Matching Items (1)
Filtering by

Clear all filters

158595-Thumbnail Image.png
Description
The applications of Building Information Modelling (BIM) technology extend beyond performing clash detection and avoiding installation issues among subcontractors. When properly budgeted and fully integrated into the pre-construction work-flow, BIM technology can improve the accuracy of estimates and reduce material as well as labor costs. The purpose of this paper

The applications of Building Information Modelling (BIM) technology extend beyond performing clash detection and avoiding installation issues among subcontractors. When properly budgeted and fully integrated into the pre-construction work-flow, BIM technology can improve the accuracy of estimates and reduce material as well as labor costs. The purpose of this paper is to analyze BIM-related budgeting practices and explore options for optimizing BIM budgeting strategy as well as integrating BIM technology into an estimating strategy. The methodology chosen was a case study. A study of an electrical contractor was conducted using BIM budgeting data based on actual and estimated figures for 245 jobs completed in the years 2015-2019. A review of literature was conducted for the purpose of researching current options with regard to the implementation of BIM as part of estimation, its associated financial cost, and the challenges faced in adapting existing frameworks to meet new demands. It was observed that the current resources allocated for BIM are under-utilized on an aggregate basis. It was also observed that the budget for these resources is sometimes exceeded for larger projects and frequently, grossly under-utilized for smaller projects. There is a strong correlation between contract value and project type, suggesting that contract value is a primary predictor of BIM requirements. The review of literature suggests what employee skills are most necessary for integrating BIM with estimating: the ability to perform accurate takeoffs from BIM models, evaluate the cost of materials that are typically not modeled or appear poorly in the model, the ability to work with a variety of BIM software, the ability to know if a model is accurate, and an understanding of how the model interacts with other aspects of the construction process. It also discusses the challenges faced when adopting BIM in estimation. This paper contributes to the field of construction management by expanding the body of research for the BIM budgeting strategy in electrical contracting; an area of research which is not well developed. The data analyzed from this single electrical contractor provides the basis for an exploratory case study that contributes to the development of a conceptual framework for accurate BIM budgeting, where no such framework had previously existed.
ContributorsBalmer, Steven Thomas (Author) / Sullivan, Kenneth (Thesis advisor) / Smithwick, Jake (Committee member) / Stone, Brian (Committee member) / Arizona State University (Publisher)
Created2020