Matching Items (11)
156379-Thumbnail Image.png
Description
Recent studies have identified that contractors in the Saudi construction industry are not the main party that cause risks as owners and other parties have the major share of causing risks. However, with the identification that risks out of contractors’ control are a leading cause of low performance, there is

Recent studies have identified that contractors in the Saudi construction industry are not the main party that cause risks as owners and other parties have the major share of causing risks. However, with the identification that risks out of contractors’ control are a leading cause of low performance, there is a lack of efficient risk mitigation practices in Saudi to manage these risks. The main aim of this dissertation is to assess the current practices applied by contractors to minimize risk out of their control and develop a risk mitigation model to manage these risks. The main objectives of the study are: investigating the risks that are out of contractors’ control, assessing the contractors’ current risk mitigation and performance measurement practices, and finally developing and validating a risk mitigation model to minimize risks out of contractors’ control and measure performance of involved project parties. To achieve the study aim, a mixed methodological approach was adopted. Theoretical approaches were utilized to review previous research and to develop a conceptual risk mitigation framework followed by a practical approach that is considered with collecting data from contractors. The quantitative method was mainly used to meet the study objectives through distributing a survey in the form of a questionnaire. As a consolidation of the study findings, the top ranked risks that are out of contractors’ control were identified. Furthermore, the results identified that the contractors’ current risk management and performance measurement practices are not effective in minimizing projects risks caused by other parties and ineffective in measuring performance of all parties. The developed model focuses on increasing accountability of project parties through mitigating project parties’ activities and risks with measuring the deviations and identifying sources of deviations. Transparency is utilized in the model through sharing weekly updates of the activities and risks combined with updated information of performance measurements of all project parties. The study results showed that project risks can be minimized and projects’ performance can be increased if contractors shift their focus using the developed model from only managing their own activities and risks to managing all project parties’ activities and risks.
ContributorsAlgahtany, Mohammed (Author) / Sullivan, Kenneth (Thesis advisor) / Kashiwagi, Dean (Committee member) / Badger, William (Committee member) / Arizona State University (Publisher)
Created2018
137285-Thumbnail Image.png
Description
The American English and Culture Program (AECP) at Arizona State University is an intensive language program that has taught English to speakers of other languages from over 115 countries. This study focuses on English education from five of those countries by examining the similarities and differences between AECP and English

The American English and Culture Program (AECP) at Arizona State University is an intensive language program that has taught English to speakers of other languages from over 115 countries. This study focuses on English education from five of those countries by examining the similarities and differences between AECP and English education in those countries, as well as analyzing the concerns about English education in these countries and how they may impact students who come to AECP. Those countries are Saudi Arabia, China, Japan, Korea, and Kuwait. The primary characteristics that are analyzed are history of English in relation to that country, the goals of English learning, the teaching methods used in the classes, and textbook content. The implications of this study are to help EFL educators learn about their students' backgrounds in the English language through learning the students' countries' various histories and difficulties concerning English, thus allowing them to help students better transition into the English programs such as AECP. This study also shows what research is readily available about English education in other countries, and reveals that there is a lack of research in some aspects of English education for some countries.
ContributorsMeyer, Elizabeth Kayla (Author) / James, Mark (Thesis director) / Thompson, Robert (Committee member) / Barrett, The Honors College (Contributor) / School of International Letters and Cultures (Contributor) / Department of Chemistry and Biochemistry (Contributor)
Created2014-05
153833-Thumbnail Image.png
Description
Delays are a major cause for concern in the construction industry both globally and locally in Saudi Arabia. This paper identifies the main causes of delay in infrastructure projects in the holy city of Makkah (Saudi Arabia) and compares these with projects around the rest of the country and other

Delays are a major cause for concern in the construction industry both globally and locally in Saudi Arabia. This paper identifies the main causes of delay in infrastructure projects in the holy city of Makkah (Saudi Arabia) and compares these with projects around the rest of the country and other Gulf countries as well. Data were obtained from 49 infrastructure projects that were undertaken by the owner and were analyzed quantitatively to understand the severity and causes of delay. 10 risk factors were identified in this study and these factors were grouped into four categories. The average delay in infrastructure projects in the city of Makkah was found to be 39%. The most severe cause of delay was found to be the land acquisition factor. This highlights the critical land ownership and acquisition issues that is prevailing in Makkah. In addition to this, other factors include contractors’ lack of expertise, haphazard underground utilities (line services), and re-designing. It is concluded that majority of delays were caused from the owner’s side as compared to contractors, consultants, and other project’s stakeholders. This finding was in line with the research findings of the Gulf Countries Construction (GCC) Industry’s literature as well. This study will fill an important practice and research gap for improving the efficiency in project delivery for infrastructure projects in the holy city of Makkah and the Gulf countries at large.
ContributorsElawi, Ghazi Saad A (Author) / Kashiwagi, Dean (Thesis advisor) / Sullivan, Kenneth (Committee member) / Kashiwagi, Jacob (Committee member) / Arizona State University (Publisher)
Created2015
155786-Thumbnail Image.png
Description
Public construction projects in Saudi Arabia have been experiencing performance issues for the past 30 years. There have been many research efforts and publications identifying the problem and potential causes, however, there have been minimal efforts identifying how to mitigate the problem and testing to validate proposed solutions. A literature

Public construction projects in Saudi Arabia have been experiencing performance issues for the past 30 years. There have been many research efforts and publications identifying the problem and potential causes, however, there have been minimal efforts identifying how to mitigate the problem and testing to validate proposed solutions. A literature search has shown that the academic research has had minimal impact in assisting the construction industry to improve its performance. This dissertation aimed to evaluate the impact of construction management research in Saudi construction industry (SCI), and to investigate barriers that hinder the diffusion of implementing the research outcomes in the construction sector in order to develop a research roadmap to bridge the gap between academic research and practice, using the experience of other organizations that have a successful experience in developing the impact of construction management research in the construction industry. In order to achieve the aim of the study, five main objectives were set up which are: evaluate the impact of construction management research in SCI, identify the barriers that affect the implementation of construction management research in SCI, develop a research roadmap to bridge the gap between the research and practice, validating the proposed solution, and proposed implementation plan and review the result from the implementation. A literature research was performed, using 5 academic databases, identifying the impact that R&D has had on the SCI. A questionnaire was also created surveying both researchers and industry professionals. The results show evidence that the current R&D process in Saudi Arabia is not helping the SCI to increase their performance, and needs to be improved. This study provides a potential solution, and an action plan that mirrors one of the most successful research and development programs in the construction industry in the world [+1915 tests, six different countries, 31 states in the U.S. and 98% customer satisfaction]. The solution proposed in this dissertation is unique to the strengths and weaknesses of the research and development programs at universities and research centers in Saudi Arabia. This study is the first study of its kind in Saudi Arabia.
ContributorsAlhammadi, Yasir (Author) / Kashiwagi, Dean (Thesis advisor) / Badger, William (Committee member) / Sullivan, Kenneth (Committee member) / Arizona State University (Publisher)
Created2017
155709-Thumbnail Image.png
Description
ABSTRACT

The current Saudi Arabian (SA) procurement system leads to many losses in money and benefits in projects. Also, the use of the traditional procurement system in SA has been identified as one of the causes for poor performance in the delivery of construction and the major risk to the SA

ABSTRACT

The current Saudi Arabian (SA) procurement system leads to many losses in money and benefits in projects. Also, the use of the traditional procurement system in SA has been identified as one of the causes for poor performance in the delivery of construction and the major risk to the SA government. A questionnaire has been developed and carefully designed based on literature review. The purpose of the survey was to identify the validity of the recent claims that the procurement system in SA is broken and to improve the current SA procurement system. The questionnaire was sent out to 1,396 participants including included 867 engineers, 256 consultants, 93 contractors, 35 owners and 132 architects and 13 academics.

All participants have been registered and licensed professionals at the SA Council for professional engineers, who work in both private and public sectors. The participants are interested in the SA procurement and contracts system with experience ranging from one to more than twenty-five years with the majority of twenty-five years of experience in common construction sectors such as; residential and commercial buildings, healthcare buildings, industrial building and heavy civil construction.

Most of the participants from both private and public sectors agreed with the survey questions subject matter regarding: zone price proposals, contractors' evaluation, risks, planning, projects' scope, owners concern and weekly risks reports (WRR). The survey results showed that the procurement system is the major risk to projects, affects construction projects negatively and is in need of improvement.

Based on the survey and literature review, a model, called Saudi government performance procurement model (SGPPM), has been developed in which the most expert contractor is chosen through four phases: submittals& education, vendors selection, illustration and execution. The resulting model is easy to implement by SA government and does not require special skills or backgrounds.
ContributorsAlofi, Ahmed Abdulrahman (Author) / Kashiwagi, Dean (Thesis advisor) / Sullivan, Kenneth (Committee member) / Kashiwagi, Jacob (Committee member) / Arizona State University (Publisher)
Created2017
155168-Thumbnail Image.png
Description
Saudi Arabia has been facing issues with completing construction projects on time and on budget. It has been documented that 70% of public construction projects are delayed. Studies have identified the low-bid delivery method as an important factor in causing such delays. The procurement system (low-bid) ignores contractors’ performance, and

Saudi Arabia has been facing issues with completing construction projects on time and on budget. It has been documented that 70% of public construction projects are delayed. Studies have identified the low-bid delivery method as an important factor in causing such delays. The procurement system (low-bid) ignores contractors’ performance, and that is reflected in projects’ performance. A case study was performed, at a University campus in northern Saudi Arabia, identifying the major causes of project delays and cost overruns. The University was experiencing delays from 50% to 150%. Also, the actual project costs for four projects were examined and found that all four projects’ costs were higher than the original bid. The delay and cost overruns factors were gathered from the University engineers. A literature research identified one construction management method, best value performance information procurement system (BV PIPS), has documented multiple times its ability to improve project performance. In a comparison using the result of a case study and the results of (BV PIPS), Saudi Arabia’s delivery system was identified as a potential cause of project performance issues. The current procurement system was analyzed and modified to adapt with the (BV PIPS). The proposed procurement system using BV PIPS, which can be implemented in Saudi Arabia, was created with owner side. A large survey was conducted of 761 classified contractors and 43 universities’ representatives who rated causes of delay factors and cost overruns. The delay factors were then compared to delay factors experienced on Saudi construction projects, identified by performing a literature research. The comparison identified 14 important causes of delays. Moreover, the survey showed that classified contractors and universities’ representatives unsatisfied with low-bid, and they agreed with BV PIPS which selecting vendors based on performance with price. The proposed model required a submitted level of experience (LE), risk assessment (RA), and value added (VA). Besides, project managers of vendors should be interviewed during the clarification phase. In addition, venders should submit the project’s scope, technical schedule, milestone schedule, and risk management plan. In the execution phase, vendors should submit a weekly risk report (WRR) and director’s report (DR).
ContributorsAlzara, Majed (Author) / Kashiwagi, Dean (Thesis advisor) / Kashiwagi, Jacob (Committee member) / Al-Tassan, Abdulrahman (Committee member) / Arizona State University (Publisher)
Created2016
155782-Thumbnail Image.png
Description
The issue of women driving remains to be highly debated in Saudi Arabia. Recent developments on its legalization have sparked conversation and discourse, particularly in social media sites like Twitter. Several hashtags have been used to indicate either support or criticism towards the movement.

Examining Twitter tweets and hashtags, the study

The issue of women driving remains to be highly debated in Saudi Arabia. Recent developments on its legalization have sparked conversation and discourse, particularly in social media sites like Twitter. Several hashtags have been used to indicate either support or criticism towards the movement.

Examining Twitter tweets and hashtags, the study explored how the discourse on women driving had been executed, particularly in between genders. The study analyzed a sizeable number of tweets as well as their context via linguistic corpora analysis. Following Norman Fairclough’s framework, the two opposing perspectives were investigated both at a level of textual analysis. The selected tweets were representative of the three hashtags that emerged on the heat of the discourse regarding the issue of women driving in Saudi Arabia: #Women_car_driving, #I_will_drive_my_car_June15, and #I_will_enter_my_kitchen_June15.

The results showed, among others, that tweets with the hashtag #Women_car_driving presented a tremendous support towards the movement. On the other hand strong opposing reactions emerged from the hashtags #I_will_drive_my_car_June15 and #I_will_enter_my_kitchen_June15.
ContributorsAljarallah, Rayya Sulaiman (Author) / Adams, Karen (Thesis advisor) / Gelderen, Elly van (Committee member) / Prior, Matthew (Committee member) / Arizona State University (Publisher)
Created2017
168450-Thumbnail Image.png
Description
As the construction industry in Saudi Arabia was on its way to thriving again. Their growth was due to the unprecedented volume of planned projects such as large-scale and unique projects. Suddenly, the world was faced with one of the most disrupting events in the last century which had a

As the construction industry in Saudi Arabia was on its way to thriving again. Their growth was due to the unprecedented volume of planned projects such as large-scale and unique projects. Suddenly, the world was faced with one of the most disrupting events in the last century which had a devastating impact on the construction industry specifically. This paper explores mainly the impact of the COVID-19 pandemic on construction projects in Saudi Arabia. Particularly, this paper explores how the pandemic and its related events contributed to the projects' schedule disturbances. This is because most of the projects rely on manpower and supply chains which were heavily disrupted due to the protective measures. For that, a study was conducted to evaluate the impact on the construction projects in Saudi Arabia, to what extent the schedule projects were affected, and what were the main reasons for the schedule delays. The research relied on a field survey and schedule analysis for 12 projects which resulted in identifying several causes of delays and the delayed durations that the projects in Saudi Arabia were facing. This research allows those in construction fields to identify the main causes of delays in order to avoid or minimize the impact of these issues on future projects.
ContributorsObeid, Muhammad Hasan Hani (Author) / Ariaratnam, Samuel (Thesis advisor) / El Asmar, Mounir (Committee member) / Chong, Oswald (Committee member) / Arizona State University (Publisher)
Created2021
187425-Thumbnail Image.png
Description
Following the 1991 Gulf War, the ruling royal family of Saudi Arabia constrained the religious establishment by remapping the hierarchy of authority in the kingdom legally, conceptually, and historically. Ṣaddām Ḥusayn’s invasion of Kuwait in 1990 constituted an unprecedented crisis in Saudi politics which contributed to the religious establishment questioning

Following the 1991 Gulf War, the ruling royal family of Saudi Arabia constrained the religious establishment by remapping the hierarchy of authority in the kingdom legally, conceptually, and historically. Ṣaddām Ḥusayn’s invasion of Kuwait in 1990 constituted an unprecedented crisis in Saudi politics which contributed to the religious establishment questioning the political legitimacy of the ruling royal family, Al Saud. The elite religious establishment, or ulamā, publicly challenged the legitimacy of Al Saud’s unchecked authority when they composed the 1991 Letter of Demands. After the war, I suggest that ruling elites set out to change the basis of their political legitimacy by redefining the religiopolitical orthodoxy which governs their relationship with the religious establishment. I propose that the 1992 Basic Law of Governance—the first positive legal charter for the Kingdom of Saudi Arabia—expands the authority of the King while offering the appearance of constraining the exercise of political authority. In this thesis, I analyze the ways in which the text of the Letter of Demands and the Basic Law of Governance offer disparate visions of orthodox Islamic governance according to the Saudi tradition. I hypothesize that the text of the Letter of Demands, as well as the circumstances surrounding its production, involved a reassertion of authority by the elite religious establishment in religious spaces. I suggest that, in response, the Basic Law of Governance expanded the authority of the King and delivered an alternative vision of Saudi orthoprax governance. I contemplate some of the ways that expanding their authority was part of a larger project undertaken by the royal family after the 1991 Gulf War to redefine Saudi religiopolitical orthodoxy. Finally, I offer a meditation on the idea that the project undertaken by Al Saud to redefine Saudi religiopolitical orthodoxy necessitated reformulating the historical narrative of the kingdom’s origin and policy in the twentieth century. In this thesis, I set out to contemplate the epistemic relationship between sociopolitical inflection and diachronic changes to Islamic concepts. In other words, how do Islamic concepts, and the practices they underlie, change over time and in response to moments of social and political crisis? This is where I imagine my work broadly contributing to Religious Studies as a field. I am interested in historical instances where political authorities instrumentalize cultural forms, including historical narratives and religious discourses, to legitimize their own interests, consolidate power, and maintain hegemony. The instrumentalization of religiocultural discourses in order to articulate new modes of state and subject formation is a vital topic of inquiry. I aspire that my work can contribute to this tertiary dialogue by showcasing one historical instance where religious concepts and historical narratives were instrumentalized to legitimize elite interests, consolidate monopolistic political power, and maintain social, political, and cultural forms of hegemony. My aim is to use these narratives about epistemic violence to trouble the power dynamics that get reproduced in Euro-North American knowledge produced about the Global South.
ContributorsBean, Skyler Allen (Author) / Talebi, Shahla (Thesis advisor) / Liew, Han Hsien (Committee member) / Alhassan, Shamara Wyllie (Committee member) / Arizona State University (Publisher)
Created2023
157746-Thumbnail Image.png
Description
Imagine you live in a place without any storm water or wastewater systems!

Wastewater and storm water systems are two of the most crucial systems for urban infrastructure. Water resources have become more limited and expensive in arid and semi-arid regions. According to the fourth World Water Development Report, over

Imagine you live in a place without any storm water or wastewater systems!

Wastewater and storm water systems are two of the most crucial systems for urban infrastructure. Water resources have become more limited and expensive in arid and semi-arid regions. According to the fourth World Water Development Report, over 80% of global wastewater is released into the environment without adequate treatment. Wastewater collection and treatment systems in the Kingdom of Saudi Arabia (KSA) covers about 49% of urban areas; about 25% of treated wastewater is used for landscape and crop irrigation (Ministry of Environment Water and Agriculture [MEWA], 2017). According to Guizani (2016), during each event of flooding, there are fatalities. In 2009, the most deadly flood occurred in Jeddah, KSA within more than 160 lives lost. As a consequence, KSA has set a goal to provide 100% sewage collection and treatment services to every city with a population above 5000 by 2025, where all treated wastewater will be used.

This research explores several optimization models of planning and designing collection systems, such as regional wastewater and stormwater systems, in order to understand and overcome major performance-related disadvantages and high capital costs. The first model (M-1) was developed for planning regional wastewater system, considering minimum costs of location, type, and size sewer network and wastewater treatment plants (WWTPs). The second model (M-2) was developed for designing a regional wastewater system, considering minimum hydraulic design costs, such as pump stations, commercial diameters, excavation costs, and WWTPs. Both models were applied to the Jizan region, KSA.

The third model (M-3) was developed to solve layout and pipe design for storm water systems simultaneously. This model was applied to four different case scenarios, using two approaches for commercial diameters. The fourth model (M-4) was developed to solve the optimum pipe design of a storm sewer system for given layouts. However, M-4 was applied to a storm sewer network published in the literature.

M-1, M-2, and M-3 were developed in the general algebraic modeling system (GAMS) program, which was formulated as a mixed integer nonlinear programming (MINLP) solver, while M-4 was formulated as a nonlinear programming (NLP) procedure.
ContributorsAlfaisal, Faisal M (Author) / Mays, Larry W. (Thesis advisor) / Mascaro, Giuseppe (Committee member) / Fox, Peter (Committee member) / Arizona State University (Publisher)
Created2019