This administrative history of the Grand Canyon Dam Adaptive Management Program (GCDAMP) includes government reports, oral history interviews and other relevant information about Colorado River law, environmental protection law, hydropower regulation, the Glen Canyon Environmental Studies that served as a precursor to GCDAMP, and the activities of the Adaptive Management Work Group, the Technical Work Group, and the U.S. Geological Survey’s Grand Canyon Monitoring and Research Center.

Displaying 1 - 3 of 3
Filtering by

Clear all filters

149126-Thumbnail Image.png
Description

The operation of Glen Canyon Dam on the Colorado River affects several downstream resources and water uses including water supply for consumptive uses in Arizona, California, and Nevada, hydroelectric power production, endangered species of native fish, recreational angling for non-native fish, and recreational boating in the Grand Canyon. Decisions about

The operation of Glen Canyon Dam on the Colorado River affects several downstream resources and water uses including water supply for consumptive uses in Arizona, California, and Nevada, hydroelectric power production, endangered species of native fish, recreational angling for non-native fish, and recreational boating in the Grand Canyon. Decisions about the magnitude and timing of water releases through the dam involve trade-offs between these resources and uses. The numerous laws affecting dam operations create a hierarchy of legal priorities that should govern these decisions. At the top of the hierarchy are mandatory requirements for water storage and delivery and for conservation of endangered species. Other resources and water uses have lower legal priorities. The Glen Canyon Dam Adaptive Management Program ("AMP") has substituted collaborative decision making among stakeholders for the hierarchy of priorities created by law. The AMP has thereby facilitated non-compliance with the Endangered Species Act by the Bureau of Reclamation, which operates the dam, and has effectively given hydroelectric power production and non-native fisheries higher priorities than they are legally entitled to. Adaptive management is consistent with the laws governing operation of Glen Canyon Dam, but collaborative decision making is not. Nor is collaborative decision making an essential, or even logical, component of adaptive management. As implemented in the case of Glen Canyon Dam, collaborative decision making has actually stifled adaptive management by making agreement among stakeholders a prerequisite to changes in the operation of the dam. This Article proposes a program for adaptive, but not collaborative, management of Glen Canyon Dam that would better conform to the law and would be more amenable to adaptation and experimentation than would the current, stakeholder-centered program.

ContributorsFeller, Joseph M. (Author)
Created2008-07-18
149137-Thumbnail Image.png
Description

Vegetation changes in the canyon of the Colorado River between Glen Canyon Dam and Lake Mead were studied by comparing photo­ graphs taken prior to the completion of the Glen Canyon Dam in 1963 with those taken afterwards at the same sites. The old photo­ graphs, taken by J. K.

Vegetation changes in the canyon of the Colorado River between Glen Canyon Dam and Lake Mead were studied by comparing photo­ graphs taken prior to the completion of the Glen Canyon Dam in 1963 with those taken afterwards at the same sites. The old photo­ graphs, taken by J. K. Millers, T. H. O'Sullivan, William Bell, F. A. Nims, R. B. Stanton, N. W. Carkhuff, N. H. Darton, L. R. Freeman, E. C. LaRue, and others, document conditions as they were between 1872 and 1963. In general, the older pictures show an absence of riparian plants along the banks of the river. The new photographs of each pair were taken in 1972 through 1976. The most obvious vege­tation change revealed by the photograph comparison is the in­ creased density of many species. Exotic species, such as saltcedar and camelthorn, and native riparian plants, such as sandbar willow, arrowweed, desert broom, and cattail, now form a new riparian com­munity along much of the channel of the Colorado River between Glen Canyon Dam and the Grand Wash Cliffs.

The matched photographs also reveal that changes have occurred in the amount of sand and silt deposited along the banks. The photo­ graphs show that in some areas erosion has been significant since the time of the earlier photograph while at other locations sediment has accumulated on river bars and terraces. Detailed maps are presented showing distribution of 25 plant species. Some of these, such as Russian olive and elm, were unknown along the Grand Canyon reach of the Colorado River before 1976.

Relevant data are presented to show changes in the hydrologic regime since completion of Glen Canyon Dam. Flooding, as expressed by annual maximum stage, has decreased in amplitude, and its sea­ son of occurrence has changed from spring (May-June) to a longer period from April through October. Dam construction has had a moderating influence on several other hydrologic variables. Com­pared to the predam era, discharge through the year now varies within narrow limits, changing little from month to month or season to season; annual maximum discharges are now strikingly uniform, and sediment load has materially decreased. Increases have occurred in some characteristics, however, such as daily variation in river stage and median discharge.

The interaction of decreased flooding, decreased sediment load, and increased riparian plant coverage makes the future of existing river fans, bars, and terraces uncertain. The establishment of a new ecological equilibrium at the bottom of the Grand Canyon may re­ quire many decades.

ContributorsTurner, Raymond M. (Author) / Karpiscak, Martin M. (Author)
Created1980
ContributorsJames, Leslie (Interviewee)
Created2019-08-21