Matching Items (7)
Filtering by

Clear all filters

136548-Thumbnail Image.png
Description
The value of data in the construction industry is driven by the actual worth or usefulness the data can provide. The revolutionary method of Best Value Performance Information Procurement System implemented into the industry by the Performance Based Studies Research Group at ASU optimizes the value of data. By simplifying

The value of data in the construction industry is driven by the actual worth or usefulness the data can provide. The revolutionary method of Best Value Performance Information Procurement System implemented into the industry by the Performance Based Studies Research Group at ASU optimizes the value of data. By simplifying the details and complexity of a construction project through dominant and logical thinking, the Best Value system delivers efficient, non-risk success. The Best Value model's implementation into industry projects is observed in the PBSRG Minnesota projects in order to improve data collection and metric analysis. The Minnesota projects specifically have an issue with delivering Best Value transparency, the notion that the details of project data should be used to support dominant ideas. By improving and simplifying the data collection tools of PBSRG, Best Value transparency can be achieved more easily and effective, in turn improved the Best Value system.
ContributorsMisiak, Erik Richard (Author) / Kashiwagi, Dean (Thesis director) / Kashiwagi, Jacob (Committee member) / Barrett, The Honors College (Contributor) / Mechanical and Aerospace Engineering Program (Contributor)
Created2015-05
135838-Thumbnail Image.png
Description
In this paper, the impact of running a Best Value system in a student-run/volunteer group is measured, documented, and analyzed. The group being used for this test is the Arizona State University Society of Automotive Engineers Formula Team. The Arizona State University Society of Automotive Engineers Formula Team has participated

In this paper, the impact of running a Best Value system in a student-run/volunteer group is measured, documented, and analyzed. The group being used for this test is the Arizona State University Society of Automotive Engineers Formula Team. The Arizona State University Society of Automotive Engineers Formula Team has participated in national Formula SAE competitions since at least 1992, however, in the last twenty years, the team has only been able to produce one car that was able to finish the competition on time. In a similar time period, Best Value has been successfully tested on over 1860 professional projects with a 95% satisfaction rating. Using the Best Value approach to increase transparency and accountability through simple metrics and documentation, the 2016 Arizona State University Society of Automotive Engineers Formula Team was able to complete their car in 278 days. In comparison, it took 319 days for the 2015 team and 286 for the average collegiate team. This is an improvement of 13% when compared to the 2015 team and 3% when compared to the average collegiate team. With these results it can be deduced that the Best Value approach is a viable method for improving efficiency of student-run and volunteer organizations. It is the recommendation of this report that the Arizona State University Society of Automotive Engineers Formula Team continue to utilize Best Value practices and run this system again each year moving forward. This consistent documentation should result in continuous improvement in the time required to complete the car as well as its quality.
ContributorsWojtas, Thomas Samuel (Author) / Trimble, Steven (Thesis director) / Kashiwagi, Dean (Committee member) / Kashiwagi, Jacob (Committee member) / WPC Graduate Programs (Contributor) / Mechanical and Aerospace Engineering Program (Contributor) / Barrett, The Honors College (Contributor)
Created2016-05
136855-Thumbnail Image.png
Description
The aim of this thesis is to explain the dichotomy between public perception of leadership and quantifiable measurement of leadership based on Information Measurement Theory, a method of utilizing deductive logic, and to identify and interpret the causes of such discrepancies as seen in the case of Steve Jobs. The

The aim of this thesis is to explain the dichotomy between public perception of leadership and quantifiable measurement of leadership based on Information Measurement Theory, a method of utilizing deductive logic, and to identify and interpret the causes of such discrepancies as seen in the case of Steve Jobs. The general public perceives Steve Jobs to be an effective leader because he was visionary, entrepreneurial, charismatic and highly successful. However, these perceptions are not true indicators of leadership but rather qualitative interpretations of leadership without tangible evidence in support of this idea. An analysis of words found in multiple appearances of online articles relating to Steve Jobs and leadership revealed a variety of common factors associated with Steve Jobs' leadership, supporting a primarily positive viewpoint by the public. The thesis then identified how a new methodology of measuring leadership effectiveness based on quantitative data, known as the New Leadership Model, concludes Steve Jobs does not meet the criteria necessary to be considered a Best Value Leader, one who uses alignment rather than management, direction and control to achieve maximum efficiency within an organization. The discrepancies between public perception of Steve Jobs as a leader and the results of the New Leadership Model evaluation show significant variance. Potential rationale for these variances is offered in the thesis. In conclusion, the thesis argues that public perception will often differ from quantifiable measurement of leadership based on the interpretation of leadership by various groups and by the methods each group uses to identify characteristics of effective leadership.
Created2014-05
134230-Thumbnail Image.png
Description
Information Measurement Theory (IMT) is a system created by Dr. Dean Kashiwagi to minimize subjective decision-making, the amount of data needed to understand situations, and optimize processes by removing risk. IMT uses the ideas of Kashiwagi Solution Models to identify high performing and low performing characteristics. IMT proposes the usage

Information Measurement Theory (IMT) is a system created by Dr. Dean Kashiwagi to minimize subjective decision-making, the amount of data needed to understand situations, and optimize processes by removing risk. IMT uses the ideas of Kashiwagi Solution Models to identify high performing and low performing characteristics. IMT proposes the usage of Best Value Approaches to achieve high performance while minimizing risk through quality control. For my project, I prove how IMT can be applied to a long-term project to reduce stress, create a quality product, and minimize opportunities for failure. My project focuses on the creation and release of a vinyl record. IMT was developed for use with construction projects, so my goal is to apply IMT ideals to an industry where it has not been used whatsoever and show how IMT can be applied to any project that is either difficult, requires careful analysis of options, or is completed on a long-term basis. Since I am not an expert in music production or releasing physical copies of music, I also prove that IMT helps provide guidelines and measures of how to complete a project where not all information is known at the beginning. With the usage of dominant information and the alignment of expert assistance, a high quality product was produced and a successful release followed.
ContributorsPfisthner, Jess (Author) / Kashiwagi, Dean (Thesis director) / Kashiwagi, Jacob (Contributor) / Barrett, The Honors College (Contributor)
Created2017-05
155493-Thumbnail Image.png
Description
This thesis presents a literature research analyzing the cost overrun of the construction industry worldwide, exploring documented causes for cost overrun, and documented parties responsible for the inefficiency. The analysis looks at a comparison between the metrics of construction projects in different continents and regions. Multiple publication databases were used

This thesis presents a literature research analyzing the cost overrun of the construction industry worldwide, exploring documented causes for cost overrun, and documented parties responsible for the inefficiency. The analysis looks at a comparison between the metrics of construction projects in different continents and regions. Multiple publication databases were used to look into over 300 papers. It is shown that although construction demands are increasing, cost overrun on these projects is not decreasing at the same rate around the world. This thesis also presents a possible solution to improve cost overrun in the construction industry, through the use of the Best Value Performance Information Procurement System (BV PIPS). This is a system that has been utilized in various countries around the world, and has documented evidence that it may be able to alleviate the overrun occurring in the construction industry.
ContributorsGoyal, Abhinav (Author) / Kashiwagi, Jacob (Thesis advisor) / Kashiwagi, Dean (Committee member) / Chong, Oswald (Committee member) / Arizona State University (Publisher)
Created2017
155168-Thumbnail Image.png
Description
Saudi Arabia has been facing issues with completing construction projects on time and on budget. It has been documented that 70% of public construction projects are delayed. Studies have identified the low-bid delivery method as an important factor in causing such delays. The procurement system (low-bid) ignores contractors’ performance, and

Saudi Arabia has been facing issues with completing construction projects on time and on budget. It has been documented that 70% of public construction projects are delayed. Studies have identified the low-bid delivery method as an important factor in causing such delays. The procurement system (low-bid) ignores contractors’ performance, and that is reflected in projects’ performance. A case study was performed, at a University campus in northern Saudi Arabia, identifying the major causes of project delays and cost overruns. The University was experiencing delays from 50% to 150%. Also, the actual project costs for four projects were examined and found that all four projects’ costs were higher than the original bid. The delay and cost overruns factors were gathered from the University engineers. A literature research identified one construction management method, best value performance information procurement system (BV PIPS), has documented multiple times its ability to improve project performance. In a comparison using the result of a case study and the results of (BV PIPS), Saudi Arabia’s delivery system was identified as a potential cause of project performance issues. The current procurement system was analyzed and modified to adapt with the (BV PIPS). The proposed procurement system using BV PIPS, which can be implemented in Saudi Arabia, was created with owner side. A large survey was conducted of 761 classified contractors and 43 universities’ representatives who rated causes of delay factors and cost overruns. The delay factors were then compared to delay factors experienced on Saudi construction projects, identified by performing a literature research. The comparison identified 14 important causes of delays. Moreover, the survey showed that classified contractors and universities’ representatives unsatisfied with low-bid, and they agreed with BV PIPS which selecting vendors based on performance with price. The proposed model required a submitted level of experience (LE), risk assessment (RA), and value added (VA). Besides, project managers of vendors should be interviewed during the clarification phase. In addition, venders should submit the project’s scope, technical schedule, milestone schedule, and risk management plan. In the execution phase, vendors should submit a weekly risk report (WRR) and director’s report (DR).
ContributorsAlzara, Majed (Author) / Kashiwagi, Dean (Thesis advisor) / Kashiwagi, Jacob (Committee member) / Al-Tassan, Abdulrahman (Committee member) / Arizona State University (Publisher)
Created2016
135972-Thumbnail Image.png
Description
The Performance Based Studies Research Studies Group (PBSRG) at Arizona State University (ASU) has been studying the cause of increased cost and time in construction and other projects for the last 20 years. Through two longitudinal studies with a group of owners in the state of Minnesota (400 tests over

The Performance Based Studies Research Studies Group (PBSRG) at Arizona State University (ASU) has been studying the cause of increased cost and time in construction and other projects for the last 20 years. Through two longitudinal studies with a group of owners in the state of Minnesota (400 tests over six years) and the US Army Medical Command (400 tests over four years), the client/buyer has been identified as the largest risk and source of project cost and time deviations. This has been confirmed by over 1,500 tests conducted over the past 20 years. The focus of this research effort is to analyze the economic and performance impact of a delivery process of construction called the Job Order Contracting (JOC) process, to evaluate the value (in terms of time, cost, and customer satisfaction) achieved when utilizing JOC over other traditional methods to complete projects. JOC's strength is that it minimizes the need for the owner to manage, direct and control (MDC) through a lengthy traditional process of design, bid, and award of a construction contract. The study identifies the potential economic savings of utilizing JOC. This paper looks at the results of an ongoing study surveying eight different public universities. The results of the research show that in comparison to more traditional models, JOC has large cost savings, and is preferable among most owners who have used multiple delivery systems.
ContributorsLi, Hao (Author) / Kashiwagi, Dean (Thesis director) / Kashiwagi, Jacob (Committee member) / Industrial, Systems (Contributor) / Department of Information Systems (Contributor) / Barrett, The Honors College (Contributor)
Created2015-12