This growing collection consists of scholarly works authored by ASU-affiliated faculty, staff, and community members, and it contains many open access articles. ASU-affiliated authors are encouraged to Share Your Work in KEEP.

Displaying 1 - 10 of 26
Filtering by

Clear all filters

127911-Thumbnail Image.png
Description

This study dealt with emotional responses elicited by certain products, which helped to understand the attributes of the product leading to emotional responses. Emotional Design is a way of design that is using emotions generated by people as reference and measurement. Making good use of emotional design could let the

This study dealt with emotional responses elicited by certain products, which helped to understand the attributes of the product leading to emotional responses. Emotional Design is a way of design that is using emotions generated by people as reference and measurement. Making good use of emotional design could let the user discover resonance in the interaction between user and product, which could help the product to be more attractive to users. This research proposes to apply qualitative research method to uncover the secrets of emotional bonds between users and products This study also offered an useful tool to examine the strength and weakness of a certain product from perspective of emotion, and the insights could help designers to refine the product to become emotional attractive, thus create better user experience and bigger opportunity for the product on the market in the future.

ContributorsShin, Dosun (Author) / Wang, Zheng (Author) / Herberger Institute for Design and the Arts (Contributor)
Created2015-10-23
Description

The image of “Shostakovich” and the relationships surrounding it in the West during the Cold War can be viewed from several angles. Selected Cold War encounters between the United States and the Soviet Union involving Shostakovich’s music—especially the 1959 New York Philharmonic tour to the USSR—offer insight into three perspectives

The image of “Shostakovich” and the relationships surrounding it in the West during the Cold War can be viewed from several angles. Selected Cold War encounters between the United States and the Soviet Union involving Shostakovich’s music—especially the 1959 New York Philharmonic tour to the USSR—offer insight into three perspectives on Shostakovich symphonies in the Cold War: (1) the direct, (2) the implicit, and (3) the micro/intimate. This heuristic hones our understanding of the various types of relationships cultivated with music during the Cold War, while also widening the discussion of Shostakovich’s symbolic presentation during the conflict.

ContributorsSchmelz, Peter (Contributor) / Herberger Institute for Design and the Arts (Contributor)
Created2015-04-03
128731-Thumbnail Image.png
Description

An urban forest assessment is essential for developing a baseline from which to measure changes and trends. The most precise way to assess urban forests is to measure and record every tree on a site, but although this may work well for relatively small populations (e.g., street trees, small parks),

An urban forest assessment is essential for developing a baseline from which to measure changes and trends. The most precise way to assess urban forests is to measure and record every tree on a site, but although this may work well for relatively small populations (e.g., street trees, small parks), it is prohibitively expensive for large tree populations. Thus, random sampling offers a cost-effective way to assess urban forest structure and the associated ecosystem services for large-scale assessments. The methodology applied to assess ecosystem services in this study can also be used to assess the ecosystem services provided by vacant land in other urban contexts and improve urban forest policies, planning, and the management of vacant land. The study’s findings support the inclusion of trees on vacant land and contribute to a new vision of vacant land as a valuable ecological resource by demonstrating how green infrastructure can be used to enhance ecosystem health and promote a better quality of life for city residents.

ContributorsKim, Gunwoo (Author) / Herberger Institute for Design and the Arts (Contributor)
Created2016-07-16
127885-Thumbnail Image.png
Description

Research has shown that construction projects in Saudi Arabia have exhibited poor performance for the past three decades. The traditional risk management practices have been ineffective at helping contractors deliver projects on time and within budget while meeting quality expectations. Studies have identified that client decision making is one of

Research has shown that construction projects in Saudi Arabia have exhibited poor performance for the past three decades. The traditional risk management practices have been ineffective at helping contractors deliver projects on time and within budget while meeting quality expectations. Studies have identified that client decision making is one of the main causes of risks that occur on projects in Saudi Arabia. This paper proposes a new risk management model that can minimize client decision making, and enable the client to utilize expertise, thereby improving project quality and performance. The model is derived from the Information Measurement Theory (IMT) and Performance Information Procurement System (PIPS), both developed at Arizona State University in the United States (U.S.). The model has been tested over 1800 times in both construction and non-construction projects, showing a decrease in required management by owner by up to 80% and an increase in efficiency up to 40%.

ContributorsAlgahtany, Mohammed (Author) / Alhammadi, Yasir (Author) / Kashiwagi, Dean (Author) / Ira A. Fulton School of Engineering (Contributor)
Created2016-05-20
127879-Thumbnail Image.png
Description

Brazil has had issues in efficiently providing the required amount of electricity to its citizens at a low cost. One of the main causes to the decreasing performance of energy is due to reoccurring droughts that decrease the power generated by hydroelectric facilities. To compensate for the decrease, Brazil brought

Brazil has had issues in efficiently providing the required amount of electricity to its citizens at a low cost. One of the main causes to the decreasing performance of energy is due to reoccurring droughts that decrease the power generated by hydroelectric facilities. To compensate for the decrease, Brazil brought into use thermal power plants. The power plants being on average 23.7% more expensive than hydroelectric. Wind energy is potentially an alternative source of energy to compensate for the energy decrease during droughts. Brazil has invested in wind farms recently, but, due to issues with the delivery method, only 34% of wind farms are operational. This paper reviews the potential benefit Brazil could receive from investing more resources into developing and operating wind farms. It also proposes that utilization of the best value approach in delivering wind farms could produce operational wind farms quicker and more efficiently than previously experienced.

ContributorsOliveira, Carlos (Author) / Zulanas, Charles (Author) / Kashiwagi, Dean (Author) / Ira A. Fulton School of Engineering (Contributor)
Created2016-05-20
127852-Thumbnail Image.png
Description

Delays are a major cause for concern in the construction industry in Saudi Arabia. This paper identifies the main causes of delay in infrastructure projects in Mecca, Saudi Arabia, and compares these with projects around the country and other Gulf countries. Data was obtained from 49 infrastructure projects undertaken by

Delays are a major cause for concern in the construction industry in Saudi Arabia. This paper identifies the main causes of delay in infrastructure projects in Mecca, Saudi Arabia, and compares these with projects around the country and other Gulf countries. Data was obtained from 49 infrastructure projects undertaken by the owner and were analyzed quantitatively to understand the severity and causes of delay. 10 risk factors were identified and were grouped into four categories. Average delay in infrastructure projects in Mecca was found to be 39%. The most severe cause of delay was found to be the land acquisition factor. This highlights the critical land ownership and acquisition issues that are prevailing in the city. Additionally, other factors that contribute to delay include contractors’ lack of expertise, re-designing, and haphazard underground utilities (line services). It is concluded that the majority of project delays were caused from the owner's side as compared to contractors, consultants, and other project's stakeholders. This finding matched with the research findings of the Gulf Countries Construction (GCC) Industry's literature. This study fills an important practice and research gap for improving the efficiency in delivering infrastructure projects in the holy city of Mecca and Gulf countries at large.

ContributorsElawi, Ghazi (Author) / Algahtany, Mohammed (Author) / Kashiwagi, Dean (Author) / Ira A. Fulton School of Engineering (Contributor)
Created2016-05-20
127847-Thumbnail Image.png
Description

This paper is part of doctoral research to improve the current Saudi Arabian (SA) procurement system. SA has the largest construction market in the Middle East. However, the use of the traditional procurement system in SA has been identified as one of the causes for poor performance in the delivery

This paper is part of doctoral research to improve the current Saudi Arabian (SA) procurement system. SA has the largest construction market in the Middle East. However, the use of the traditional procurement system in SA has been identified as one of the causes for poor performance in the delivery of construction. The system has been identified as a major risk to the SA government, due to consistent increased costs and delays of up to 70% on projects. A survey was conducted with 1396 participants including engineers, buyers, contractors, consultants, academics, and architects. The purpose of the survey was to identify the validity of the recent claims that the procurement system in SA is broken. The participants work in both the private and government sectors. The survey results showed that the procurement system is a major risk to projects, affects construction projects negatively, and is in need of improvement.

ContributorsAlofi, Ahmed (Author) / Kashiwagi, Jacob (Author) / Kashiwagi, Dean (Author) / Ira A. Fulton Schools of Engineering (Contributor)
Created2016-05-20
127834-Thumbnail Image.png
Description

Communicating climate risks is crucial when engaging the public to support climate action planning and addressing climate justice. How does evidence-based communication influence local residents’ risk perception and potential behavior change in support of climate planning? Built upon our previous study of Climate Justice maps illustrating high scores of both

Communicating climate risks is crucial when engaging the public to support climate action planning and addressing climate justice. How does evidence-based communication influence local residents’ risk perception and potential behavior change in support of climate planning? Built upon our previous study of Climate Justice maps illustrating high scores of both social and ecological vulnerability in Michigan’s Huron River watershed, USA, a quasi-experiment was conducted to examine the effects of Climate Justice mapping intervention on residents’ perceptions and preparedness for climate change associated hazards in Michigan. Two groups were compared: residents in Climate Justice areas with high social and ecological vulnerability scores in the watershed (n=76) and residents in comparison areas in Michigan (n=69). Measurements for risk perception include perceived exposure, sensitivity, and adaptability to hazards. Results indicate that risk information has a significant effect on perceived sensitivity and level of preparedness for future climate extremes among participants living in Climate Justice areas. Findings highlight the value of integrating scientific risk assessment information in risk communication to align calculated and perceived risks. This study suggests effective risk communication can influence local support of climate action plans and implementation of strategies that address climate justice and achieve social sustainability in local communities.

ContributorsCheng, Chingwen (Author) / Tsai, Jiun-Yi (Author) / Yang, Y. C. Ethan (Author) / Esselman, Rebecca (Author) / Kalcic, Margaret (Author) / Xu, Xin (Author) / Mohai, Paul (Author) / Herberger Institute for Design and the Arts (Contributor)
Created2017-10-12
128776-Thumbnail Image.png
Description

We know very little about how soil-borne pollutants such as selenium (Se) can impact pollinators, even though Se has contaminated soils and plants in areas where insect pollination can be critical to the functioning of both agricultural and natural ecosystems. Se can be biotransferred throughout the food web, but few

We know very little about how soil-borne pollutants such as selenium (Se) can impact pollinators, even though Se has contaminated soils and plants in areas where insect pollination can be critical to the functioning of both agricultural and natural ecosystems. Se can be biotransferred throughout the food web, but few studies have examined its effects on the insects that feed on Se-accumulating plants, particularly pollinators. In laboratory bioassays, we used proboscis extension reflex (PER) and taste perception to determine if the presence of Se affected the gustatory response of honey bee (Apis mellifera L., Hymenoptera: Apidae) foragers. Antennae and proboscises were stimulated with both organic (selenomethionine) and inorganic (selenate) forms of Se that commonly occur in Se-accumulating plants. Methionine was also tested. Each compound was dissolved in 1 M sucrose at 5 concentrations, with sucrose alone as a control. Antennal stimulation with selenomethionine and methionine reduced PER at higher concentrations. Selenate did not reduce gustatory behaviors. Two hours after being fed the treatments, bees were tested for sucrose response threshold. Bees fed selenate responded less to sucrose stimulation. Mortality was higher in bees chronically dosed with selenate compared with a single dose. Selenomethionine did not increase mortality except at the highest concentration. Methionine did not significantly impact survival. Our study has shown that bees fed selenate were less responsive to sucrose, which may lead to a reduction in incoming floral resources needed to support coworkers and larvae in the field. If honey bees forage on nectar containing Se (particularly selenate), reductions in population numbers may occur due to direct toxicity. Given that honey bees are willing to consume food resources containing Se and may not avoid Se compounds in the plant tissues on which they are foraging, they may suffer similar adverse effects as seen in other insect guilds.

ContributorsHladun, Kristen R. (Author) / Smith, Brian (Author) / Mustard, Julie (Author) / Morton, Ray R. (Author) / Trumble, John T. (Author) / College of Liberal Arts and Sciences (Contributor)
Created2012-04-13
129254-Thumbnail Image.png
Description

Over the past couple of decades, quality has been an area of increased focus. Multiple models and approaches have been proposed to measure the quality in the construction industry. This paper focuses on determining the quality of one of the types of roofing systems used in the construction industry, i.e.,

Over the past couple of decades, quality has been an area of increased focus. Multiple models and approaches have been proposed to measure the quality in the construction industry. This paper focuses on determining the quality of one of the types of roofing systems used in the construction industry, i.e., sprayed polyurethane foam roofs (SPF roofs). Thirty-seven urethane-coated SPF roofs that were installed in 2005/2006 were visually inspected to measure the percentage of blisters and repairs three times over a period of four years, six years, and seven years. A repairing criteria was established after a six-year mark based on the data that were reported to contractors as vulnerable roofs. Furthermore, the relation between four possible contributing time-of-installation factors—contractor, demographics, season, and difficulty (number of penetrations and size of the roof in square feet) that could affect the quality of the roof was determined. Demographics and difficulty did not affect the quality of the roofs, whereas the contractor and the season when the roof was installed did affect the quality of the roofs.

ContributorsGajjar, Dhaval (Author) / Kashiwagi, Dean (Author) / Sullivan, Kenneth (Author) / Kashiwagi, Jacob (Author) / Ira A. Fulton Schools of Engineering (Contributor)
Created2015-04-01