Trenchless technology is a group of techniques whose utilization allows for the installation, rehabilitation, and repair of underground infrastructure with minimal excavation from the ground surface. As the built environment becomes more congested, projects are trending towards using trenchless technologies for their ability to quickly produce a quality product with

Trenchless technology is a group of techniques whose utilization allows for the installation, rehabilitation, and repair of underground infrastructure with minimal excavation from the ground surface. As the built environment becomes more congested, projects are trending towards using trenchless technologies for their ability to quickly produce a quality product with minimal environmental and social costs. Pilot tube microtunneling (PTMT) is a trenchless technology where new pipelines may be installed at accurate and precise line and grade over manhole to manhole distances. The PTMT process can vary to a certain degree, but typically involves the following three phases: jacking of the pilot tube string to achieve line and grade, jacking of casing along the pilot bore and rotation of augers to excavate the borehole to a diameter slightly larger than the product pipe, and jacking of product pipe directly behind the last casing. Knowledge of the expected productivity rates and jacking forces during a PTMT installation are valuable tools that can be used for properly weighing its usefulness versus competing technologies and minimizing risks associated with PTMT. This thesis outlines the instrumentation and monitoring process used to record jacking frame hydraulic pressures from seven PTMT installations. Cyclic patterns in the data can be detected, indicating the installation of a single pipe segment, and enabling productivity rates for each PTMT phase to be determined. Furthermore, specific operations within a cycle, such as pushing a pipe or retracting the machine, can be observed, allowing for identification of the critical tasks associated with each phase. By identifying the critical tasks and developing more efficient means for their completion, PTMT productivity can be increased and costs can be reduced. Additionally, variations in depth of cover, drive length, pipe diameter, and localized ground conditions allowed for trends in jacking forces to be identified. To date, jacking force predictive models for PTMT are non-existent. Thus, jacking force data was compared to existing predictive models developed for the closely related pipe jacking and microtunneling methodologies, and the applicability of their adoption for PTMT jacking force prediction was explored.
ContributorsOlson, Matthew P (Author) / Ariaratnam, Samuel T (Thesis advisor) / Lueke, Jason S (Committee member) / Zapata, Claudia E (Committee member) / Tang, Pingbo (Committee member) / Arizona State University (Publisher)
Created2013
153400-Thumbnail Image.png
Description
Economic and environmental concerns necessitate the preference for retrofits over new construction in manufacturing facilities for incorporating modern technology, expanding production, becoming more energy-efficient and improving operational efficiency. Despite the technical and functional challenges in retrofits, the expectation from the project team is to; reduce costs, ensure the time to

Economic and environmental concerns necessitate the preference for retrofits over new construction in manufacturing facilities for incorporating modern technology, expanding production, becoming more energy-efficient and improving operational efficiency. Despite the technical and functional challenges in retrofits, the expectation from the project team is to; reduce costs, ensure the time to market and maintain a high standard for quality and safety. Thus, the construction supply chain faces increasing pressure to improve performance by ensuring better labor productivity, among other factors, for efficiency gain. Building Information Modeling (BIM) & off-site prefabrication are determined as effective management & production methods to meet these goals. However, there are limited studies assessing their impact on labor productivity within the constraints of a retrofit environment. This study fills the gap by exploring the impact of BIM on labor productivity (metric) in retrofits (context).

BIM use for process tool installation at a semiconductor manufacturing facility serves as an ideal environment for practical observations. Direct site observations indicate a positive correlation between disruptions in the workflow attributed to an immature use of BIM, waste due to rework and high non-value added time at the labor work face. Root-cause analysis traces the origins of the said disruptions to decision-factors that are critical for the planning, management and implementation of BIM. Analysis shows that stakeholders involved in decision-making during BIM planning, management and implementation identify BIM-value based on their immediate utility for BIM-use instead of the utility for the customers of the process. This differing value-system manifests in the form of unreliable and inaccurate information at the labor work face.

Grounding the analysis in theory and observations, the author hypothesizes that stakeholders of a construction project value BIM and BIM-aspects (i.e. geometrical information, descriptive information and workflows) differently and the accuracy of geometrical information is critical for improving labor productivity when using prefabrication in retrofit construction. In conclusion, this research presents a BIM-value framework, associating stakeholders with their relative value for BIM, the decision-factors for the planning, management and implementation of BIM and the potential impact of those decisions on labor productivity.
ContributorsGhosh, Arundhati (Author) / Chasey, Allan D (Thesis advisor) / Laroche, Dominique-Claude (Committee member) / Fowler, John (Committee member) / Arizona State University (Publisher)
Created2015
150210-Thumbnail Image.png
Description
Trenchless technologies have emerged as a viable alternative to traditional open trench methods for installing underground pipelines and conduits. Pilot Tube Microtunneling, also referred to as the pilot tube system of microtunneling, guided auger boring, or guided boring method, is a recent addition to the family of trenchless installation methods.

Trenchless technologies have emerged as a viable alternative to traditional open trench methods for installing underground pipelines and conduits. Pilot Tube Microtunneling, also referred to as the pilot tube system of microtunneling, guided auger boring, or guided boring method, is a recent addition to the family of trenchless installation methods. Pilot tube microtunneling originated in Japan and Europe, and was introduced to the United States in the year 1995 (Boschert 2007). Since then this methodology has seen increased utilization across North America particularity in municipal markets for the installation of gravity sewers. The primary reason contributing to the growth of pilot tube microtunneling is the technology's capability of installing pipes at high precision in terms of line and grade, in a wide range of ground conditions using relatively inexpensive equipment. The means and methods, applicability, capabilities and limitations of pilot tube microtunneling are well documented in published literature through many project specific case studies. However, there is little information on the macroscopic level regarding the technology and industry as a whole. With the increasing popularity of pilot tube microtunneling, there is an emerging need to address the above issues. This research effort surveyed 22 pilot tube microtunneling contractors across North America to determine the current industry state of practice with the technology. The survey examined various topics including contractor profile and experience; equipment, methods, and pipe materials utilized; and issues pertaining to project planning and construction risks associated with the pilot tube method. The findings of this research are based on a total of 450 projects completed with pilot tube microtunneling between 2006 and 2010. The respondents were diverse in terms of their experience with PTMT, ranging from two to 11 years. A majority of the respondents have traditionally provided services with other trenchless technologies. As revealed by the survey responses, PTMT projects grew by 110% between the years 2006 and 2010. It was found that almost 72% of the 450 PTMT projects completed between 2006 and 2010 by the respondents were for sanitary sewers. Installation in cobbles and boulders was rated as the highest risk by the contractors.
ContributorsGottipati, Vamseedhar (Author) / Lueke, Jason S (Thesis advisor) / Ariaratnam, Samuel T (Committee member) / Chasey, Allan (Committee member) / Arizona State University (Publisher)
Created2011
149708-Thumbnail Image.png
Description
Semiconductor manufacturing facilities are very complex and capital intensive in nature. During the lifecycle of these facilities various disciplines come together, generate and use a tremendous amount of building and process information to support various decisions that enable them to successfully design, build and sustain these advanced facilities. However, a

Semiconductor manufacturing facilities are very complex and capital intensive in nature. During the lifecycle of these facilities various disciplines come together, generate and use a tremendous amount of building and process information to support various decisions that enable them to successfully design, build and sustain these advanced facilities. However, a majority of the information generated and processes taking place are neither integrated nor interoperable and result in a high degree of redundancy. The objective of this thesis is to build an interoperable Building Information Model (BIM) for the Base-Build and Tool Installation in a semiconductor manufacturing facility. It examines existing processes and data exchange standards available to facilitate the implementation of BIM and provides a framework for the development of processes and standards that can help in building an intelligent information model for a semiconductor manufacturing facility. To understand the nature of the flow of information between the various stakeholders the flow of information between the facility designer, process tool manufacturer and tool layout designer is examined. An information model for the base build and process tool is built and the industry standards SEMI E6 and SEMI E51 are used as a basis to model the information. It is found that applications used to create information models support interoperable industry standard formats such as the Industry Foundation Classes (IFC) and ISO 15926 in a limited manner. A gap analysis has revealed that interoperability standards applicable to the semiconductor manufacturing industry such as the IFC and ISO15926 need to be expanded to support information transfers unique to the industry. Information modeling for a semiconductor manufacturing facility is unique in that it is a process model (Process Tool Information Model) within a building model (Building Information Model), each of them supported more robustly by different interoperability standards. Applications support interoperability data standards specific to the domain or industry they serve but information transfers need to occur between the various domains. To facilitate flow of information between the different domains it is recommended that a mapping of the industry standards be undertaken and translators between them be developed for business use.
ContributorsPindukuri, Shruthi (Author) / Chasey, Allan D (Thesis advisor) / Wiezel, Avi (Committee member) / Mamlouk, Michael (Committee member) / Arizona State University (Publisher)
Created2011
150719-Thumbnail Image.png
Description
This dissertation presents a portable methodology for holistic planning and optimization of right of way infrastructure rehabilitation that was designed to generate monetary savings when compared to planning that only considers single infrastructure components. Holistic right of way infrastructure planning requires simultaneous consideration of the three right of way infrastructure

This dissertation presents a portable methodology for holistic planning and optimization of right of way infrastructure rehabilitation that was designed to generate monetary savings when compared to planning that only considers single infrastructure components. Holistic right of way infrastructure planning requires simultaneous consideration of the three right of way infrastructure components that are typically owned and operated under the same municipal umbrella: roads, sewer, and water. The traditional paradigm for the planning of right way asset management involves operating in silos where there is little collaboration amongst different utility departments in the planning of maintenance, rehabilitation, and renewal projects. By collaborating across utilities during the planning phase, savings can be achieved when collocated rehabilitation projects from different right of way infrastructure components are synchronized to occur at the same time. These savings are in the form of shared overhead and mobilization costs, and roadway projects providing open space for subsurface utilities. Individual component models and a holistic model that utilize evolutionary algorithms to optimize five year maintenance, rehabilitation, and renewal plans for the road, sewer, and water components were created and compared. The models were designed to be portable so that they could be used with any infrastructure condition rating, deterioration modeling, and criticality assessment systems that might already be in place with a municipality. The models attempt to minimize the overall component score, which is a function of the criticality and condition of the segments within each network, by prescribing asset management activities to different segments within a component network while subject to a constraining budget. The individual models were designed to represent the traditional decision making paradigm and were compared to the holistic model. In testing at three different budget levels, the holistic model outperformed the individual models in the ability to generate five year plans that optimized prescribed maintenance, rehabilitation and renewal for various segments in order to achieve the goal of improving the component score. The methodology also achieved the goal of being portable, in that it is compatible with any condition rating, deterioration, and criticality system.
ContributorsCarey, Brad David (Author) / Lueke, Jason S (Thesis advisor) / Ariaratnam, Samuel (Committee member) / Bashford, Howard (Committee member) / Arizona State University (Publisher)
Created2012
155876-Thumbnail Image.png
Description
Many accidents occur during construction and maintenance of facilities. Both research and practice have demonstrated that decisions made during the design and planning phases before work at a construction site can influence workers’ safety. The Prevention through Design (PtD) concept is the consideration of construction site safety in the design

Many accidents occur during construction and maintenance of facilities. Both research and practice have demonstrated that decisions made during the design and planning phases before work at a construction site can influence workers’ safety. The Prevention through Design (PtD) concept is the consideration of construction site safety in the design of a project. In one research study, more than 200 fatality investigation reports were reviewed, and the results showed that 42 percent of fatalities reviewed were linked to the absence of the PtD concept (Behm, 2005). This work indicates that the associated risk that contributed to the incident would have been reduced or eliminated if PtD had been utilized.

Researchers have identified the reasons for not applying the PtD concept. The predominant reason is that most architects and design engineers do not learn about construction safety and construction processes required to eliminate construction safety hazards through design. Therefore, Prevention through Design education of architects, design engineers, and construction managers is vital. However, in most curricula, there is no room for an entire course focused on PtD. Therefore, one researcher implemented 70 minutes long lecture-based intervention in a project management class of the civil engineering discipline, but it did not prove effective (Behm, Culvenor, & Dixon, 2014).

Hence, there is an opportunity to teach PtD to students using alternative teaching strategies such as computer games. Computer games are routinely considered as the most important and influential medium by college students. In this research study, a serious game and a paper-based game (paper version of the serious game) were developed and implemented. The aim of the study was to measure the effectiveness of alternative teaching methods to train students for safe design thinking. The result shows that the computer game engaged the students in comprehensive hazard recognition challenges. The learning experience of the students was compared to two other interventions: paper-based game and lecture-based teaching. The in-class lecture and the computer game were effective in delivering the prevention through design topics. The game was more effective compared to the lecture. The paper-based game failed to motivate students to learn. This dissertation discusses the possible reasons for success and failures of these pedagogical approaches.
ContributorsZia-ud-Din (Author) / Gibson, Jr, G. Edward (Thesis advisor) / Chasey, Allan D (Committee member) / Torrent, David Grau (Committee member) / Arizona State University (Publisher)
Created2017
155645-Thumbnail Image.png
Description
This research focuses on assessing the impact of various process mapping activities aimed at improving students' abilities to plan for Building Information Modeling (BIM). During the various educational activities, students were tasked with generating process maps to illustrate plans for hypothetical construction projects. Several different educational approaches for developing process

This research focuses on assessing the impact of various process mapping activities aimed at improving students' abilities to plan for Building Information Modeling (BIM). During the various educational activities, students were tasked with generating process maps to illustrate plans for hypothetical construction projects. Several different educational approaches for developing process maps were used, beginning in the Fall 2015 semester. In all iterations of the learning activity, students were asked to create level 1 (project-specific) and level 2 (BIM use-specific) process maps based on a previously published BIM Project Execution Planning Guide. In Fall 2015, a peer review activity was conducted. In Spring 2016, a collaborative activity was conducted. Beginning in the Fall 2016 and Spring 2017 semesters, an additional process mapping activity was conducted aimed at separating process mapping and BIM planning into separate activities. In Fall 2016, the BIM activity was conducted in groups of three whereas in Spring 2017, the students were asked to create individual process maps for the given BIM use. To understand the impact of the activity on students' perception of their own knowledge, a pre-and post-activity questionnaire was developed. It covered questions related to: (i) students' ability to create a process map, (ii) students' perception about the importance of a process map and (iii) students' perception about their own knowledge of the BIM execution process. The process maps were analyzed using a grading rubric developed by the author. The grading rubric is the major contribution of the work as there is no existing rubric to assess a BIM process map. The grading rubric divides each process map into five sections, including: core activity; activities preceding the core activity; activities following the core activity; loop/iteration; and communication across the swim lanes. The rubric consist of two parts that evaluate (i) the ability of students to demonstrate each section and (ii) the quality of demonstration of each section. The author conducted an inter-rater reliability index to validate the rubric. This inter-rater reliability index compares the scores students’ process maps were when assessed by graduate students, faculty, and industry practitioners. The reviewers graded the same set of twelve process maps. The inter-rater reliability index was found to be 0.21, which indicates a fair agreement between the graders. The non-BIM activity approach was perceived as the most impactful approach by the students. The assessment of the process maps with the rubric indicated that the non-BIM approach was the most impactful approach for enabling students to demonstrate their ability to create a process map.
ContributorsPerikamana, Aparna (Author) / Ayer, Steven K (Thesis advisor) / Chasey, Allan D (Committee member) / Parrish, Kristen D (Committee member) / Arizona State University (Publisher)
Created2017
Description
Horizontal Directional Drilling (HDD) is a growing and expanding trenchless method utilized to install pipelines from 2 to 60 inch diameters for lengths over 10,000 foot. To date, there are not many public documents where direct costs and bid prices incurred by HDD installations are available and analyzed. The objective

Horizontal Directional Drilling (HDD) is a growing and expanding trenchless method utilized to install pipelines from 2 to 60 inch diameters for lengths over 10,000 foot. To date, there are not many public documents where direct costs and bid prices incurred by HDD installations are available and analyzed. The objective is to provide a better understanding of the factors affecting the bid prices of these projects. The first section of the thesis analyzes how project parameters such as product diameter, bore length and soil conditions affect the bid price of water and wastewater pipeline installations using HDD. Through multiple linear regressions, the effect of project parameters on bid prices of small, medium and large rigs projects is extracted. The results were further investigated to gain a better understanding of bid factors that influence the relationship between total cost and the project parameters. The second section uses unit cost, based on bid prices, to compare the costs incurred by defined categories. Parameters such as community type, product type, soil conditions, and geographical region were used in the analysis. Furthermore, using average unit cost from 2001 to 2009, HDD project cost trends are briefly analyzed against the main variations of the US economy from the same time horizon by using economic indicators. It was determined that project geometric factors influence more the bid price of small rig projects than large rig projects because external factors including market rates and economic situation have an increasing impact on bid prices when rig size increases. It was observed that bid price variation of HDD projects over years followed the same trend as the US economic variation described by economic indicators.
ContributorsVilfrant, Emmania Claudyne (Author) / Ariaratnam, Samuel T (Thesis advisor) / Lueke, Jason S (Committee member) / Chasey, Allan D (Committee member) / Arizona State University (Publisher)
Created2010