Description

Despite advancements in construction and construction-related technology, capital project performance deviations, typically overruns, remain endemic within the capital projects industry. Currently, management is generally unaware of the current status

Despite advancements in construction and construction-related technology, capital project performance deviations, typically overruns, remain endemic within the capital projects industry. Currently, management is generally unaware of the current status of their projects, and thus monitoring and control of projects are not achieved effectively. In an ever-increasing competitive industry landscape, the need to deliver projects within technical, budgetary, and schedule requirements becomes imperative to sustain a healthy return on investment for the project stakeholders.

Reuse Permissions
  • 3.7 MB application/pdf

    Download count: 0

    Details

    Contributors
    Date Created
    • 2016
    Resource Type
  • Text
  • Collections this item is in
    Note
    • Partial requirement for: Ph.D., Arizona State University, 2016
      Note type
      thesis
    • Includes bibliographical references (pages 158-168)
      Note type
      bibliography
    • Field of study: Civil and environmental engineering

    Citation and reuse

    Statement of Responsibility

    by Amin Abbaszadegan

    Machine-readable links