Information Measurement Theory (IMT) is a system created by Dr. Dean Kashiwagi to minimize subjective decision-making, the amount of data needed to understand situations, and optimize processes by removing risk. IMT uses the ideas of Kashiwagi Solution Models to identify high performing and low performing characteristics. IMT proposes the usage

Information Measurement Theory (IMT) is a system created by Dr. Dean Kashiwagi to minimize subjective decision-making, the amount of data needed to understand situations, and optimize processes by removing risk. IMT uses the ideas of Kashiwagi Solution Models to identify high performing and low performing characteristics. IMT proposes the usage of Best Value Approaches to achieve high performance while minimizing risk through quality control. For my project, I prove how IMT can be applied to a long-term project to reduce stress, create a quality product, and minimize opportunities for failure. My project focuses on the creation and release of a vinyl record. IMT was developed for use with construction projects, so my goal is to apply IMT ideals to an industry where it has not been used whatsoever and show how IMT can be applied to any project that is either difficult, requires careful analysis of options, or is completed on a long-term basis. Since I am not an expert in music production or releasing physical copies of music, I also prove that IMT helps provide guidelines and measures of how to complete a project where not all information is known at the beginning. With the usage of dominant information and the alignment of expert assistance, a high quality product was produced and a successful release followed.
ContributorsPfisthner, Jess (Author) / Kashiwagi, Dean (Thesis director) / Kashiwagi, Jacob (Contributor) / Barrett, The Honors College (Contributor)
Created2017-05
155168-Thumbnail Image.png
Description
Saudi Arabia has been facing issues with completing construction projects on time and on budget. It has been documented that 70% of public construction projects are delayed. Studies have identified the low-bid delivery method as an important factor in causing such delays. The procurement system (low-bid) ignores contractors’ performance, and

Saudi Arabia has been facing issues with completing construction projects on time and on budget. It has been documented that 70% of public construction projects are delayed. Studies have identified the low-bid delivery method as an important factor in causing such delays. The procurement system (low-bid) ignores contractors’ performance, and that is reflected in projects’ performance. A case study was performed, at a University campus in northern Saudi Arabia, identifying the major causes of project delays and cost overruns. The University was experiencing delays from 50% to 150%. Also, the actual project costs for four projects were examined and found that all four projects’ costs were higher than the original bid. The delay and cost overruns factors were gathered from the University engineers. A literature research identified one construction management method, best value performance information procurement system (BV PIPS), has documented multiple times its ability to improve project performance. In a comparison using the result of a case study and the results of (BV PIPS), Saudi Arabia’s delivery system was identified as a potential cause of project performance issues. The current procurement system was analyzed and modified to adapt with the (BV PIPS). The proposed procurement system using BV PIPS, which can be implemented in Saudi Arabia, was created with owner side. A large survey was conducted of 761 classified contractors and 43 universities’ representatives who rated causes of delay factors and cost overruns. The delay factors were then compared to delay factors experienced on Saudi construction projects, identified by performing a literature research. The comparison identified 14 important causes of delays. Moreover, the survey showed that classified contractors and universities’ representatives unsatisfied with low-bid, and they agreed with BV PIPS which selecting vendors based on performance with price. The proposed model required a submitted level of experience (LE), risk assessment (RA), and value added (VA). Besides, project managers of vendors should be interviewed during the clarification phase. In addition, venders should submit the project’s scope, technical schedule, milestone schedule, and risk management plan. In the execution phase, vendors should submit a weekly risk report (WRR) and director’s report (DR).
ContributorsAlzara, Majed (Author) / Kashiwagi, Dean (Thesis advisor) / Kashiwagi, Jacob (Committee member) / Al-Tassan, Abdulrahman (Committee member) / Arizona State University (Publisher)
Created2016