In today's era a lot of the construction projects suffer from time delay, cost overrun and quality defect. Incentive provisions are found to be a contracting strategy to address this potential problem. During last decade incentive mechanisms have gained importance, and they are starting to become adopted in the construction

In today's era a lot of the construction projects suffer from time delay, cost overrun and quality defect. Incentive provisions are found to be a contracting strategy to address this potential problem. During last decade incentive mechanisms have gained importance, and they are starting to become adopted in the construction projects. Most of the previous research done in this area was purely qualitative, with a few quantitative studies. This study aims to quantify the performance of incentives in construction by collecting the data from more than 30 projects in United States through a questionnaire survey. First, literature review addresses the previous research work related to incentive types, incentives in construction industry, incentives in other industry and benefits of incentives. Second, the collected data is analyzed with statistical methods to test the significance of observed changes between two data sets i.e. incentive projects and non-incentive projects. Finally, the analysis results provide evidence for the significant impact of having incentives; reduced the cost and schedule growth in construction projects in United States.
ContributorsPaladugu, Bala Sai Krishna (Author) / El Asmar, Mounir (Thesis advisor) / Ernzen, James (Committee member) / Sullivan, Kenneth (Committee member) / Arizona State University (Publisher)
Created2015
157096-Thumbnail Image.png
Description
The construction industry has been growing over the past few years, but it is facing numerous challenges, related to craft labor availability and declining productivity. At the same time, the industry has benefited from computational advancements by leveraging the use of Building Information Modeling (BIM) to create information rich 3D

The construction industry has been growing over the past few years, but it is facing numerous challenges, related to craft labor availability and declining productivity. At the same time, the industry has benefited from computational advancements by leveraging the use of Building Information Modeling (BIM) to create information rich 3D models to enhance the planning, designing, and construction of projects. Augmented Reality (AR) is one technology that could further leverage BIM, especially on the construction site. This research looks at the human performance attributes enabled using AR as the main information delivery tool in the various stages of construction. The results suggest that using AR for information delivery can enhance labor productivity and enable untrained personnel to complete key construction tasks. However, its usability decreases when higher accuracy levels are required. This work contributes to the body of knowledge by empirically testing and validating the performance effects of using AR during construction tasks and highlights the limitations of current generation AR technology related to the construction industry. This work serves as foundation of future industry-based AR applications and research into potential AR implementations.
ContributorsChalhoub, Jad M (Author) / Ayer, Steven K. (Thesis advisor) / Ariaratnam, Samuel T. (Committee member) / Atkinson, Robert K. (Committee member) / Arizona State University (Publisher)
Created2019
154362-Thumbnail Image.png
Description
The semiconductor manufacturing business model provides unique challenges for the design and construction of supporting fabrication facilities. To accommodate the latest semiconductor processes and technologies, manufacturing facilities are constantly re-tooled and upgraded. Common to this sector of construction is the retrofit project environment. This type of construction project introduces a multitude of existing conditions

The semiconductor manufacturing business model provides unique challenges for the design and construction of supporting fabrication facilities. To accommodate the latest semiconductor processes and technologies, manufacturing facilities are constantly re-tooled and upgraded. Common to this sector of construction is the retrofit project environment. This type of construction project introduces a multitude of existing conditions constraints and functions entirely differently than traditional new-build projects. This facility conversion process is further constrained by owner needs for continuous manufacturing operations and a compressed design/construction schedule to meet first-to-market milestones.

To better control the variables within this project environment, Building Information Modeling (BIM) workflows are being explored and introduced into this project typology. The construction supply-chain has also increased their focus on offsite construction techniques to prefabricate components in a controlled environment. The goal is to overlap construction timelines and improve the productivity of workers to meet the increasingly demanding schedules and to reduce on-site congestion. Limited studies exist with regards to the manufacturing retrofit construction environment, particularly when focusing on the effectiveness of BIM and prefabrication workflows. This study fills the gap by studying labor time utilization rates for Building Information Modeling workflows for prefabrication of MEP (mechanical/electrical/plumbing) and process piping equipment in a retrofit construction environment.

A semiconductor manufacturing facility serves as a case-study for this research in which the current state process for utilizing BIM for prefabrication is mapped and analyzed. Labor time utilization is studied through direct observation in relation to the current state modeling process. Qualitative analysis of workflows and quantitative analysis of labor time utilization rates provide workflow interventions which are implemented and compared against the current state modeling process.

This research utilizes a mixed-method approach to explore the hypothesis that reliable/trusted geometry is the most important component for successful implementation of a BIM for prefabrication workflow in a retrofit environment. The end product of this research is the development of a prefaBIM framework for the introduction of a dynamic modeling process for retrofit prefabrication which forms the basis for a model-based delivery system for retrofit prefabrication.
ContributorsCribbs, John (Author) / Chasey, Allan (Thesis advisor) / Ayer, Steven K. (Committee member) / Giel, Brittany (Committee member) / Arizona State University (Publisher)
Created2016