Matching Items (467)
Filtering by

Clear all filters

ContributorsChan, Robbie (Performer) / McCarrel, Kyla (Performer) / Sadownik, Stephanie (Performer) / ASU Library. Music Library (Contributor)
Created2018-04-18
151631-Thumbnail Image.png
Description
Whenever a text is transmitted, or communicated by any means, variations may occur because editors, copyists, and performers are often not careful enough with the source itself. As a result, a flawed text may come to be accepted in good faith through repetition, and may often be preferred over the

Whenever a text is transmitted, or communicated by any means, variations may occur because editors, copyists, and performers are often not careful enough with the source itself. As a result, a flawed text may come to be accepted in good faith through repetition, and may often be preferred over the authentic version because familiarity with the flawed copy has been established. This is certainly the case with regard to Manuel M. Ponce's guitar editions. An inexact edition of a musical work is detrimental to several key components of its performance: musical interpretation, aesthetics, and the original musical concept of the composer. These phenomena may be seen in the case of Manuel Ponce's Suite in D Major for guitar. The single published edition by Peer International Corporation in 1967 with the revision and fingering of Manuel López Ramos contains many copying mistakes and intentional, but unauthorized, changes to the original composition. For the present project, the present writer was able to obtain a little-known copy of the original manuscript of this work, and to document these discrepancies in order to produce a new performance edition that is more closely based on Ponce's original work.
ContributorsReyes Paz, Ricardo (Author) / Koonce, Frank (Thesis advisor) / Solis, Theodore (Committee member) / Rotaru, Catalin (Committee member) / Arizona State University (Publisher)
Created2013
ContributorsDaval, Charles (Performer) / ASU Library. Music Library (Publisher)
Created2018-03-26
ContributorsMayo, Joshua (Performer) / ASU Library. Music Library (Publisher)
Created2021-04-29
ContributorsDominguez, Ramon (Performer) / ASU Library. Music Library (Publisher)
Created2021-04-15
ContributorsWhite, Bill (Performer) / ASU Library. Music Library (Publisher)
Created2021-04-03
ContributorsSanchez, Armand (Performer) / Nordstrom, Nathan (Performer) / Roubison, Ryan (Performer) / ASU Library. Music Library (Publisher)
Created2018-04-13
ContributorsMiranda, Diego (Performer)
Created2018-04-06
149457-Thumbnail Image.png
Description
Front End Planning (FEP) is a critical process for uncovering project unknowns, while developing adequate scope definition following a structured approach for the project execution process. FEP for infrastructure projects assists in identifying and mitigating issues such as right-of-way concerns, utility adjustments, environmental hazards, logistic problems, and permitting requirements. This

Front End Planning (FEP) is a critical process for uncovering project unknowns, while developing adequate scope definition following a structured approach for the project execution process. FEP for infrastructure projects assists in identifying and mitigating issues such as right-of-way concerns, utility adjustments, environmental hazards, logistic problems, and permitting requirements. This thesis describes a novel and effective risk management tool that has been developed by the Construction Industry Institute (CII) called the Project Definition Rating Index (PDRI) for infrastructure projects. Input from industry professionals from over 30 companies was used in the tool development which is specifically focused on FEP. Data from actual projects are given showing the efficacy of the tool. Critical success factors for FEP of infrastructure projects are shared. The research shows that a finite and specific list of issues related to scope definition of infrastructure projects can be developed. The thesis also concludes that the PDRI score indicates the current level of scope definition and corresponds to project performance. Infrastructure projects with low PDRI scores outperform projects with high PDRI scores.
ContributorsBingham, Evan Dale (Author) / Gibson Jr., G. Edward (Thesis advisor) / Badger, William (Committee member) / Ariaratnam, Samuel (Committee member) / Arizona State University (Publisher)
Created2010