, Bin (Thesis advisor) / Chang, Chun (Thesis advisor) / Zhu, Ning (Committee member) / Arizona State University (Publisher)
Created2017
156035-Thumbnail Image.png
Description
The construction industry is performing poorly regarding project management and service delivery. On average, global projects are over-budget, delayed, and met with unsatisfactory results according to buyers. To mitigate poor performance, the project management career path has been heavily researched and continually developed over the last century. Despite the published

The construction industry is performing poorly regarding project management and service delivery. On average, global projects are over-budget, delayed, and met with unsatisfactory results according to buyers. To mitigate poor performance, the project management career path has been heavily researched and continually developed over the last century. Despite the published advances in project management approaches and tools, project performance continues to suffer. This research seeks to conduct an exploratory analysis of current project management and other approaches and determine how they affect project performance. Through a detailed literature search, the researcher identified a procurement model that is more heavily documented as high performing than all other approaches. The researcher proposed that this model may be a solution to assist project managers with the delivery of high performing services. The model is called the Best Value Approach (BVA). The BVA focuses on leadership, non-technical communication, quality assurance, and transparent project execution. To test the effectiveness of its practices, the researcher modified and adapted the BVA into a project management approach and tested it on a large-scale government project. During the case study test, the researcher observed that there were two primary project management roles in the supply chain; the buyer’s and vendor’s project managers. The case study resulted in the large government organization receiving more work and increased their satisfaction of the work received by 22 percent from the previous year. To further test the project management adapted BVA, the researcher conducted a classroom case-study in which students learned and implemented the BVA practices on real-time, small-scale industry projects. Results include cost savings of $100,000 for 10 companies over 24 projects, cost avoidance of over $4.5M, and a 9.8/10 customer satisfaction [in terms of the companies’ satisfaction with the deliverables produced on each project]. These results suggest that the BVA practices may effectively improve the performance of project delivery, and may be a viable new project management approach to train future project managers. Out of the two project manager roles, it is proposed that the buyer’s project manager may receive the most benefit. Additional research is needed on the other approaches to compare quantitative project performance, and run repeated testing on the potential new project management approach.
ContributorsRivera, Alfredo Octavio (Author) / Badger, William (Thesis advisor) / Sullivan, Kenneth (Thesis advisor) / Kashiwagi, Jacob S (Committee member) / Arizona State University (Publisher)
Created2017
157437-Thumbnail Image.png
Description
The success or failure of projects is not determined only by procedures, tasks, and technologies, but also by the project team and its effectiveness. In order to lead project teams towards successful outcomes, project managers must maintain high quality relationships in the workplace. When looking at employees’ relationships in the

The success or failure of projects is not determined only by procedures, tasks, and technologies, but also by the project team and its effectiveness. In order to lead project teams towards successful outcomes, project managers must maintain high quality relationships in the workplace. When looking at employees’ relationships in the workplace, Social Exchange Theory introduces two types of exchanges: employee-organization and leader-member exchanges. While both types of exchanges focus exclusively on the employee’s longitudinal relationships, the interpersonal relationships among the team members are usually overlooked.

This research presents the results of a quantitative study of the interpersonal relationships of 327 project managers and assistant project managers in their workplace. Specifically, the study investigates if the quality of the relationship with particular stakeholders, such as one’s immediate supervisor (boss), peers, or subordinates, drives the individual’s quality of the relationship with other stakeholders.

Contrary to the expectations, in strictly hierarchical organizations (one direct supervisor), there is no significant correlation between the quality of relationships with the boss and the overall quality of the individual’s relationships. However, in the case of matrix organizations (two or three bosses), there are significant correlations between several variables such as the quality of the relationship, perceived importance and the time spent with each stakeholder, as well the inclination of the participant towards leadership actions. The driving relationship in matrix organizations is the one with “the most important peer”.
ContributorsK. Jamali, M. Hossein (Author) / Wiezel, Avi (Thesis advisor) / Sullivan, Kenneth T. (Committee member) / Badger, William (Committee member) / Arizona State University (Publisher)
Created2019