The introduction of novel information technology within contemporary healthcare settings presents a critical juncture for the industry and thus lends itself to the importance of better understanding the impact of this emerging "health 2.0" landscape. Simply, how such technology may affect the healthcare system is still not fully realized, despite

The introduction of novel information technology within contemporary healthcare settings presents a critical juncture for the industry and thus lends itself to the importance of better understanding the impact of this emerging "health 2.0" landscape. Simply, how such technology may affect the healthcare system is still not fully realized, despite the ever-growing need to adopt it in order to serve a growing patient population. Thus, two pertinent questions are posed: is HIT useful and practical and, if so, what is the best way to implement it? This study examined the clinical implementation of specific instances of health information technology (HIT) so as to weigh its benefits and risks to ultimately construct a proposal for successful widespread adoption. Due to the poignancy of information analysis within HIT, Information Measurement Theory (IMT) was used to measure the effectiveness of current HIT systems as well as to elucidate improvements for future implementation. The results indicate that increased transparency, attention to patient-focused approaches and proper IT training will not only allow HIT to better serve the community, but will also decrease inefficient healthcare expenditure.
ContributorsMaietta, Myles Anthony (Author) / Kashiwagi, Dean (Thesis director) / Kashiwagi, Jacob (Committee member) / Barrett, The Honors College (Contributor) / Department of Psychology (Contributor) / School of Life Sciences (Contributor)
Created2015-05
135613-Thumbnail Image.png
Description
The Performance Based Studies Research Studies Group (PBSRG) at Arizona State University aims to evaluate and provide solutions to problems by using concepts derived from deductive logic. The research group identified that problems in most industries are due to the traditional approach of management, direction and control, and offers a

The Performance Based Studies Research Studies Group (PBSRG) at Arizona State University aims to evaluate and provide solutions to problems by using concepts derived from deductive logic. The research group identified that problems in most industries are due to the traditional approach of management, direction and control, and offers a practical contrasting model. The author is a biological sciences major interested in the health care industry. As a volunteer at a local non-profit pregnancy clinic in Tempe, AZ, the author noticed characteristics of the clinic structure that resembled both the traditional approach of management, direction and control and the best value (BV) approach. Although the pregnancy clinic has existed for 30 years and has high patient satisfaction, it faces problems that jeopardize its long term sustainability. This study analyzes the stereotypical structure of non-profit health clinics through literature review and through a case study of a local non-profit pregnancy clinic in Tempe, Arizona. The study identified and analyzed the factors that contribute to inefficiency within non-profit health clinics. The conclusions of the research demonstrate that characteristics of non-profit health clinics that resemble the traditional model perform in a manner that is unsustainable. Recommendations were based on concepts derived from Information Measurement Theory (IMT) and aimed to improve efficiency and effectiveness. The study identifies sources of risks and examines the performance of such organizations; the study concludes that rejection of traditional models and adaptation of the new approach is preferable in improving performance and increasing patient, employee, and volunteer satisfaction.
ContributorsTran, Yvonne Ho (Author) / Kashiwagi, Dean (Thesis director) / Kashiwagi, Jacob (Committee member) / School of Life Sciences (Contributor) / Barrett, The Honors College (Contributor)
Created2016-05
136489-Thumbnail Image.png
Description
Exercise is a great boon to both the health of individuals and the national as a whole. Exercise provides a wide range of significant and well established benefits to both physical and psychological health, with many benefits that are still being discovered. The effects of exercise on health are somewhat

Exercise is a great boon to both the health of individuals and the national as a whole. Exercise provides a wide range of significant and well established benefits to both physical and psychological health, with many benefits that are still being discovered. The effects of exercise on health are somewhat unique, as exercise is one of a limited number of ways to improve health that is not harm a reduction strategy, but instead increases health through direct benefit, rather than increasing health by decreasing damage and harm. Support is also given to the proposal that individuals are in best position to determine the intensity of exercise and to choose primary activities to participate in, in order to provide near maximum physical and psychological benefit, with the understanding that frequency of exercise is of the upmost importance for benefit. The accessibility of exercise and the tremendous health benefit of exercise, makes exercise a huge asset in reducing the exorbitant health care spending and improving mediocre health outcomes in this country; a reasonable goal as numerous countries have better health the United States, even though the United States spends the more than any other country on health.
ContributorsRael, Ashur Scott (Author) / Kashiwagi, Dean (Thesis director) / Kashiwagi, Jacob (Committee member) / Barrett, The Honors College (Contributor) / Department of Chemistry and Biochemistry (Contributor) / School of Film, Dance and Theatre (Contributor)
Created2015-05
135668-Thumbnail Image.png
Description
In the medical industry, there have been promising advances in the increase of new types of healthcare to the public. As of 2015, there was a 98% Premarket Approval rate, a 38% increase since 2010. In addition, there were 41 new novel drugs approved for clinical usage in 2014 where

In the medical industry, there have been promising advances in the increase of new types of healthcare to the public. As of 2015, there was a 98% Premarket Approval rate, a 38% increase since 2010. In addition, there were 41 new novel drugs approved for clinical usage in 2014 where the average in the previous years from 2005-2013 was 25. However, the research process towards creating and delivering new healthcare to the public remains remarkably inefficient. It takes on average 15 years, over $900 million by one estimate, for a less than 12% success rate of discovering a novel drug for clinical usage. Medical devices do not fare much better. Between 2005-2009, there were over 700 recalls per year. In addition, it takes at minimum 3.25 years for a 510(k) exempt premarket approval. Plus, a time lag exists where it takes 17 years for only 14% of medical discoveries to be implemented clinically. Coupled with these inefficiencies, government funding for medical research has been decreasing since 2002 (2.5% of Gross Domestic Product) and is predicted to be 1.5% of Gross Domestic Product by 2019. Translational research, the conversion of bench-side discoveries to clinical usage for a simplistic definition, has been on the rise since the 1990s. This may be driving the increased premarket approvals and new novel drug approvals. At the very least, it is worth considering as translational research is directly related towards healthcare practices. In this paper, I propose to improve the outcomes of translational research in order to better deliver advancing healthcare to the public. I suggest Best Value Performance Information Procurement System (BV PIPS) should be adapted in the selection process of translational research projects to fund. BV PIPS has been shown to increase the efficiency and success rate of delivering projects and services. There has been over 17 years of research with $6.3 billion of projects and services delivered showing that BV PIPS has a 98% customer satisfaction, 90% minimized management effort, and utilizes 50% less manpower and effort. Using University of Michigan \u2014 Coulter Foundation Program's funding process as a baseline and standard in the current selection of translational research projects to fund, I offer changes to this process based on BV PIPS that may ameliorate it. As concepts implemented in this process are congruent with literature on successful translational research, it may suggest that this new model for selecting translational research projects to fund will reduce costs, increase efficiency, and increase success. This may then lead to more Premarket Approvals, more new novel drug approvals, quicker delivery time to the market, and lower recalls.
ContributorsDel Rosario, Joseph Paul (Author) / Kashiwagi, Dean (Thesis director) / Kashiwagi, Jacob (Committee member) / Harrington Bioengineering Program (Contributor) / Barrett, The Honors College (Contributor)
Created2016-05
135489-Thumbnail Image.png
Description
Biosimilar pharmaceuticals are new lower-cost drugs awaiting large-scale approval within the United States (U.S). Biosimilar pharmaceuticals or simply biosimilars, are complex, large-molecule, and biologically-derived drugs that are deemed molecularly similar to currently approved reference biologics. Biologics and biosimilars both treat a wide range of conditions with no clinically meaningful difference

Biosimilar pharmaceuticals are new lower-cost drugs awaiting large-scale approval within the United States (U.S). Biosimilar pharmaceuticals or simply biosimilars, are complex, large-molecule, and biologically-derived drugs that are deemed molecularly similar to currently approved reference biologics. Biologics and biosimilars both treat a wide range of conditions with no clinically meaningful difference between them. However, numerous states, with help from large pharmaceutical companies lobbying, are passing legislation complicating the prescribing and dispensing process for biosimilars by mandating a "notification" or "communication" requirement. The notification requirement requires pharmacists to contact prescribers when dispensing an interchangeable biosimilar in place of its reference biologic. This type of mandate is not only unprecedented in current U.S. pharmaceutical law, but it also incentivizes pharmacists to dispense more expensive biologics in place of biosimilars. The notification or communication requirement also falsely gives consumers the appearance that biosimilars are more dangerous in comparison to other types of biological medicines. These two factors, pharmacist hesitation and consumer distrust, serve as barriers to successful biosimilar market entry. High research and development costs and forecasted poor sales inhibit biosimilar companies from making the investment in innovating new drugs. The lack of investment in research and development prevents new biosimilars from entering the market to compete with currently approved biologics. In turn, current biosimilar legislation is reducing pharmaceutical competition and increasing drug prices. Information Measurement Theory supports the notion that in climates without competition (caused by a lack of transparency) sparks low quality and high costs. Transparency and improved biosimilar market conditions can be achieved through repealing the large pharmaceutical company backed notification requirement.
ContributorsFelthouse, Karis Renee (Author) / Kashiwagi, Dean (Thesis director) / Kashiwagi, Jacob (Committee member) / School of Politics and Global Studies (Contributor) / School of Film, Dance and Theatre (Contributor) / School of Sustainability (Contributor) / Barrett, The Honors College (Contributor)
Created2016-05
152178-Thumbnail Image.png
Description
The construction industry in India suffers from major time and cost overruns. Data from government and industry reports suggest that projects suffer from 20 to 25 percent time and cost overruns. Waste of resources has been identified as a major source of inefficiency. Despite a substantial increase in the past

The construction industry in India suffers from major time and cost overruns. Data from government and industry reports suggest that projects suffer from 20 to 25 percent time and cost overruns. Waste of resources has been identified as a major source of inefficiency. Despite a substantial increase in the past few years, demand for professionals and contractors still exceeds supply by a large margin. The traditional methods adopted in the Indian construction industry may not suffice the needs of this dynamic environment, as they have produced large inefficiencies. Innovative ways of procurement and project management can satisfy the needs aspired to as well as bring added value. The problems faced by the Indian construction industry are very similar to those faced by other developing countries. The objective of this paper is to discuss and analyze the economic concerns, inefficiencies and investigate a model that both explains the Indian construction industry structure and provides a framework to improve efficiencies. The Best Value (BV) model is examined as an approach to be adopted in lieu of the traditional approach. This could result in efficient construction projects by minimizing cost overruns and delays, which until now have been a rarity.
ContributorsNihas, Syed (Author) / Kashiwagi, Dean (Thesis advisor) / Sullivan, Kenneth (Committee member) / Kashiwagi, Jacob (Committee member) / Arizona State University (Publisher)
Created2013
153848-Thumbnail Image.png
Description
ABSTRACT

The problem of litigation and disputes in the construction sector is a major impediment to countries’ development goals. The purpose of this paper is to investigate the problem of high legal costs and long delays that arise due to litigation involving project owners, designers, contractors and other construction parties

ABSTRACT

The problem of litigation and disputes in the construction sector is a major impediment to countries’ development goals. The purpose of this paper is to investigate the problem of high legal costs and long delays that arise due to litigation involving project owners, designers, contractors and other construction parties worldwide and in Saudi Arabia, as well as to give recommendation according to the outcomes of this research. The causes of litigious behavior in Saudi Arabia and other countries around the world were identified and documented, also the differences in litigation of the Saudi Arabian construction industry as compared to other countries were identified. Preliminary investigations revealed that there are some level of similarity in the nature of the causes. Thus, these causes were grouped into three main categories which are expectation factors, communications factors and documentation factors. Further research based on existing literature showed that the practices used to minimize litigation in the construction industry were investigated. The following delivery process were researched: design-build (DB) delivery method, Alliance Contracting, Construction Manager at Risk (CMAR), Best Value Approach, Integrated Project Delivery (IPD), and Public-Private Partnerships (PPPs), and the PIPS/PIRMS approach. These delivery methods were found to have issues, which means the methods by observation do not seem to be the ideal solution to minimize litigation in the construction industry. The only delivery method found to have no litigation issues was the PIPS/PIRMS approach.
ContributorsAlmutairi, Saud (Author) / Kashiwagi, Dean (Thesis advisor) / Sullivan, Kenneth (Committee member) / Kashiwagi, Jacob (Committee member) / Arizona State University (Publisher)
Created2015
153833-Thumbnail Image.png
Description
Delays are a major cause for concern in the construction industry both globally and locally in Saudi Arabia. This paper identifies the main causes of delay in infrastructure projects in the holy city of Makkah (Saudi Arabia) and compares these with projects around the rest of the country and other

Delays are a major cause for concern in the construction industry both globally and locally in Saudi Arabia. This paper identifies the main causes of delay in infrastructure projects in the holy city of Makkah (Saudi Arabia) and compares these with projects around the rest of the country and other Gulf countries as well. Data were obtained from 49 infrastructure projects that were undertaken by the owner and were analyzed quantitatively to understand the severity and causes of delay. 10 risk factors were identified in this study and these factors were grouped into four categories. The average delay in infrastructure projects in the city of Makkah was found to be 39%. The most severe cause of delay was found to be the land acquisition factor. This highlights the critical land ownership and acquisition issues that is prevailing in Makkah. In addition to this, other factors include contractors’ lack of expertise, haphazard underground utilities (line services), and re-designing. It is concluded that majority of delays were caused from the owner’s side as compared to contractors, consultants, and other project’s stakeholders. This finding was in line with the research findings of the Gulf Countries Construction (GCC) Industry’s literature as well. This study will fill an important practice and research gap for improving the efficiency in project delivery for infrastructure projects in the holy city of Makkah and the Gulf countries at large.
ContributorsElawi, Ghazi Saad A (Author) / Kashiwagi, Dean (Thesis advisor) / Sullivan, Kenneth (Committee member) / Kashiwagi, Jacob (Committee member) / Arizona State University (Publisher)
Created2015
154321-Thumbnail Image.png
Description
A roofing manufacturer wants to differentiate themselves from other roofing manufacturers based on performance information. However, construction industry has revealed poor performance documentation in the last couple of decades. With no current developed performance measurement model in the industry, two roofing manufacturers approached the research group to implement a warranty

A roofing manufacturer wants to differentiate themselves from other roofing manufacturers based on performance information. However, construction industry has revealed poor performance documentation in the last couple of decades. With no current developed performance measurement model in the industry, two roofing manufacturers approached the research group to implement a warranty program that measures the performance information of their systems and applicators. Moreover, the success of any project in the construction industry heavily relies upon the capability of the contractor(s) executing the project. Low-performing contractors are correlated with increased cost and delayed schedules, resulting in end-user dissatisfaction with the final product. Hence, the identification and differentiation of the high performing contractors from their competitors is also crucial. The purpose of this study is to identify and describe a new model for measuring manufacturer performance and differentiating contractor performance and capability for two roofing manufacturers (Manufacturer 1 and Manufacturer 2) in the roofing industry. The research uses multiple years of project data and customer satisfaction data collected for two roofing manufacturers for over 1,000 roofing contractors. The performance and end-user satisfaction was obtained for over 7,000 manufacturers' projects and each contractor associated with that project for cost, schedule, and quality metrics. The measurement process was successfully able to provide a performance measurement for the manufacturer based on the customer satisfaction and able to identify low performing contractors. This study presents the research method, the developed measurement model, and proposes a new performance measurement process that entities in the construction industry can use to measure performance.
ContributorsGajjar, Dhaval (Author) / Kashiwagi, Dean (Thesis advisor) / Sullivan, Kenneth (Thesis advisor) / Kashiwagi, Jacob (Committee member) / Arizona State University (Publisher)
Created2016
155168-Thumbnail Image.png
Description
Saudi Arabia has been facing issues with completing construction projects on time and on budget. It has been documented that 70% of public construction projects are delayed. Studies have identified the low-bid delivery method as an important factor in causing such delays. The procurement system (low-bid) ignores contractors’ performance, and

Saudi Arabia has been facing issues with completing construction projects on time and on budget. It has been documented that 70% of public construction projects are delayed. Studies have identified the low-bid delivery method as an important factor in causing such delays. The procurement system (low-bid) ignores contractors’ performance, and that is reflected in projects’ performance. A case study was performed, at a University campus in northern Saudi Arabia, identifying the major causes of project delays and cost overruns. The University was experiencing delays from 50% to 150%. Also, the actual project costs for four projects were examined and found that all four projects’ costs were higher than the original bid. The delay and cost overruns factors were gathered from the University engineers. A literature research identified one construction management method, best value performance information procurement system (BV PIPS), has documented multiple times its ability to improve project performance. In a comparison using the result of a case study and the results of (BV PIPS), Saudi Arabia’s delivery system was identified as a potential cause of project performance issues. The current procurement system was analyzed and modified to adapt with the (BV PIPS). The proposed procurement system using BV PIPS, which can be implemented in Saudi Arabia, was created with owner side. A large survey was conducted of 761 classified contractors and 43 universities’ representatives who rated causes of delay factors and cost overruns. The delay factors were then compared to delay factors experienced on Saudi construction projects, identified by performing a literature research. The comparison identified 14 important causes of delays. Moreover, the survey showed that classified contractors and universities’ representatives unsatisfied with low-bid, and they agreed with BV PIPS which selecting vendors based on performance with price. The proposed model required a submitted level of experience (LE), risk assessment (RA), and value added (VA). Besides, project managers of vendors should be interviewed during the clarification phase. In addition, venders should submit the project’s scope, technical schedule, milestone schedule, and risk management plan. In the execution phase, vendors should submit a weekly risk report (WRR) and director’s report (DR).
ContributorsAlzara, Majed (Author) / Kashiwagi, Dean (Thesis advisor) / Kashiwagi, Jacob (Committee member) / Al-Tassan, Abdulrahman (Committee member) / Arizona State University (Publisher)
Created2016