Filtering by
- All Subjects: Industrial Engineering
- Creators: Zhang, Muhong
Two general approaches are developed. Both approximate the effects of recourse decisions without actually solving a stochastic model. The first approach procures more reserve whenever approximate recourse policies stress the transmission network. The second approach procures reserve at prime locations by generalizing the existing practice of reserve disqualification. The latter approach is applied for feasibility and is later extended to limit scenario costs. Testing demonstrates expected cost improvements around 0.5%-1.0% for the IEEE 73-bus test case, which can translate to millions of dollars per year even for modest systems. The heuristics developed in this dissertation perform somewhere between established deterministic and stochastic models: providing an economic benefit over current practices without substantially increasing computational times.
In this paper, a literature review is presented on the application of Bayesian networks applied in system reliability analysis. It is shown that Bayesian networks have become a popular modeling framework for system reliability analysis due to the benefits that Bayesian networks have the capability and flexibility to model complex systems, update the probability according to evidences and give a straightforward and compact graphical representation. Research on approaches for Bayesian network learning and inference are summarized. Two groups of models with multistate nodes were developed for scenarios from constant to continuous time to apply and contrast Bayesian networks with classical fault tree method. The expanded model discretized the continuous variables and provided failure related probability distribution over time.
The main approaches are that first the simple plant location formulation is adopted to reformulate the original model. Furthermore, an extended formulation by redefining the idle period constraints is developed to make the formulation tighter. Then for the purpose of evaluating the solution quality from heuristic, three types of valid inequalities are added to the model. A fix-and-optimize heuristic with two-stage product decomposition and period decomposition strategies is proposed to solve the formulation. This generic heuristic solves a small portion of binary variables and all the continuous variables rapidly in each subproblem. In addition, the case with demand backlogging is also incorporated to demonstrate that making additional assumptions to the basic formulation does not require to completely altering the heuristic.
The contribution of this thesis includes several aspects: the computational results show the capability, flexibility and effectiveness of the approaches. The average optimality gap is 6% for data without backlogging and 8% for data with backlogging, respectively. In addition, when backlogging is not allowed, the performance of fix-and-optimize heuristic is stable regardless of period length. This gives advantage of using such approach to plan longer production schedule. Furthermore, the performance of the proposed solution approaches is analyzed so that later research on similar topics could compare the result with different solution strategies.