Matching Items (4)
Filtering by

Clear all filters

153080-Thumbnail Image.png
Description
Qualifications based selection (QBS) of construction services uses a variety of criteria to evaluate proponents and select a contractor for the project. The criteria typically fall into three categories: past performance and technical capability, key personnel, and price, with price often being considered the most important factor in selection. Evaluation

Qualifications based selection (QBS) of construction services uses a variety of criteria to evaluate proponents and select a contractor for the project. The criteria typically fall into three categories: past performance and technical capability, key personnel, and price, with price often being considered the most important factor in selection. Evaluation and the merits of the key personnel category is not well described or discussed in research. Prior research has investigated the evaluation criteria elements and their ability to differentiate proponents. This case study uses QBS evaluation data from fifty-eight construction projects to show that use of a structured interview process provides the highest level of differentiation of qualifications of proponents, as compared to the proposed price and the technical proposal. The results of the analysis also indicate: 1) the key personnel element (the interview) is statistically more important than price,

2) Contractors who propose on projects using QBS should use their best people in proposal response, and 3) Contractors should educate/prepare their teams for interviews, people count.
ContributorsSawyer, Jeff T (Author) / Sullivan, Kennth S (Thesis advisor) / Wiezel, Avi (Committee member) / Badger, William (Committee member) / Arizona State University (Publisher)
Created2014
154179-Thumbnail Image.png
Description
In today's era a lot of the construction projects suffer from time delay, cost overrun and quality defect. Incentive provisions are found to be a contracting strategy to address this potential problem. During last decade incentive mechanisms have gained importance, and they are starting to become adopted in the construction

In today's era a lot of the construction projects suffer from time delay, cost overrun and quality defect. Incentive provisions are found to be a contracting strategy to address this potential problem. During last decade incentive mechanisms have gained importance, and they are starting to become adopted in the construction projects. Most of the previous research done in this area was purely qualitative, with a few quantitative studies. This study aims to quantify the performance of incentives in construction by collecting the data from more than 30 projects in United States through a questionnaire survey. First, literature review addresses the previous research work related to incentive types, incentives in construction industry, incentives in other industry and benefits of incentives. Second, the collected data is analyzed with statistical methods to test the significance of observed changes between two data sets i.e. incentive projects and non-incentive projects. Finally, the analysis results provide evidence for the significant impact of having incentives; reduced the cost and schedule growth in construction projects in United States.
ContributorsPaladugu, Bala Sai Krishna (Author) / El Asmar, Mounir (Thesis advisor) / Ernzen, James (Committee member) / Sullivan, Kenneth (Committee member) / Arizona State University (Publisher)
Created2015
149457-Thumbnail Image.png
Description
Front End Planning (FEP) is a critical process for uncovering project unknowns, while developing adequate scope definition following a structured approach for the project execution process. FEP for infrastructure projects assists in identifying and mitigating issues such as right-of-way concerns, utility adjustments, environmental hazards, logistic problems, and permitting requirements. This

Front End Planning (FEP) is a critical process for uncovering project unknowns, while developing adequate scope definition following a structured approach for the project execution process. FEP for infrastructure projects assists in identifying and mitigating issues such as right-of-way concerns, utility adjustments, environmental hazards, logistic problems, and permitting requirements. This thesis describes a novel and effective risk management tool that has been developed by the Construction Industry Institute (CII) called the Project Definition Rating Index (PDRI) for infrastructure projects. Input from industry professionals from over 30 companies was used in the tool development which is specifically focused on FEP. Data from actual projects are given showing the efficacy of the tool. Critical success factors for FEP of infrastructure projects are shared. The research shows that a finite and specific list of issues related to scope definition of infrastructure projects can be developed. The thesis also concludes that the PDRI score indicates the current level of scope definition and corresponds to project performance. Infrastructure projects with low PDRI scores outperform projects with high PDRI scores.
ContributorsBingham, Evan Dale (Author) / Gibson Jr., G. Edward (Thesis advisor) / Badger, William (Committee member) / Ariaratnam, Samuel (Committee member) / Arizona State University (Publisher)
Created2010
149322-Thumbnail Image.png
Description
The U.S. Army Medical Command has been testing a leadership based structure to increase the performance of delivering construction and facility services in its system of $600M of construction and 26 major hospital facilities in the U.S. The organizational requirement was to minimize the management and oversight of contractors

The U.S. Army Medical Command has been testing a leadership based structure to increase the performance of delivering construction and facility services in its system of $600M of construction and 26 major hospital facilities in the U.S. The organizational requirement was to minimize the management and oversight of contractors and simultaneously increase project performance. The research proposes that a leadership based structure can supplement the perception, preplanning, and risk minimization capability of a contractor's project manager, thus increasing the project performance (on time, within budget, and meeting expectations) and decreasing client management requirement. The projects were delivered in a best value and low price environment. The major impact of this research was that proactive management by contractors was more effective than traditional management such as direction, control, and inspection by client's professional representatives. The results based on data collection and date analyses validated that a leadership based structure can increase the performance of an organization and reduce its management requirement.
ContributorsMalhotra, Neha (Author) / Kashiwagi, Dean T. (Thesis advisor) / Sullivan, Kenneth (Committee member) / Badger, William (Committee member) / Arizona State University (Publisher)
Created2010