Matching Items (2)
Filtering by

Clear all filters

151895-Thumbnail Image.png
Description
Since its launch by the US Green Building Council (USGBC), Leadership in Energy and Environmental Design (LEED) certification has been postured as the "gold standard" for environmentally conscious, sustainable building design, construction and operations. However, as a "living measurement", one which requires ongoing evaluation and reporting of attainment and compliance

Since its launch by the US Green Building Council (USGBC), Leadership in Energy and Environmental Design (LEED) certification has been postured as the "gold standard" for environmentally conscious, sustainable building design, construction and operations. However, as a "living measurement", one which requires ongoing evaluation and reporting of attainment and compliance with LEED certification requirements, there is none. Once awarded, LEED certification does not have a required reporting component to effectively track continued adherence to LEED standards. In addition, there is no expiry tied to the certification; once obtained, a LEED certification rating is presumed to be a valid representation of project certification status. Therefore, LEED lacks a requirement to demonstrate environmental impact of construction materials and building systems over the entire life of the project. Consequently, LEED certification is merely a label rather than a true representation of ongoing adherence to program performance requirements over time. Without continued monitoring and reporting of building design and construction features, and in the absence of recertification requirements, LEED is, in reality, a gold star rather than a gold standard. This thesis examines the lack of required ongoing monitoring, reporting, or recertification requirements following the award by the USGBC of LEED certification; compares LEED with other international programs which do have ongoing reporting or recertification requirements; demonstrates the need and benefit of ongoing reporting or recertification requirements; and explores possible methods for implementation of mandatory reporting requirements within the program.
ContributorsCarpenter, Anne Therese (Author) / Olson, Larry (Thesis advisor) / Hild, Nicholas (Committee member) / Brown, Albert (Committee member) / Arizona State University (Publisher)
Created2013
150940-Thumbnail Image.png
Description
ABSTRACT Leadership in Energy and Environmental Design (LEED) is a non-governmental organization of U.S. Green Building Council (USGBC) which promotes a sustainable built environment with its rating systems. One of the building segments which it considers is healthcare, where it is a challenge to identify the most cost-effective variety of

ABSTRACT Leadership in Energy and Environmental Design (LEED) is a non-governmental organization of U.S. Green Building Council (USGBC) which promotes a sustainable built environment with its rating systems. One of the building segments which it considers is healthcare, where it is a challenge to identify the most cost-effective variety of complex equipments, to meet the demand for 24/7 health care and diagnosis, and implement various energy efficient strategies in inpatient hospitals. According to their “End Use Monitoring” study, Hospital Energy Alliances (HEA), an initiative of U.S. Department of Energy (DOE), reducing plug load reduces hospital energy consumption. The aim of this thesis is to investigate the extent to which realistic changes to the building envelope, together with HVAC and operation schedules would allow LEED credits to be earned in the DOE–hospital prototype. The scope of this research is to specifically investigate the inpatient block where patient stays longer. However, to obtain LEED credits the percentage cost saving should be considered along with the end use monitoring. Several steps have been taken to identify the optimal set of the end use results by adopting the Whole Building Energy Simulation option of the LEED Energy & Atmosphere (EA) pre– requisite 2: Minimum Energy Performance. The initial step includes evaluating certain LEED criteria consistent with ASHRAE Standard 90.1–2007 with the constraint that hospital prototype is to be upgraded from Standard 2004 to Standard 2007. The simulation method stipulates energy conservation measures as well as utility costing to enhance the LEED credits. A series of simulations with different values of Light Power Density, Sizing Factors, Chiller Coefficient of Performance, Boiler Efficiency, Plug Loads and utility cost were run for a variety of end uses with the extreme climatic condition of Phoenix. These assessments are then compared and used as a framework for a proposed interactive design decision approach. As a result, a total of 19.4% energy savings and 20% utility cost savings were achieved by the building simulation tool, which refer to 5 and 7 LEED credits respectively. The study develops a proper framework for future evaluations intended to achieve more LEED points.
ContributorsHaque, Sadia Khandaker (Author) / Reddy, T A (Thesis advisor) / Bryan, Harvey J. (Committee member) / Addison, Marlin S. (Committee member) / Arizona State University (Publisher)
Created2012