Productivity in the construction industry is an essential measure of production efficiency and economic progress, quantified by craft laborers' time spent directly adding value to a project. In order to better understand craft labor productivity as an aspect of lean construction, an activity analysis was conducted at the Arizona State

Productivity in the construction industry is an essential measure of production efficiency and economic progress, quantified by craft laborers' time spent directly adding value to a project. In order to better understand craft labor productivity as an aspect of lean construction, an activity analysis was conducted at the Arizona State University Palo Verde Main engineering dormitory construction site in December of 2016. The objective of this analysis on craft labor productivity in construction projects was to gather data regarding the efficiency of craft labor workers, make conclusions about the effects of time of day and other site-specific factors on labor productivity, as well as suggest improvements to implement in the construction process. Analysis suggests that supporting tasks, such as traveling or materials handling, constitute the majority of craft labors' efforts on the job site with the highest percentages occurring at the beginning and end of the work day. Direct work and delays were approximately equal at about 20% each hour with the highest peak occurring at lunchtime between 10:00 am and 11:00 am. The top suggestion to improve construction productivity would be to perform an extensive site utilization analysis due to the confined nature of this job site. Despite the limitations of an activity analysis to provide a complete prospective of all the factors that can affect craft labor productivity as well as the small number of days of data acquisition, this analysis provides a basic overview of the productivity at the Palo Verde Main construction site. Through this research, construction managers can more effectively generate site plans and schedules to increase labor productivity.
ContributorsFord, Emily Lucile (Author) / Grau, David (Thesis director) / Chong, Oswald (Committee member) / Civil, Environmental and Sustainable Engineering Programs (Contributor) / School of International Letters and Cultures (Contributor) / Barrett, The Honors College (Contributor)
Created2016-12
155422-Thumbnail Image.png
Description
The performance of the Alpha Sprayed Polyurethane Foam (SPF) roofing system is perceived as not an economical option when compared to a 20-year modified bitumen roofing system. Today, the majority of roofs are being replaced, rather than newly installed. The coating manufacturer, Neogard, implemented the Alpha roofing program to identify

The performance of the Alpha Sprayed Polyurethane Foam (SPF) roofing system is perceived as not an economical option when compared to a 20-year modified bitumen roofing system. Today, the majority of roofs are being replaced, rather than newly installed. The coating manufacturer, Neogard, implemented the Alpha roofing program to identify the best contractors in the industry and to measure their roof performance. The Alpha roof system has shown consistent high performance on over 230 million square feet of surveyed roof. The author proposes to identify if the Alpha roof system is renewable, has proven performance that competes with the traditional modified roofing system, and is a more economical option by evaluating an Alpha roof system installation and the performance of a 29-year-old Alpha roof system. The Dallas Independent School District utilized the Alpha program for William Lipscomb Elementary School in 2016. Dallas Fort Worth Urethane installed the Alpha SPF roof system with high customer satisfaction ratings. This roofing installation showed the value of the Alpha roof system by saving over 20% on costs for the installation and will save approximately 69% of costs on the recoating of the roof in 20 years. The Casa View Elementary School roof system was installed with a Neogard Permathane roof system in 1987. This roof was hail tested with ten drops from 17 feet 9 inches of 1-3/4-inch steel ball (9 out of 10 passed) and four drops from 17 feet 9 inches with a 3-inch diameter steel ball (2 out of 4 passed). The analysis of the passing and failing core samples show that the thickness of the top and base Alpha SPF coating is one of the major differences in a roof passing or failing the FM-SH hail test. Over the 40-year service life, the main difference of purchasing a 61,000 square feet Alpha SPF roof versus modified bitumen roof are savings of approximately $1,067,500. Past hail tests on Alpha SPF roof systems show its cost effectiveness with high customer satisfaction (9.8 out of 10), an over 40-year service life after a $6.00/SF recoat and savings of over $1M for DISD.
ContributorsZulanas, Charles J., IV (Author) / Kashiwagi, Dean T. (Thesis advisor) / Kashiwagi, Jacob S (Thesis advisor) / Chong, Oswald (Committee member) / Arizona State University (Publisher)