Description

The price based marketplace has dominated the construction industry. The majority of owners use price based practices of management (expectation and decision making, control, direction, and inspection.) The

The price based marketplace has dominated the construction industry. The majority of owners use price based practices of management (expectation and decision making, control, direction, and inspection.) The price based/management and control paradigm has not worked. Clients have now been moving toward the best value environment (hire contractors who know what they are doing, who preplan, and manage and minimize risk and deviation.) Owners are trying to move from client direction and control to hiring an expert and allowing them to do the quality control/risk management.

Reuse Permissions
  • 3.29 MB application/pdf

    Download count: 0

    Details

    Contributors
    Date Created
    • 2011
    Resource Type
  • Text
  • Collections this item is in
    Note
    • Partial requirement for: M.S., Arizona State University, 2011
      Note type
      thesis
    • Includes bibliographical references (p. 104-111)
      Note type
      bibliography
    • Field of study: Construction management

    Citation and reuse

    Statement of Responsibility

    by Michele Pauli

    Machine-readable links