Matching Items (2)
Filtering by

Clear all filters

Description
The Phoenix-Metro area currently has problems with its transportation systems. Over-crowded and congested freeways have slowed travel times within the area. Express bus transportation and the existence of "High Occupancy" lanes have failed to solve the congestion problem. The light rail system is limited to those within a certain distance

The Phoenix-Metro area currently has problems with its transportation systems. Over-crowded and congested freeways have slowed travel times within the area. Express bus transportation and the existence of "High Occupancy" lanes have failed to solve the congestion problem. The light rail system is limited to those within a certain distance from the line, and even the light rail is either too slow or too infrequent for a commuter to utilize it effectively. To add to the issue, Phoenix is continuing to expand outward instead of increasing population density within the city, therefore increasing the time it takes to travel to downtown Phoenix, which is the center of economic activity. The people of Phoenix and its surrounding areas are finding that driving themselves to work is just as cost-effective and less time consuming than taking public transportation. Phoenix needs a cost-effective solution to work in co- existence with improvements in local public transportation that will allow citizens to travel to their destination in just as much time, or less time, than travelling by personal vehicle.
ContributorsSerfilippi, Jon (Author) / Ariaratnam, Samuel (Thesis director) / Pendyala, Ram (Committee member) / Pembroke, Jim (Committee member) / Barrett, The Honors College (Contributor) / Ira A. Fulton School of Engineering (Contributor)
Created2012-12
158284-Thumbnail Image.png
Description
Water utilities across the United States are facing numerous challenges, such as limited funding and increasing project complexity, in constructing and upgrading their aging infrastructure. One innovative method to overcome these challenges is through the use of alternative project delivery methods (APDM), such as construction management at-risk (CMAR) and design-build

Water utilities across the United States are facing numerous challenges, such as limited funding and increasing project complexity, in constructing and upgrading their aging infrastructure. One innovative method to overcome these challenges is through the use of alternative project delivery methods (APDM), such as construction management at-risk (CMAR) and design-build (DB). Previous research has shown that APDM have the potential to deliver higher performing water infrastructure projects when compared to the traditional design-bid-build (DBB) method. However, there is a need to further examine APDM practices and develop tools that may support utilities in the delivery of their APDM water infrastructure projects. This study fills the knowledge gap by conducting several studies that may support public and private utilities in improving the delivery of their APDM water infrastructure projects. First, APDM implementation practices for water infrastructure projects are identified by assessing the state of practice, particularly during project procurement and execution. Second, DB project administration best practices are determined to support utilities seeking to add DB to their organization’s project delivery toolbox. Third, a pioneering web-based project delivery method decision-support tool was developed to aid utilities in selecting the appropriate delivery method for their water project. Finally, project-specific factors and attributes that impact project delivery performance are investigated through exploratory modeling and analysis. The study collected data on 75 completed treatment plant projects, conducted interviews with ten utilities that successfully deliver their water projects using DB, and worked closely with several industry experts through industry workshops and panels. Key findings related to water infrastructure project delivery revealed in this study included: (1) guaranteed maximum price (GMP) is the preferred compensation type for APDM projects; (2) utilities statistically having the lowest comfort level with delivering CMAR projects; (3) qualifications-based procurement is an effective DB project delivery practice; (4) the identification of 13 key project delivery method selection factors; and (5) the three highest predictors that impact unit cost performance are project complexity, project team chemistry and communication, and project size.
ContributorsFeghaly, Jeffrey (Author) / El Asmar, Mounir (Thesis advisor) / Ariaratnam, Samuel (Thesis advisor) / Bearup, Wylie (Committee member) / Arizona State University (Publisher)
Created2020