Matching Items (3)
158483-Thumbnail Image.png
Description
A mathematical approach was developed to evaluate the resilience of coupled power-water networks using a variant of contingency analysis adapted from electric transmission studies. In particular, the “what if” scenarios explored in power systems research were extended and applied for coupled power-water network research by evaluating how stressors and failures

A mathematical approach was developed to evaluate the resilience of coupled power-water networks using a variant of contingency analysis adapted from electric transmission studies. In particular, the “what if” scenarios explored in power systems research were extended and applied for coupled power-water network research by evaluating how stressors and failures in the water network can propagate across system boundaries and into the electric network. Reduction in power system contingency reserves was the metric for determining violation of N-1 contingency reliability. Geospatial considerations were included using high-resolution, publicly available Geographic Information System data on infrastructure in the Phoenix Metropolitan Area that was used to generate a power network with 599 transmission lines and total generation capacity of 18.98 GW and a water network with 2,624 water network lines and capacity to serve up to 1.72M GPM of surface water. The steady-state model incorporated operating requirements for the power network—e.g., contingency reserves—and the water network—e.g., pressure ranges—while seeking to meet electric load and water demand. Interconnections developed between the infrastructures demonstrated how alternations to the system state and/or configuration of one network affect the other network, with results demonstrated through co-simulation of the power network and water network using OpenDSS and EPANET, respectively. Results indicate four key findings that help operators understand the interdependent behavior of the coupled power-water network: (i) two water failure scenarios (water flowing out of Waddell dam and CAP canal flowing west of Waddell dam) are critical to power-water network N-1 contingency reliability above 60% power system loading and at 100% water system demand, (ii) fast-starting natural gas generating units are necessary to maintain N-1 contingency reliability below 60% power system loading, (iii) Coolidge Station was the power plant to most frequently undergo a reduction in reserves amongst the water failure scenarios that cause a violation of N-1 reliability, (iv) power network vulnerability to water network failures was non-linear because it depends on the generating units that are dispatched, which can vary as line thermal limits or unit generation capacities are reached.
ContributorsGorman, Brandon (Author) / Johnson, Nathan G (Thesis advisor) / Seager, Thomas P (Committee member) / Chester, Mikhail V (Committee member) / Arizona State University (Publisher)
Created2020
127884-Thumbnail Image.png
Description

A typical building construction process runs through three main consecutive phases: design, construction and operation. Currently, architects and engineers both engage in the creation of environmental designs that adequately reflect high performance through sustainability and energy efficiency in new buildings. Occupants of buildings have also recently demonstrated a dramatic increase

A typical building construction process runs through three main consecutive phases: design, construction and operation. Currently, architects and engineers both engage in the creation of environmental designs that adequately reflect high performance through sustainability and energy efficiency in new buildings. Occupants of buildings have also recently demonstrated a dramatic increase in awareness regarding building operation, energy usage, and indoor air quality. The process of building construction is chronologically located between both the design and the operation phases. However, this phase has not yet been addressed in either understanding contractor behavior or developing innovative sustainable techniques. These two vital aspects have the potential to levy a dramatic impact on enhancing building performance and operational costs.

Repeatedly causing apprehension to the construction industry is a question that posits, “Why is there a gap/delta/inconsistency between the designed EUI, Energy Use Intensity, and the operational EUI”? Building occupants shall not be the only party that bears blame for the delta in energy. It is true, nonetheless, that occupants are part of the reason, but the contractor – as well as the entire construction phase - also remain prime suspects worth investigating. In the present time, research is predominantly focused on occupants (post-occupancy) and designers to educate and control the gap between designed and operational EUI. This research has succeeded in the identification of the construction phase, in conjunction with contractor behavior, as another main factor for initiating this energy gap. Therefore, not only is the coupling of sustainable strategies to the construction drivers crucial to attaining a sustainable project, but also it is integral to analyzing contractor behavior within each of the construction phases that play a vital role in successfully serving sustainability. Various techniques and approaches will assist contractors in amending their method statements to ensure a sustainable project.

This research correlates an existing project to the two proposed sustainable concepts: 1) Identify cost-saving strategies that may have been implemented or avoided during the construction process, and 2) Evaluate the impacts of implementing these strategies on overall performance. The adopted contexts are to partially foster sustainable architecture concepts to the Contractor process, and then proceed to analyze its cost implication on overall project performance. Results of the validation of this approach verify that when contractors embrace a sustainable construction process the overall project will yield various financial savings. A mixed-use project was utilized to validate these concepts, which indicated three outcomes: firstly, a 25% decrease in manpower for tiling while maintaining the same productivity, thus reflecting a saving of $3,500; next, increasing the productivity of concrete activity, which would shorten the duration of the construction by 45 days and reflect a saving of $1.5 million, and last of all, reducing the overhead costs of labor camps by efficiently orienting temporary shelters, which reveals a reduction in cooling and heating that returned a saving of approximately $10,000. This research develops a comprehensive evidence-based study that addresses the above-mentioned gap in the construction phase, which targets to yield a multi-dimensional tool that will allow: 1) integrating critical thinking and decision-making approaches regarding contractor behavior, and 2) adopting innovative sustainable construction methods that reflect reduction in operating costs.

ContributorsElzomor, Mohamed (Author) / Parrish, Kristen (Author) / Ira A. Fulton School of Engineering (Contributor)
Created2016-05-20
Description

Global climate models predict increases in precipitation events in the Phoenix-metropolitan area and with the proposition of more flooding new insights are needed for protecting roadways and the services they provide. Students from engineering, sustainability, and planning worked together in ASU’s Urban Infrastructure Anatomy Spring 2016 course to assess:
   

Global climate models predict increases in precipitation events in the Phoenix-metropolitan area and with the proposition of more flooding new insights are needed for protecting roadways and the services they provide. Students from engineering, sustainability, and planning worked together in ASU’s Urban Infrastructure Anatomy Spring 2016 course to assess:
       1. How historical floods changed roadway designs.
       2. Precipitation forecasts to mid-century.
       3. The vulnerability of roadways to more frequent precipitation.
       4. Adaptation strategies focusing on safe-to-fail thinking.
       5. Strategies for overcoming institutional barriers to enable transitions.
The students designed an EPA Storm Water Management Model for the City of Phoenix and forced it with future precipitation forecasts. Vulnerability indexes were created for infrastructure performance and social outcomes. A multi-criteria decision analysis framework was created to prioritize infrastructure adaptation strategies.