Description

The objectives of this research project were to develop a model of real power demand from a dc fast charging station both with and without an integrated battery energy storage

The objectives of this research project were to develop a model of real power demand from a dc fast charging station both with and without an integrated battery energy storage system (BESS). An optimal deterministic control strategy was devel-oped to perform load-shaping under various scenarios with various load-shaping goals in mind to establish the value for BESS’s with various power and energy capacities.

3.25 MB application/pdf

Download count: 0

Details

Contributors
Date Created
  • 2019
Resource Type
  • Text
  • Collections this item is in
    Note
    • Masters Thesis Electrical Engineering 2019

    Machine-readable links