Matching Items (1,060)
Filtering by

Clear all filters

151681-Thumbnail Image.png
Description
Using experience, observations, data, current research, and writings in the field of volunteer management, it was determined there was a need to study the effects of leadership/management practices on the productivity outcomes of a volunteer construction workforce. A simple wood bench that would be tiled and painted was designed to

Using experience, observations, data, current research, and writings in the field of volunteer management, it was determined there was a need to study the effects of leadership/management practices on the productivity outcomes of a volunteer construction workforce. A simple wood bench that would be tiled and painted was designed to test the areas of Time, Waste, Quality, Safety, and Satisfaction of different volunteer groups. The challenge was bolstered by giving the teams no power tools and limited available resources. A simple design of experiment model was used to test highs and lows in the three management techniques of Instruction, Help, and Encouragement. Each scenario was tested multiple times. Data was collected, normalized and analyzed using statistical analysis software. A few significant findings were discovered. The first; the research showed that there was no significant correlation between the management practices of the leader and the satisfaction of the volunteers. The second; the research also showed when further analyzed into specific realistic scenarios that the organizations would be better to focus on high amounts of Help and Encouragement in order to maximize the productivity of their volunteer construction workforce. This is significant as it allows NPO's and governments to focus their attention where best suited to produce results. The results were shared and the study was further validated as "significant" by conducting interviews with experts in the construction nonprofit sector.
ContributorsPrigge, Diedrich (Author) / Sullivan, Kenneth (Thesis advisor) / Wiezel, Avi (Committee member) / Badger, William (Committee member) / Arizona State University (Publisher)
Created2013
152185-Thumbnail Image.png
Description
Over the past couple of decades, quality has been an area of increased focus. Multiple models and approaches have been proposed to measure the quality in the construction industry. This paper focuses on determining the quality of one of the types of roofing systems used in the construction industry, i.e.

Over the past couple of decades, quality has been an area of increased focus. Multiple models and approaches have been proposed to measure the quality in the construction industry. This paper focuses on determining the quality of one of the types of roofing systems used in the construction industry, i.e. Sprayed Polyurethane Foam Roofs (SPF roofs). Thirty seven urethane coated SPF roofs that were installed in 2005 / 2006 were visually inspected to measure the percentage of blisters and repairs three times over a period of 4 year, 6 year and 7 year marks. A repairing criteria was established after a 6 year mark based on the data that were reported to contractors as vulnerable roofs. Furthermore, the relation between four possible contributing time of installation factors i.e. contractor, demographics, season, and difficulty (number of penetrations and size of the roof in square feet) that could affect the quality of the roof was determined. Demographics and difficulty did not affect the quality of the roofs whereas the contractor and the season when the roof was installed did affect the quality of the roofs.
ContributorsGajjar, Dhaval (Author) / Kashiwagi, Dean (Thesis advisor) / Sullivan, Kenneth (Committee member) / Badger, William (Committee member) / Arizona State University (Publisher)
Created2013
151282-Thumbnail Image.png
Description
The goal of this research study was to identify the competencies the Project Manager (PM) will need to respond to the challenges the construction industry faces in 2022 and beyond. The study revealed twenty-one emerging challenges for construction PMs grouped into four primary disruptive forces: workforce demographics, globalization, rapidly evolving

The goal of this research study was to identify the competencies the Project Manager (PM) will need to respond to the challenges the construction industry faces in 2022 and beyond. The study revealed twenty-one emerging challenges for construction PMs grouped into four primary disruptive forces: workforce demographics, globalization, rapidly evolving technology, and changing organizational structures. The future PM will respond to these emerging challenges using a combination of fourteen competencies. The competencies are grouped into four categories: technical (multi-disciplined, practical understanding of technology), management (keen business insight, understanding of project management, knowledge network building, continuous risk monitoring), cognitive (complex decisions making, emotional maturity, effective communication), and leadership (leveraging diverse thinking, building relationships, engaging others, mentoring, building trust). Popular data collection methods used in project management research, such as surveys and interviews, have received criticism about the differences between stated responses to questions, what respondents say they will do, and revealed preferences, what they actually practice in the workplace. Rather than relying on surveys, this research study utilized information generated from games and exercises bundled into one-day training seminars conducted by Construction Industry Institute (CII) companies for current and upcoming generations of PMs. Educational games and exercises provide participants with the opportunity to apply classroom learning and workplace experience to resolve issues presented in real-world scenarios, providing responses that are more closely aligned with the actual decisions and activities occurring on projects. The future competencies were identified by combining results of the literature review with information from the games and exercises through an iterative cycle of data mining, analysis, and consolidation review sessions with CII members. This competency forecast will be used as a basis for company recruiting and to create tools for professional development programs and project management education at the university level. In addition to the competency forecast, the research identified simulation games and exercises as components of a project management development program in a classroom setting. An instrument that links the emerging challenges with the fourteen competencies and learning tools that facilitate the mastering of these competencies has also been developed.
ContributorsKing, Cynthia Joyce (Author) / Wiezel, Avi (Thesis advisor) / Badger, William (Committee member) / Sullivan, Kenneth (Committee member) / Arizona State University (Publisher)
Created2012
152854-Thumbnail Image.png
Description
The construction industry has accepted the uncertainty that is included with every project that is initiated. Because of the existing uncertainty, best practices with risk management are commonly recommended and educated to industry participants. However, the current status of the construction industry's ability to manage risk was found to be

The construction industry has accepted the uncertainty that is included with every project that is initiated. Because of the existing uncertainty, best practices with risk management are commonly recommended and educated to industry participants. However, the current status of the construction industry's ability to manage risk was found to be limited, unstructured, and inadequate. Furthermore, many barriers block organizations from implementing and improving risk management practices. A significant barrier with improving risk management methods is the lack of evidence that clearly demonstrates the need to improve risk management practices. Logical explanations of the benefits of risk management doesn't provide the necessary justification or motivation needed for many organizations to dedicate resources towards improving risk management.

Nevertheless, some organizations understand the importance of risk management practices and have begun to measure their risk maturity in order to identify weaknesses and improve risk management practices. Risk maturity measures the organization's ability and perceptions towards risk management. It is possible that many of the barriers to improving risk management would not exist if increased risk maturity was found to have a positive correlation with successful project performance.

The comprehensive hypothesis of the research is that increased risk maturity improves project performance. An exploratory study was conducted on data collected to identify measurable benefits with risk management. Quantitative and qualitative data was collected on 266 construction projects over a seven year period. Multiple statistical analyses were performed on the data and found a positive correlations between risk maturity and project performance. A positive correlations was found between customer satisfaction and contractors risk maturity. Additional findings from the recorded data included the increased ability to predict risks during construction projects within an organization. These findings provide clear reasoning for organizations to devote additional resources in which improve their risk management practices.
ContributorsPerrenoud, Anthony (Author) / Sullivan, Kenneth T. (Thesis advisor) / Weizel, Avi (Committee member) / Badger, William (Committee member) / Arizona State University (Publisher)
Created2014
152888-Thumbnail Image.png
Description
Owner organizations in the architecture, engineering, and construction (AEC) industry are presented with a wide variety of project delivery approaches. Implementation of these approaches, while enticing due to their potential to save money, reduce schedule delays, or improve quality, is extremely difficult to accomplish and requires a concerted change management

Owner organizations in the architecture, engineering, and construction (AEC) industry are presented with a wide variety of project delivery approaches. Implementation of these approaches, while enticing due to their potential to save money, reduce schedule delays, or improve quality, is extremely difficult to accomplish and requires a concerted change management effort. Research in the field of organizational behavior cautions that perhaps more than half of all organizational change efforts fail to accomplish their intended objectives. This study utilizes an action research approach to analyze change message delivery within owner organizations, model owner project team readiness and adoption of change, and identify the most frequently encountered types of resistance from lead project members. The analysis methodology included Spearman's rank order correlation, variable selection testing via three methods of hierarchical linear regression, relative weight analysis, and one-way ANOVA. Key findings from this study include recommendations for communicating the change message within owner organizations, empirical validation of critical predictors for change readiness and change adoption among project teams, and identification of the most frequently encountered resistive behaviors within change implementation in the AEC industry. A key contribution of this research is the recommendation of change management strategies for use by change practitioners.
ContributorsLines, Brian (Author) / Sullivan, Kenneth (Thesis advisor) / Wiezel, Avi (Committee member) / Badger, William (Committee member) / Arizona State University (Publisher)
Created2014
153080-Thumbnail Image.png
Description
Qualifications based selection (QBS) of construction services uses a variety of criteria to evaluate proponents and select a contractor for the project. The criteria typically fall into three categories: past performance and technical capability, key personnel, and price, with price often being considered the most important factor in selection. Evaluation

Qualifications based selection (QBS) of construction services uses a variety of criteria to evaluate proponents and select a contractor for the project. The criteria typically fall into three categories: past performance and technical capability, key personnel, and price, with price often being considered the most important factor in selection. Evaluation and the merits of the key personnel category is not well described or discussed in research. Prior research has investigated the evaluation criteria elements and their ability to differentiate proponents. This case study uses QBS evaluation data from fifty-eight construction projects to show that use of a structured interview process provides the highest level of differentiation of qualifications of proponents, as compared to the proposed price and the technical proposal. The results of the analysis also indicate: 1) the key personnel element (the interview) is statistically more important than price,

2) Contractors who propose on projects using QBS should use their best people in proposal response, and 3) Contractors should educate/prepare their teams for interviews, people count.
ContributorsSawyer, Jeff T (Author) / Sullivan, Kennth S (Thesis advisor) / Wiezel, Avi (Committee member) / Badger, William (Committee member) / Arizona State University (Publisher)
Created2014