Matching Items (12)
Filtering by

Clear all filters

151681-Thumbnail Image.png
Description
Using experience, observations, data, current research, and writings in the field of volunteer management, it was determined there was a need to study the effects of leadership/management practices on the productivity outcomes of a volunteer construction workforce. A simple wood bench that would be tiled and painted was designed to

Using experience, observations, data, current research, and writings in the field of volunteer management, it was determined there was a need to study the effects of leadership/management practices on the productivity outcomes of a volunteer construction workforce. A simple wood bench that would be tiled and painted was designed to test the areas of Time, Waste, Quality, Safety, and Satisfaction of different volunteer groups. The challenge was bolstered by giving the teams no power tools and limited available resources. A simple design of experiment model was used to test highs and lows in the three management techniques of Instruction, Help, and Encouragement. Each scenario was tested multiple times. Data was collected, normalized and analyzed using statistical analysis software. A few significant findings were discovered. The first; the research showed that there was no significant correlation between the management practices of the leader and the satisfaction of the volunteers. The second; the research also showed when further analyzed into specific realistic scenarios that the organizations would be better to focus on high amounts of Help and Encouragement in order to maximize the productivity of their volunteer construction workforce. This is significant as it allows NPO's and governments to focus their attention where best suited to produce results. The results were shared and the study was further validated as "significant" by conducting interviews with experts in the construction nonprofit sector.
ContributorsPrigge, Diedrich (Author) / Sullivan, Kenneth (Thesis advisor) / Wiezel, Avi (Committee member) / Badger, William (Committee member) / Arizona State University (Publisher)
Created2013
151282-Thumbnail Image.png
Description
The goal of this research study was to identify the competencies the Project Manager (PM) will need to respond to the challenges the construction industry faces in 2022 and beyond. The study revealed twenty-one emerging challenges for construction PMs grouped into four primary disruptive forces: workforce demographics, globalization, rapidly evolving

The goal of this research study was to identify the competencies the Project Manager (PM) will need to respond to the challenges the construction industry faces in 2022 and beyond. The study revealed twenty-one emerging challenges for construction PMs grouped into four primary disruptive forces: workforce demographics, globalization, rapidly evolving technology, and changing organizational structures. The future PM will respond to these emerging challenges using a combination of fourteen competencies. The competencies are grouped into four categories: technical (multi-disciplined, practical understanding of technology), management (keen business insight, understanding of project management, knowledge network building, continuous risk monitoring), cognitive (complex decisions making, emotional maturity, effective communication), and leadership (leveraging diverse thinking, building relationships, engaging others, mentoring, building trust). Popular data collection methods used in project management research, such as surveys and interviews, have received criticism about the differences between stated responses to questions, what respondents say they will do, and revealed preferences, what they actually practice in the workplace. Rather than relying on surveys, this research study utilized information generated from games and exercises bundled into one-day training seminars conducted by Construction Industry Institute (CII) companies for current and upcoming generations of PMs. Educational games and exercises provide participants with the opportunity to apply classroom learning and workplace experience to resolve issues presented in real-world scenarios, providing responses that are more closely aligned with the actual decisions and activities occurring on projects. The future competencies were identified by combining results of the literature review with information from the games and exercises through an iterative cycle of data mining, analysis, and consolidation review sessions with CII members. This competency forecast will be used as a basis for company recruiting and to create tools for professional development programs and project management education at the university level. In addition to the competency forecast, the research identified simulation games and exercises as components of a project management development program in a classroom setting. An instrument that links the emerging challenges with the fourteen competencies and learning tools that facilitate the mastering of these competencies has also been developed.
ContributorsKing, Cynthia Joyce (Author) / Wiezel, Avi (Thesis advisor) / Badger, William (Committee member) / Sullivan, Kenneth (Committee member) / Arizona State University (Publisher)
Created2012
152888-Thumbnail Image.png
Description
Owner organizations in the architecture, engineering, and construction (AEC) industry are presented with a wide variety of project delivery approaches. Implementation of these approaches, while enticing due to their potential to save money, reduce schedule delays, or improve quality, is extremely difficult to accomplish and requires a concerted change management

Owner organizations in the architecture, engineering, and construction (AEC) industry are presented with a wide variety of project delivery approaches. Implementation of these approaches, while enticing due to their potential to save money, reduce schedule delays, or improve quality, is extremely difficult to accomplish and requires a concerted change management effort. Research in the field of organizational behavior cautions that perhaps more than half of all organizational change efforts fail to accomplish their intended objectives. This study utilizes an action research approach to analyze change message delivery within owner organizations, model owner project team readiness and adoption of change, and identify the most frequently encountered types of resistance from lead project members. The analysis methodology included Spearman's rank order correlation, variable selection testing via three methods of hierarchical linear regression, relative weight analysis, and one-way ANOVA. Key findings from this study include recommendations for communicating the change message within owner organizations, empirical validation of critical predictors for change readiness and change adoption among project teams, and identification of the most frequently encountered resistive behaviors within change implementation in the AEC industry. A key contribution of this research is the recommendation of change management strategies for use by change practitioners.
ContributorsLines, Brian (Author) / Sullivan, Kenneth (Thesis advisor) / Wiezel, Avi (Committee member) / Badger, William (Committee member) / Arizona State University (Publisher)
Created2014
150085-Thumbnail Image.png
Description
The wood-framing trade has not sufficiently been investigated to understand the work task sequencing and coordination among crew members. A new mental framework for a performing crew was developed and tested through four case studies. This framework ensured similar team performance as the one provided by task micro-scheduling in planning

The wood-framing trade has not sufficiently been investigated to understand the work task sequencing and coordination among crew members. A new mental framework for a performing crew was developed and tested through four case studies. This framework ensured similar team performance as the one provided by task micro-scheduling in planning software. It also allowed evaluation of the effect of individual coordination within the crew on the crew's productivity. Using design information, a list of micro-activities/tasks and their predecessors was automatically generated for each piece of lumber in the four wood frames. The task precedence was generated by applying elementary geometrical and technological reasoning to each frame. Then, the duration of each task was determined based on observations from videotaped activities. Primavera's (P6) resource leveling rules were used to calculate the sequencing of tasks and the minimum duration of the whole activity for various crew sizes. The results showed quick convergence towards the minimum production time and allowed to use information from Building Information Models (BIM) to automatically establish the optimal crew sizes for frames. Late Start (LS) leveling priority rule gave the shortest duration in every case. However, the logic of LS tasks rule is too complex to be conveyed to the framing crew. Therefore, the new mental framework of a well performing framer was developed and tested to ensure high coordination. This mental framework, based on five simple rules, can be easily taught to the crew and ensures a crew productivity congruent with the one provided by the LS logic. The case studies indicate that once the worst framer in the crew surpasses the limit of 11% deviation from applying the said five rules, every additional percent of deviation reduces the productivity of the whole crew by about 4%.
ContributorsMaghiar, Marcel M (Author) / Wiezel, Avi (Thesis advisor) / Mitropoulos, Panagiotis (Committee member) / Cooke, Nancy J. (Committee member) / Arizona State University (Publisher)
Created2011
151243-Thumbnail Image.png
Description
The construction industry faces important performance problems such as low productivity, poor quality of work, and work-related accidents and injuries. Creating a high reliability work system that is simultaneously highly productive and exceptionally safe has become a challenge for construction practitioners and scholars. The main goal of this dissertation was

The construction industry faces important performance problems such as low productivity, poor quality of work, and work-related accidents and injuries. Creating a high reliability work system that is simultaneously highly productive and exceptionally safe has become a challenge for construction practitioners and scholars. The main goal of this dissertation was to create an understanding of high reliability construction work systems based on lessons from the production practices of high performance work crews. High performance work crews are defined as the work crews that constantly reach and maintain a high level of productivity and exceptional safety record while delivering high quality of work. This study was conceptualized on findings from High Reliability Organizations and with a primary focus on lean construction, human factors, safety, and error management. Toward the research objective, this dissertation answered two major questions. First, it explored the task factors and project attributes that shape and increase workers' task demands and consequently affect workers' safety, production, and quality performance. Second, it explored and investigated the production practices of construction field supervisors (foremen) to understand how successful supervisors regulate task and project demands to create a highly reliable work process. Employing case study methodology, this study explored and analyzed the work practices of six work crews and crew supervisors in different trades including concrete, masonry, and hot asphalt roofing construction. The case studies included one exceptional and one average performing crew from each trade. Four major factors were considered in the selection of exceptional crew supervisors: (1) safety performance, (2) production performance, (3) quality performance, and (4) the level of project difficulty they supervised. The data collection was carried out in three phases including: (1) interview with field supervisors to understand their production practices, (2) survey and interview with workers to understand their perception and to identify the major sources of task demands, and (3) several close field observations. Each trade's specific findings including task demands, project attributes, and production practices used by crew supervisors are presented in a separate chapter. At the end the production practices that converged to create high reliability work systems are summarized and presented in nine major categories.
ContributorsMemarian, Babak (Author) / Bashford, Howard (Thesis advisor) / Boren, Rebecca (Committee member) / Wiezel, Avi (Committee member) / Arizona State University (Publisher)
Created2012
157437-Thumbnail Image.png
Description
The success or failure of projects is not determined only by procedures, tasks, and technologies, but also by the project team and its effectiveness. In order to lead project teams towards successful outcomes, project managers must maintain high quality relationships in the workplace. When looking at employees’ relationships in the

The success or failure of projects is not determined only by procedures, tasks, and technologies, but also by the project team and its effectiveness. In order to lead project teams towards successful outcomes, project managers must maintain high quality relationships in the workplace. When looking at employees’ relationships in the workplace, Social Exchange Theory introduces two types of exchanges: employee-organization and leader-member exchanges. While both types of exchanges focus exclusively on the employee’s longitudinal relationships, the interpersonal relationships among the team members are usually overlooked.

This research presents the results of a quantitative study of the interpersonal relationships of 327 project managers and assistant project managers in their workplace. Specifically, the study investigates if the quality of the relationship with particular stakeholders, such as one’s immediate supervisor (boss), peers, or subordinates, drives the individual’s quality of the relationship with other stakeholders.

Contrary to the expectations, in strictly hierarchical organizations (one direct supervisor), there is no significant correlation between the quality of relationships with the boss and the overall quality of the individual’s relationships. However, in the case of matrix organizations (two or three bosses), there are significant correlations between several variables such as the quality of the relationship, perceived importance and the time spent with each stakeholder, as well the inclination of the participant towards leadership actions. The driving relationship in matrix organizations is the one with “the most important peer”.
ContributorsK. Jamali, M. Hossein (Author) / Wiezel, Avi (Thesis advisor) / Sullivan, Kenneth T. (Committee member) / Badger, William (Committee member) / Arizona State University (Publisher)
Created2019
156647-Thumbnail Image.png
Description
Implementing Building Information Modeling (BIM) in construction projects has many potential benefits, but issues of projects can hinder its realization in practice. Although BIM involves using the technology, more than four-fifths of the recurring issues in current BIM-based construction projects are related to the people and processes (i.e., the non-technological

Implementing Building Information Modeling (BIM) in construction projects has many potential benefits, but issues of projects can hinder its realization in practice. Although BIM involves using the technology, more than four-fifths of the recurring issues in current BIM-based construction projects are related to the people and processes (i.e., the non-technological elements of BIM). Therefore, in addition to the technological skills required for using BIM, educators should also prepare university graduates with the non-technological skills required for managing the people and processes of BIM. This research’s objective is to develop a learning module that teaches the non-technological skills for addressing common, people- and process-related, issues in BIM-based construction projects. To achieve this objective, this research outlines the steps taken to create the learning module and identify its impact on a BIM course. The contribution of this research is in the understanding of the pedagogical value of the developed problem-based learning module and documenting the learning module’s development process.
ContributorsAbdul Rahman, Abdul Rahimi Bin (Author) / Ayer, Steven K (Thesis advisor) / Tang, Pingbo (Committee member) / Wiezel, Avi (Committee member) / Arizona State University (Publisher)
Created2018
156922-Thumbnail Image.png
Description
The discipline of continuing professional development (CPD) is well defined and established within a variety of industries, such as medical, legal, and financial. The built environment is a less defined and mature industry with respect to educational pathways and professional education, with no uniform structure. Occupational licensing, such as registered

The discipline of continuing professional development (CPD) is well defined and established within a variety of industries, such as medical, legal, and financial. The built environment is a less defined and mature industry with respect to educational pathways and professional education, with no uniform structure. Occupational licensing, such as registered nurses, certified professional accountants, and others are well known within both their industries and the public. Additionally, occupational core-competencies are well established. Planning is a core skill set within the built environment and construction management. Definitions of the term “planning” vary quite broadly across the built environment, but generally includes activities such as risk identification, scope identification, and scheduling. Understanding how professionals in the built environment learn to plan is critical to meeting CPD needs for planning skills and the ability of a professional to “plan” effectively. Many planning tools and software have been developed, but often rely on an individual professional’s personal experiences and abilities. Limited literature in the field of professional education in the built environment has left a gap on the topic of how to train professionals in planning competencies. Survey results indicate that current training is not meeting the expectations of professionals, as only 16 percent of professionals are trained how to plan using their preferred method of learning. While on-the-job training is the primary format, the most preferred format is internal company training, but only 54 percent of companies provide this format. Mann-Whitney U and Kruskal Wallis tests were conducted and revealed that organizations with internal training programs have higher employee satisfaction with their organization’s planning process. Further, organizations with internal training programs are seen as having a more formal internal planning process. Research is needed to develop CPD within construction management and provide the foundation upon which a professional education structure can be created. An andragogically-centered schema for a heuristic approach to construction CPD is developed and tested on a seminar for pre-project planning. The full instructional design of the seminar using the model is disclosed and seminar results showed positive results and participants achieved high levels of learning.
ContributorsHurtado, Kristen (Author) / Sullivan, Kenneth (Thesis advisor) / Wiezel, Avi (Committee member) / Badger, William (Committee member) / Arizona State University (Publisher)
Created2018
157056-Thumbnail Image.png
Description
Planning efforts conducted during the early stages of a construction project, known

as front end planning (FEP), have a large impact on project success and significant

influence on the configuration of the final project. As a key component of FEP, front end

engineering design (FEED) plays an essential role in the overall success

Planning efforts conducted during the early stages of a construction project, known

as front end planning (FEP), have a large impact on project success and significant

influence on the configuration of the final project. As a key component of FEP, front end

engineering design (FEED) plays an essential role in the overall success of large industrial

projects. The primary objective of this dissertation focuses on FEED maturity and accuracy

and its impact on project performance. The author was a member of the Construction

Industry Institute (CII) Research Team (RT) 331, which was tasked to develop the FEED

Maturity and Accuracy Total Rating System (FEED MATRS), pronounced “feed matters.”

This dissertation provides the motivation, methodology, data analysis, research findings

(which include significant correlations between the maturity and accuracy of FEED and

project performance), applicability and contributions to academia and industry. A scientific

research methodology was employed in this dissertation that included a literature review,

focus groups, an industry survey, data collection workshops, in-progress projects testing,

and statistical analysis of project performance. The results presented in this dissertation are

based on input from 128 experts in 57 organizations and a data sample of 33 completed

and 11 on-going large industrial projects representing over $13.9 billion of total installed

cost. The contributions of this work include: (1) developing a tested FEED definition for

the large industrial projects sector, (2) determining the industry’s state of practice for

measuring FEED deliverables, (3) developing an objective and scalable two-dimensional

method to measure FEED maturity and accuracy, and (4) quantifying that projects with

high FEED maturity and accuracy outperformed projects with low FEED maturity and

accuracy by 24 percent in terms of cost growth, in relation to the approved budget.
ContributorsYussef, Abdulrahman (Author) / Gibson, Jr., G. Edward (Thesis advisor) / El Asmar, Mounir (Thesis advisor) / Bearup, Wylie (Committee member) / Wiezel, Avi (Committee member) / Arizona State University (Publisher)
Created2019
154291-Thumbnail Image.png
Description
ABSTRACT

The objective of this dissertation is to identify a recommended balance between

leadership and management activities of a project manager who aims to rehabilitate a distressed construction project.

The data for this research was collected from 338 construction project professionals belonging to fifteen large construction companies who participated in leadership seminars originated

ABSTRACT

The objective of this dissertation is to identify a recommended balance between

leadership and management activities of a project manager who aims to rehabilitate a distressed construction project.

The data for this research was collected from 338 construction project professionals belonging to fifteen large construction companies who participated in leadership seminars originated by professors from Arizona State University. The seminars contained various leadership games and exercises that were designed specifically to collect data about leadership and management actions taken by the project managers.

The data from one of the games, called “Project from Hell” (PFH), was used in this research. The PFH game presents the participants with a set of fifty-two actions cards written on a deck of game cards and asks them to select the ten action cards they perceive as being most effective for turning a troubled construction project around. Each suit of the deck represents a different category of actions, focusing on either Traditional Leadership (Hearts), Best Value Leadership (Diamonds), Traditional Management (Spades), or Micro- Management (Clubs).

Statistical analysis of the results revealed that only sixteen of the fifty-two actions cards were selected with statistically significant consistency. Of these sixteen actions, six actions were form Traditional Management actions, five were Traditional Leadership actions, and five were Best Value Leadership actions. This rendered a recommended balance of 62% leadership activities vs. 38% management activities for project managers to rehabilitate distressed construction projects. It was also found that the same balance is recommended for the normal condition construction projects. The calculated weighted

i

scores for ranking the sixteen effective leadership and management actions revealed that the five Traditional Management actions are the top-most effective actions. This demonstrates the importance of stand still management actions in rehabilitating in trouble construction projects

The findings were converted into easy to implement guidelines about how project managers can change habits to increase their effectiveness by focusing on the right type of actions.

A generalization of the methodology for interpreting the results of any study based on selection of activities, was also developed.
ContributorsBehzad, Navid (Author) / Wiezel, Avi (Thesis advisor) / Gibson, Jr., G. Edward (Committee member) / Sullivan, Kenneth (Committee member) / Arizona State University (Publisher)
Created2016