Description

The demand for new highway infrastructure, the need to repair aging infrastructure, and the drive to optimize public expenditures on infrastructure have led transportation agencies toward alternative contracting methods (ACMs)

The demand for new highway infrastructure, the need to repair aging infrastructure, and the drive to optimize public expenditures on infrastructure have led transportation agencies toward alternative contracting methods (ACMs) such as design-build (DB) and construction manager/general contractor (CM/GC). U.S. transportation agencies have substantial experience with traditional design-bid-build delivery. To promote ACMs, the Federal Highway Administration and the National Cooperative Highway Research Program (NCRHP) have published ACM guidance documents.

4.74 MB application/pdf

Download count: 0

Details

Contributors
Date Created
  • 2019
Resource Type
  • Text
  • Collections this item is in
    Note
    • Doctoral Dissertation Civil, Environmental and Sustainable Engineering 2019

    Machine-readable links