The goal of this research study was to identify the competencies the Project Manager (PM) will need to respond to the challenges the construction industry faces in 2022 and beyond. The study revealed twenty-one emerging challenges for construction PMs grouped into four primary disruptive forces: workforce demographics, globalization, rapidly evolving

The goal of this research study was to identify the competencies the Project Manager (PM) will need to respond to the challenges the construction industry faces in 2022 and beyond. The study revealed twenty-one emerging challenges for construction PMs grouped into four primary disruptive forces: workforce demographics, globalization, rapidly evolving technology, and changing organizational structures. The future PM will respond to these emerging challenges using a combination of fourteen competencies. The competencies are grouped into four categories: technical (multi-disciplined, practical understanding of technology), management (keen business insight, understanding of project management, knowledge network building, continuous risk monitoring), cognitive (complex decisions making, emotional maturity, effective communication), and leadership (leveraging diverse thinking, building relationships, engaging others, mentoring, building trust). Popular data collection methods used in project management research, such as surveys and interviews, have received criticism about the differences between stated responses to questions, what respondents say they will do, and revealed preferences, what they actually practice in the workplace. Rather than relying on surveys, this research study utilized information generated from games and exercises bundled into one-day training seminars conducted by Construction Industry Institute (CII) companies for current and upcoming generations of PMs. Educational games and exercises provide participants with the opportunity to apply classroom learning and workplace experience to resolve issues presented in real-world scenarios, providing responses that are more closely aligned with the actual decisions and activities occurring on projects. The future competencies were identified by combining results of the literature review with information from the games and exercises through an iterative cycle of data mining, analysis, and consolidation review sessions with CII members. This competency forecast will be used as a basis for company recruiting and to create tools for professional development programs and project management education at the university level. In addition to the competency forecast, the research identified simulation games and exercises as components of a project management development program in a classroom setting. An instrument that links the emerging challenges with the fourteen competencies and learning tools that facilitate the mastering of these competencies has also been developed.
ContributorsKing, Cynthia Joyce (Author) / Wiezel, Avi (Thesis advisor) / Badger, William (Committee member) / Sullivan, Kenneth (Committee member) / Arizona State University (Publisher)
Created2012
149708-Thumbnail Image.png
Description
Semiconductor manufacturing facilities are very complex and capital intensive in nature. During the lifecycle of these facilities various disciplines come together, generate and use a tremendous amount of building and process information to support various decisions that enable them to successfully design, build and sustain these advanced facilities. However, a

Semiconductor manufacturing facilities are very complex and capital intensive in nature. During the lifecycle of these facilities various disciplines come together, generate and use a tremendous amount of building and process information to support various decisions that enable them to successfully design, build and sustain these advanced facilities. However, a majority of the information generated and processes taking place are neither integrated nor interoperable and result in a high degree of redundancy. The objective of this thesis is to build an interoperable Building Information Model (BIM) for the Base-Build and Tool Installation in a semiconductor manufacturing facility. It examines existing processes and data exchange standards available to facilitate the implementation of BIM and provides a framework for the development of processes and standards that can help in building an intelligent information model for a semiconductor manufacturing facility. To understand the nature of the flow of information between the various stakeholders the flow of information between the facility designer, process tool manufacturer and tool layout designer is examined. An information model for the base build and process tool is built and the industry standards SEMI E6 and SEMI E51 are used as a basis to model the information. It is found that applications used to create information models support interoperable industry standard formats such as the Industry Foundation Classes (IFC) and ISO 15926 in a limited manner. A gap analysis has revealed that interoperability standards applicable to the semiconductor manufacturing industry such as the IFC and ISO15926 need to be expanded to support information transfers unique to the industry. Information modeling for a semiconductor manufacturing facility is unique in that it is a process model (Process Tool Information Model) within a building model (Building Information Model), each of them supported more robustly by different interoperability standards. Applications support interoperability data standards specific to the domain or industry they serve but information transfers need to occur between the various domains. To facilitate flow of information between the different domains it is recommended that a mapping of the industry standards be undertaken and translators between them be developed for business use.
ContributorsPindukuri, Shruthi (Author) / Chasey, Allan D (Thesis advisor) / Wiezel, Avi (Committee member) / Mamlouk, Michael (Committee member) / Arizona State University (Publisher)
Created2011
150085-Thumbnail Image.png
Description
The wood-framing trade has not sufficiently been investigated to understand the work task sequencing and coordination among crew members. A new mental framework for a performing crew was developed and tested through four case studies. This framework ensured similar team performance as the one provided by task micro-scheduling in planning

The wood-framing trade has not sufficiently been investigated to understand the work task sequencing and coordination among crew members. A new mental framework for a performing crew was developed and tested through four case studies. This framework ensured similar team performance as the one provided by task micro-scheduling in planning software. It also allowed evaluation of the effect of individual coordination within the crew on the crew's productivity. Using design information, a list of micro-activities/tasks and their predecessors was automatically generated for each piece of lumber in the four wood frames. The task precedence was generated by applying elementary geometrical and technological reasoning to each frame. Then, the duration of each task was determined based on observations from videotaped activities. Primavera's (P6) resource leveling rules were used to calculate the sequencing of tasks and the minimum duration of the whole activity for various crew sizes. The results showed quick convergence towards the minimum production time and allowed to use information from Building Information Models (BIM) to automatically establish the optimal crew sizes for frames. Late Start (LS) leveling priority rule gave the shortest duration in every case. However, the logic of LS tasks rule is too complex to be conveyed to the framing crew. Therefore, the new mental framework of a well performing framer was developed and tested to ensure high coordination. This mental framework, based on five simple rules, can be easily taught to the crew and ensures a crew productivity congruent with the one provided by the LS logic. The case studies indicate that once the worst framer in the crew surpasses the limit of 11% deviation from applying the said five rules, every additional percent of deviation reduces the productivity of the whole crew by about 4%.
ContributorsMaghiar, Marcel M (Author) / Wiezel, Avi (Thesis advisor) / Mitropoulos, Panagiotis (Committee member) / Cooke, Nancy J. (Committee member) / Arizona State University (Publisher)
Created2011