This administrative history of the Grand Canyon Dam Adaptive Management Program (GCDAMP) includes government reports, oral history interviews and other relevant information about Colorado River law, environmental protection law, hydropower regulation, the Glen Canyon Environmental Studies that served as a precursor to GCDAMP, and the activities of the Adaptive Management Work Group, the Technical Work Group, and the U.S. Geological Survey’s Grand Canyon Monitoring and Research Center.

Displaying 1 - 3 of 3
Filtering by

Clear all filters

149126-Thumbnail Image.png
Description

The operation of Glen Canyon Dam on the Colorado River affects several downstream resources and water uses including water supply for consumptive uses in Arizona, California, and Nevada, hydroelectric power production, endangered species of native fish, recreational angling for non-native fish, and recreational boating in the Grand Canyon. Decisions about

The operation of Glen Canyon Dam on the Colorado River affects several downstream resources and water uses including water supply for consumptive uses in Arizona, California, and Nevada, hydroelectric power production, endangered species of native fish, recreational angling for non-native fish, and recreational boating in the Grand Canyon. Decisions about the magnitude and timing of water releases through the dam involve trade-offs between these resources and uses. The numerous laws affecting dam operations create a hierarchy of legal priorities that should govern these decisions. At the top of the hierarchy are mandatory requirements for water storage and delivery and for conservation of endangered species. Other resources and water uses have lower legal priorities. The Glen Canyon Dam Adaptive Management Program ("AMP") has substituted collaborative decision making among stakeholders for the hierarchy of priorities created by law. The AMP has thereby facilitated non-compliance with the Endangered Species Act by the Bureau of Reclamation, which operates the dam, and has effectively given hydroelectric power production and non-native fisheries higher priorities than they are legally entitled to. Adaptive management is consistent with the laws governing operation of Glen Canyon Dam, but collaborative decision making is not. Nor is collaborative decision making an essential, or even logical, component of adaptive management. As implemented in the case of Glen Canyon Dam, collaborative decision making has actually stifled adaptive management by making agreement among stakeholders a prerequisite to changes in the operation of the dam. This Article proposes a program for adaptive, but not collaborative, management of Glen Canyon Dam that would better conform to the law and would be more amenable to adaptation and experimentation than would the current, stakeholder-centered program.

ContributorsFeller, Joseph M. (Author)
Created2008-07-18
149132-Thumbnail Image.png
Description

River rafting trips and hikers use sandbars along the Colorado River in Marble and Grand Canyons as campsites. The U.S. Geological Survey evaluated the effects of Glen Canyon Dam operations on campsite areas on sandbars along the Colorado River in Grand Canyon National Park. Campsite area was measured annually from

River rafting trips and hikers use sandbars along the Colorado River in Marble and Grand Canyons as campsites. The U.S. Geological Survey evaluated the effects of Glen Canyon Dam operations on campsite areas on sandbars along the Colorado River in Grand Canyon National Park. Campsite area was measured annually from 1998 to 2012 at 37 study sites between Lees Ferry and Diamond Creek, Arizona. The primary purpose of this report is to present the methods and results of the project.

Campsite area surveys were conducted using total station survey methods to outline the perimeter of camping area at each study site. Campsite area is defined as any region of smooth substrate (most commonly sand) with no more than an 8 degree slope and little or no vegetation. We used this definition, but relaxed the slope criteria to include steeper areas near boat mooring locations where campers typically establish their kitchens.

The results show that campsite area decreased over the course of the study period, but at a rate that varied by elevation zone and by survey period. Time-series plots show that from 1998 to 2012, high stage-elevation (greater than the 25,000 ft3/s stage-elevation) campsite area decreased significantly, although there was no significant trend in low stage-elevation (15,000–20,000 ft3/s) campsite area. High stage-elevation campsite area increased after the 2004 and 2008 high flows, but decreased in the intervals between high flows. Although no overall trend was detected for low stage-elevation campsite areas, they did increase after high-volume dam releases equal to or greater than about 20,000 ft3/s. We conclude that dam operations have not met the management objectives of the Glen Canyon Adaptive Management program to increase the size of camping beaches in critical and non-critical reaches of the Colorado River between Glen Canyon Dam and Lake Mead.

ContributorsKaplinski, Matt (Author) / Hazel, Joe (Author) / Parnell, Rod (Author) / Hadley, Daniel R. (Author) / Grams, Paul (Author)
Created2014-07
149134-Thumbnail Image.png
Description

It is apparent that before emplacement of the dam gully degradation in terraces was restored by periodic alluvial deposition from river floods, but perhaps even more important is the redistribution of flood sands onto higher terraces by wind. Thus, we propose the term "restorative base-level hypothesis" to emphasize the dynamic

It is apparent that before emplacement of the dam gully degradation in terraces was restored by periodic alluvial deposition from river floods, but perhaps even more important is the redistribution of flood sands onto higher terraces by wind. Thus, we propose the term "restorative base-level hypothesis" to emphasize the dynamic equilibrium between gully erosion and renewed deposition, a process that remains active in Cataract Canyon but is disrupted in Grand Canyon by the presence and operation of the dam.

We developed type geomorphic settings to develop a conceptual process model for the diverse small-catchment geomorphic system in Grand Canyon. Research findings explain how streams are able to cross broad, flat terraces given a rainfall event and how they become progressively more integrated with the river. The primary channelization processes are ponding and overflow, alluvial fan progradation, and infiltration and piping, all of which contribute to nickpoint migration. An understanding of these processes was essential to building the geomorphic model.

The predictive mathematical model quantifies erosional vulnerability by applying a hypothetical rainfall event of 25 mm/hour onto a catchment above a "pristine" terrace sequence. The principal driving factor for erosion is basin area. The principal resisting factor for erosion is terrace diffusion capacity, which is a function of terrace sand cross-sectional area and infiltration capacity. Several important modifying factors are applied to the basic model to determine relative vulnerability of each terrace to gully erosion. Vulnerability of the top terrace at each catchment is plotted against the measured amount of gully erosion in that terrace, providing a base line against which progressive changes in gully depth can be easily monitored in the future.

Field studies and research show that: (1) gully erosion of terraces has been severe during the past 20 years in Grand Canyon due to unusually high precipitation; and (2) sediment deprivation coupled with the lack of large annual floods has caused a reduction in restorative (depositional) factors. Continued measurement and documentation of geomorphic processes in catchments, particularly at type geomorphic settings, will further refine and verify the predictability of the model. We conclude that beach-habitat-building flows are essential for initiating natural restorative processes and that one of the most important processes in gully mitigation may be eolian reworking of newly deposited flood sands onto higher terraces. Prior to the construction of Glen Canyon Dam, gully-deepening and river/wind depositional processes were in dynamic equilibrium, allowing the preservation of ancient cultural sites for the past several thousand years.

ContributorsThompson, Kate S. (Editor) / Potochnik, Andre R. (Editor)
Created2000-02-18